1、*USACE / NAVFAC / AFCESA / NASA UFGS-11 13 10 (August 2009)-Preparing Activity: USACE SupersedingUFGS-11 13 10 (October 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2009*SECTION TABLE OF CONTENTSDIVISION 11 - EQUIPMENTSECTION 11 13 10DOCK LEVELERS08/09
2、PART 1 GENERAL1.1 REFERENCES1.2 DEFINITIONS1.2.1 Industrial Dock Leveler1.2.2 Adjustable Loading Ramp1.2.3 Fixed Type Industrial Dock Leveler1.2.4 Velocity Fuse1.2.5 Carrier1.3 SUBMITTALS1.4 QUALITY ASSURANCE1.4.1 Manufacturers Representative1.4.2 Detail Drawings1.4.3 Record Drawings1.5 DELIVERY, ST
3、ORAGE, AND HANDLING1.6 EXTRA MATERIALSPART 2 PRODUCTS2.1 MATERIALS2.1.1 Standard Products2.1.2 Exposed Surfaces2.1.3 Naneplate2.1.4 Toe Guards or Skirts2.2 LOADING DOCK LEVELERS2.2.1 Design Requirements2.2.2 Dock Leveler Height Adjustment2.2.3 Dock Leveler Extension and Retraction2.2.4 Loading Ramp
4、Compensation2.2.4.1 Freight Carrier Out of Level2.2.4.2 Loading and Unloading of the Freight Carrier2.2.5 Safety Devices2.2.5.1 Electro-Hydraulic System2.2.5.2 Mechanical System2.2.5.3 Air Powered System2.2.5.4 Dock BumpersSECTION 11 13 10 Page 1Provided by IHSNot for ResaleNo reproduction or networ
5、king permitted without license from IHS-,-,-2.2.6 Rated Capacity2.2.7 Ramp Load Carrying Surface2.3 OPERATION2.3.1 Mechanical Control2.3.2 Electro-Hydraulic Control2.3.2.1 Pushbutton2.3.2.2 Hinged Lip Ramp Movement2.4 CONSTRUCTION AND MATERIALS2.5 ELECTRO-HYDRAULIC SYSTEM2.6 ELECTRICAL REQUIREMENTS2
6、.6.1 Motor2.6.2 Controls2.6.3 Transformer2.7 ACCESSORIES2.7.1 Restraining Device2.7.2 Dock BumpersPART 3 EXECUTION3.1 EXAMINATION3.2 INSTALLATION3.3 CLEANING, TREATMENT AND PAINTING3.3.1 Workmanship3.3.2 Dissimilar Metals Protection3.3.3 Finish Coat Color3.4 FIELD TESTS3.4.1 Roll-Over Load Tests3.4.
7、2 Drop Tests3.4.3 Acceptance Tests3.5 INSTRUCTION TO GOVERNMENT PERSONNEL3.6 OPERATING MANUALS- End of Section Table of Contents -SECTION 11 13 10 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-11 13 10 (Au
8、gust 2009)-Preparing Activity: USACE SupersedingUFGS-11 13 10 (October 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2009*SECTION 11 13 10DOCK LEVELERS08/09*NOTE: This guide specification covers requirements for dock bumpers, truck-trailer restraining d
9、evices, and industrial, mechanical and electro-hydraulic dock levelers of the fixed hinged type.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information
10、and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designatio
11、n and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).This guide specification includes tailoring options for NASA and NAVY. Selection or deselection of a tailoring option will include or exclude that option in the section, bu
12、t editing the resulting section to fit the project is still required.*PART 1 GENERAL*NOTE: Use dock levelers (ramps) to span and compensate for space and height differentials between loading docks and freight carriers in order to facilitate safe and efficient freight transfer. The ramps are recessed
13、 into preformed pits in the loading docks.*SECTION 11 13 10 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are
14、referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. A
15、lso use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part
16、 of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.ASTM INTERNATIONAL (ASTM)ASTM A 123/A 123M (2009) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel ProductsASTM A 143/A 143M (2007) Standard
17、Practice for Safeguarding Against Embrittlement of Hot-Dip Galvanized Structural Steel Products and Procedure for Detecting EmbrittlementASTM A 153/A 153M (2009) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel HardwareASTM D 2000 (2008) Standard Classification System for Rubber P
18、roducts in Automotive ApplicationsNATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)NEMA ICS 2 (2000; Errata 2002; R 2005; Errata 2006) Standard for Industrial Control and Systems: Controllers, Contactors, and Overload Relays Rated Not More than 2000 Volts AC or 750 Volts DC: Part 8 - Disconnect D
19、evices for Use in Industrial Control EquipmentNEMA ICS 6 (1993; R 2006) Standard for Industrial Controls and Systems EnclosuresSECTION 11 13 10 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-NEMA MG 1 (2007; Errata 2008) Standard for Motors an
20、d GeneratorsNATIONAL FIRE PROTECTION ASSOCIATION (NFPA)NFPA 70 (2008; AMD 1 2008) National Electrical Code - 2008 EditionUNDERWRITERS LABORATORIES (UL)UL 943 (2006; Rev thru Feb 2008) Ground-Fault Circuit-Interrupters1.2 DEFINITIONS1.2.1 Industrial Dock LevelerA manufactured structure designed to sp
21、an and compensate space and height differentials between a loading dock and freight carrier to facilitate safe, efficient, freight transfer.1.2.2 Adjustable Loading RampSynonym for Fixed Type Industrial Dock Leveler.1.2.3 Fixed Type Industrial Dock LevelerA dock leveler that is permanently affixed t
22、o the dock structure, and usually incorporating an electro-hydraulic a mechanical recessed into dock face further than 380 mm 15 inch system to position the dock leveler with respect to the freight carrier at the lip end while being fixed at the opposite hinged end.1.2.4 Velocity FuseA valve or simi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS1113102009DOCKLEVELERS 装货 跳板 PDF