ARMY MIL-W-14960 B-1971 WARHEAD GUIDED MISSILE HE M155 AND WARHEAD GUIDED MISSILE TRAINING M237 PARTS FOR《M155型烈性炸药导弹弹头M237型训练零件》.pdf
《ARMY MIL-W-14960 B-1971 WARHEAD GUIDED MISSILE HE M155 AND WARHEAD GUIDED MISSILE TRAINING M237 PARTS FOR《M155型烈性炸药导弹弹头M237型训练零件》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-W-14960 B-1971 WARHEAD GUIDED MISSILE HE M155 AND WARHEAD GUIDED MISSILE TRAINING M237 PARTS FOR《M155型烈性炸药导弹弹头M237型训练零件》.pdf(19页珍藏版)》请在麦多课文档分享上搜索。
1、- f: r I !-y. I MIL-W-LLIShOB 13 7777706 0278547 7 I I - -. . . MIL-W-1496OB (MU) 30 June 1971 Superseding 2 January 1969 MIL-W-1496OA (MU) MILITARY SPECIFICATION WARHEAD, GUIDED MISSILE HE, XM155E1, AND WARHEAD, GUIDED MISSILE, TRAINING, XM237EJi PARTS FOR 1. SdOPE 1.1 This specification covers qua
2、lity assurance provisions and special requirements not covered by the drawings for the fabrication of the inert parts for Warhead, Guided Missile, HE, XM155E1 and for Warhead, Guided Missile, Training, XM237E1. 2. APPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect on date of inv
3、itation for bids or request for proposals, form a part o9 this specification to the extent specified herein. . SPECIFICATIONS MILITARY MIL-D-1000 - Drawing, Engineering and Associated List STANDARDS MILITARY MIL-STD-105 - Sampling Procedures and Tables for MIL-STD-1167 - Ammunition Data Cards MIL-ST
4、D-1168 - Lot Numbering of Ammunition MIL-STD-1235 - Single and Multilevel Continuous Inspection by Attributes Sampling Procedures and Tables for Inspection by Attributes FSC: 1336 A :-THIS DOCUMENT CONTAINS -,!-!I- PAGES. Licensed by Information Handling ServicesMIL-W-149 6 OB (IV) DRAWINGS US ARMY
5、MUNITION COMMAND 9226302 - Warhead, Guided Missile, HE, XM155E1, Inert Parts Assembly 9230608 - Warhead, Guided Missile, Training, XM237E1, Inert Parts Assembly 9211595 - Crate, Packing, Ammo, Dual for Whd, GM, HE XM155 or Whd, GM, Training, XM237 9211596 - Crate, Packing, Ammo, Single, for Whd, GM,
6、 HE, XM155 or whd, GM, Training, XM237 9233456 - Crate, Packing, Ammo, Dual, Modified for Whd, GM, HE, XM155 or Whd, GM, Training, XM237 PUBLICAT IONS US ARMY MUNITION COMMAND ET-9226302 - Equipment Tabulation ET-9230608 - Equipment Tabulation (Copies of specifications, standards, drawings and publi
7、cations required by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer. 1 3. REQUIREMENTS 3,l Material .-Materials shall be in accordance with applicable drawings and specifications. Inert Parts Assembl
8、ies .-The Inert Parts Assembiies shall comply with all requirements specified on Drawing (dwg.) 9226302 or 9230608, whichever applies, and with all requirements speci.fied in applicable specifications. 3.2 3.3 Mounting Insert Pin.-The Mounting Insert Pin shall be present in each mounting insert. 3.4
9、 Leakage Test of Inert Parts.-The Inert Parts Assembly (dwg. 9226302 or dwg. 9230608, whichever applies) and the Safety and Arming Housing Assembly (dwg. 9226308) shall withstand an internal air pressure test of 2.0 pounds per square inch, minimum, for 60 seconds, minimum, with no evidence of leakag
10、e. 2 r Licensed by Information Handling ServicesMIL-W-14960B (MU) 3.5 Workmanship 3.5.1 Molded Parts.-The Molded Parts shall be free of Small chips at the end of the porosity, warpage in excess of drawing dimensions, checks, cracks, chipped edges, blisters, scratches, and other defects which would a
11、ffect their serviceability. machined cavities will be disregarded. 3.5.2 Foreign Matter.-All parts shall be free of chips, dirt, grease, excess flash, rust, silicone products and other foreign material. The cleaning method shall not be injurious to any of the parts nor shall the parts be contaminate
12、d by the cleaning agent. Surface coatings shall be continuous except for a few slight scratches not exposing base material. 3.5.3 defined. Marking.-All marking shall be neat and sharply 3.6 First Article Inspection.-This specification makes provisions for First Article Inspection. Requirements for t
13、he submission of first article samples by the contractor shall be as spectfied in the contract. 3.7 Inserts.-The liner inserts (dwg. 9226311) in the safety and arming housing assembly shall be capable of accepting mating screws for a minhum depth of -36 inches. 3.8 Fragment Weight.-A quantity of 15,
14、000 fragments (dwg. 9226307) shall weigh 64.3 pounds minus 1 pound, plus 2 pounds,. 3.9 Component and Assembly Lot Information.-Data cards pre- pared for each lot shall include specific component and assembly lot information defined in 6.1.b. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for In
15、spection.-Unless otherwise specified in the contract or purchase order, the supplier is responsible for the Derformance of all insriection reauirementn as specified herein. or order, the supplier may use his own or any other facilities Except as otherwise specified in the contract . suitable for the
16、 performance of the inspectin requirements specified herein, unless disapproved by the Government. The Government reseSrves the right to perform any of the inspections set forth i-n the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed re
17、quirements. a Licensed by Information Handling Services4.1.1 Submission of Product.-At the time each completed lot of items deliverable under the contract is submitted to the Government for acceptance, the contractor shall supply the following information accompanied by a certificate which attests t
18、hat the information provided is correct and applicable to the product being submitted: a. A stakement that the lot complies with all of the quality assurance provisions specified in this specification. b. Drawing and specification number and date, together with identification and date of changes the
19、reto, C. A statement that all material purchased by the contractor meets the requirements, when such material is controlled by Government or comercial specifications referenced in any of the contractual documents, and that certificates of conformanse are on file and available for review. The certifi
20、cate shall be signed by a responkibfe agent of the certifying organization, The initial certificate submitted shall be substantiated by evidence of the agents authority to bind his principal. Substantiation of the agents authority will not be required by subsequent certificates unless, during the co
21、urse of the contract, this authority is vested in another agent of the certifying organization . d. Number of items in the lot. e. Date submitted. 4.2 First Article Inspection 4.2.1 Submission.-The contractor shall submit a first article sample as designated by the contracting officer for evaluation
22、 in accordance with the provisions of 4.2.2. The first article sample shall consist of two assemblies, one dual packing crate, and four complete sets of parts (i.e., four each of every component anil every subassembly, except fragments, 20 of which shall be subnitted) which have been produced by the
23、 contractor or furnished by a sup- plier and which have been manufactured using the same production processes, procedures and equipment which will be used in fulfilling the contract. All parts and materials, including packaging arid packing, shall be obtained from the same source of supply as will b
24、e used in regular production. Prior to submission, the contractor shall inspect the sample to the degree necessary to assure th5.t it conforms to the requirements of the contract and submit a reccrd of this inspection with the sample, including statements of findings/ certificates of conformance for
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILW14960B1971WARHEADGUIDEDMISSILEHEM155ANDWARHEADGUIDEDMISSILETRAININGM237PARTSFORM155 烈性 炸药 导弹

链接地址:http://www.mydoc123.com/p-449044.html