ARMY UFGS-10 10 00-2009 VISUAL COMMUNICATIONS SPECIALTIES《可视化通讯特殊设备》.pdf
《ARMY UFGS-10 10 00-2009 VISUAL COMMUNICATIONS SPECIALTIES《可视化通讯特殊设备》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-10 10 00-2009 VISUAL COMMUNICATIONS SPECIALTIES《可视化通讯特殊设备》.pdf(14页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-10 10 00 (February 2009)-Preparing Activity: USACE SupersedingUFGS-10 10 00 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2008*SECTION TABLE OF CONTENTSDIVISION 10 - SPECIALTIESSECTION 10 10 00VISUAL COMMUN
2、ICATIONS SPECIALTIES02/09PART 1 GENERAL1.1 REFERENCES1.2 SYSTEM DESCRIPTION1.3 SUBMITTALS1.4 DELIVERY, STORAGE, AND HANDLING1.5 WARRANTYPART 2 PRODUCTS2.1 MATERIALS2.1.1 Porcelain Enamel2.1.2 Cork2.1.2.1 Colored Cork2.1.2.2 Natural Cork2.1.3 Woven Fabric2.1.4 Non-Woven Fabric2.1.5 Vinyl Wall Coverin
3、g2.1.6 Aluminum2.1.7 Hardwood2.1.8 Glass2.2 PRESENTATION BOARD2.3 MARKERBOARD2.4 TACKBOARDS2.4.1 Cork2.4.2 Vinyl Covered2.4.3 Fabric Covered2.5 CASE FOR BOARD UNIT2.6 DISPLAY TRACK SYSTEM2.7 HORIZONTAL SLIDING UNITS2.8 COPYBOARD2.9 PROJECTION SCREEN2.10 COLORPART 3 EXECUTIONSECTION 10 10 00 Page 1Pr
4、ovided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.1 PLACEMENT SCHEDULE3.2 INSTALLATION3.3 CLEANING- End of Section Table of Contents -SECTION 10 10 00 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,
5、-,-*USACE / NAVFAC / AFCESA / NASA UFGS-10 10 00 (February 2009)-Preparing Activity: USACE SupersedingUFGS-10 10 00 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2008*SECTION 10 10 00VISUAL COMMUNICATIONS SPECIALTIES02/09*NOTE: This guide spec
6、ification covers the requirements for visual communications specialties.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not req
7、uired in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number,
8、is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation
9、only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference
10、 feature to update the issue dates.SECTION 10 10 00 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile refere
11、nces in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)ANSI Z97.1 (2004) Safety Glazing Materials Used in B
12、uildingsASTM INTERNATIONAL (ASTM)ASTM B 221 (2008) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and TubesASTM B 221M (2007) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes (Metric)ASTM C 1048 (2004)
13、Standard Specification for Heat-Treated Flat Glass - Kind HS, Kind FT Coated and Uncoated GlassASTM E 84 (2008a) Standard Test Method for Surface Burning Characteristics of Building MaterialsASTM F 148 (2002; r 2007) Binder Durability of Cork Composition Gasket MaterialsASTM F 152 (1995; R 2002) Ten
14、sion Testing of Nonmetallic Gasket MaterialsASTM F 793 (2007) Wallcovering by Durability Characteristics1.2 SYSTEM DESCRIPTION*NOTE: The designer has the option to require that visual display boards for a project be provided by one manufacturer when appropriate. It is the designers responsibility to
15、 determine if all products being specified for a project are available from a minimum of three manufacturers. Not all manufacturers produce the variety of visual display boards offered in this specification.Alternate frame methods such as: self-edge for fabric or vinyl covered tackboards, vinyl edge
16、 on tackboards, and markerboards are options but are not available from all manufacturers. Designer must SECTION 10 10 00 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-research available sources.*The term visual display board when used herein
17、 includes presentation boards, marker boards, tackboards, board cases, display track system and horizontal sliding units. Visual display boards shall be from manufacturers standard product line.1.3 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURE
18、S and edit the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are already marked with a
19、“G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a co
20、de of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organizat
21、ion in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item f
22、or Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval. information only. When used, a designation following the “G“ designation identifies the office that will review the submittal
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS1010002009VISUALCOMMUNICATIONSSPECIALTIES 可视化 通讯 特殊 设备 PDF

链接地址:http://www.mydoc123.com/p-449609.html