ARMY UFGS-08 52 70-2009 WOOD WINDOWS - REPAIR AND REHABILITATION《木窗 修理和复原》.pdf
《ARMY UFGS-08 52 70-2009 WOOD WINDOWS - REPAIR AND REHABILITATION《木窗 修理和复原》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-08 52 70-2009 WOOD WINDOWS - REPAIR AND REHABILITATION《木窗 修理和复原》.pdf(10页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-08 52 70 (August 2009)-Preparing Activity: USACE SupersedingUFGS-08 52 70 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2009*SECTION TABLE OF CONTENTSDIVISION 08 - OPENINGSSECTION 08 52 70WOOD WINDOWS - REPAIR
2、 AND REHABILITATION08/09PART 1 GENERAL1.1 REFERENCES1.2 SYSTEM DESCRIPTION1.3 SUBMITTALS1.4 QUALITY ASSURANCE1.5 DELIVERY, STORAGE, AND HANDLINGPART 2 PRODUCTS2.1 MATERIALS2.2 WOOD2.3 GLASS AND GLAZING2.4 HARDWARE2.5 FASTENERS2.6 GLAZING COMPOUND2.7 GLAZING POINTS2.8 EPOXY CONSOLIDANTS2.8.1 Liquid C
3、onsolidant2.8.2 Epoxy PastePART 3 EXECUTION3.1 EVALUATION3.2 REPAIRS3.2.1 Example Window3.2.2 Sash Removal3.2.3 Paint Removal3.2.4 Wood Repair3.2.5 Epoxy Wood Repair3.2.5.1 Epoxy Liquid Wood Consolidant3.2.5.2 Epoxy Paste3.2.6 Wood Replacement3.2.7 Hardware3.2.8 Glazing3.2.9 Operating SystemSECTION
4、08 52 70 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.2.10 Weatherstripping and Moldings3.3 PAINTING PREPARATION3.4 PAINTING3.5 REASSEMBLY3.6 ADJUSTMENTS3.7 CLEANING- End of Section Table of Contents -SECTION 08 52 70 Page 2Provided by IHS
5、Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-08 52 70 (August 2009)-Preparing Activity: USACE SupersedingUFGS-08 52 70 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2009*S
6、ECTION 08 52 70WOOD WINDOWS - REPAIR AND REHABILITATION08/09*NOTE: This guide specification covers the requirements for repair and rehabilitation of wood windows in historic buildings.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed
7、 items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the s
8、pecification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publications
9、cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Artic
10、le to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update SECTION 08 52 70 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-the issue dates.References not used in the text
11、will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic d
12、esignation only.ASTM INTERNATIONAL (ASTM)ASTM C 1184 (2005) Standard Specification for Structural Silicone Sealants1.2 SYSTEM DESCRIPTIONThe Contractor shall repair wood windows as indicated, and shall return them to proper operation and sound condition.1.3 SUBMITTALS*NOTE: Review submittal descript
13、ion (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Gov
14、ernment approval. Some submittals are already marked with a “G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For sub
15、mittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“
16、for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Fo
17、rce and NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for submittals with a “G“ designation; SECTION 08 52 70 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-submittals not having a “G“ de
18、signation are for Contractor Quality Control approval. information only. When used, a designation following the “G“ designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-02 Shop DrawingsSh
19、op Drawings; G; G, _Shop drawings as specified.SD-03 Product DataHardwareWeatherstrippingManufacturers installation instructions for each type of hardware and weatherstripping.QualificationsDocumentation showing qualifications of personnel proposed to perform the window repair and rehabilitation wor
20、k, and a listing identifying prior installations completed by the Contractor.SD-04 SamplesHardwareRepresentative sample of each type of hardware with identifying tags.MoldingsA 300 mm 12 inch long piece of each molding type required for each window and casing with specified finish.WeatherstrippingA
21、300 mm 12 inch long sample of each type of weatherstripping required with fasteners.1.4 QUALITY ASSURANCEa. Provide qualified workers trained and experienced in repairing, restoring, replicating, and replacing windows in historic buildings; submit documentation of their Qualifications during 5 conse
22、cutive years of work of this type; and a list of installations made identifying when, where and for whom the installations were made.b. Submit Shop Drawings indicating elevations of units, full-size sections, fastenings, methods of installation and anchorage, method of glazing, locations of operatin
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS0852702009WOODWINDOWSREPAIRANDREHABILITATION 木窗 修理 复原 PDF

链接地址:http://www.mydoc123.com/p-449584.html