《ARMY MIL-W-14742 A-1972 WARHEAD SECTION GUIDED MISSILE PRACTICE M220 ASSEMBLING AND PACKING《M220型导弹弹头部分实施的组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-W-14742 A-1972 WARHEAD SECTION GUIDED MISSILE PRACTICE M220 ASSEMBLING AND PACKING《M220型导弹弹头部分实施的组装和包装》.pdf(11页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-W- 14 7 4 2A 17 2aIiLiary 1972 MIL-W-14742 (MU) (MU ) Supers e ding 3 June 1968 MILITARY SPECIFICATION WARHEAD SECTION, GUIDED MISSILE, PRACTICE, M220, ASSEMBLY AND PACKAGING 1. SCOPE 1.1 This specification contains requirements not norm covered by the drawings and provides quality assurance for
2、 the fabrication of parts, assembly and packaging of one type of warhead designated as Warhead Section, Guided Missile, Prac- tice, M220. 2. APPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect on date of invitation for bids or request for proposals form a part of this specificati
3、on to the extent specified herein: SPECIFICATIONS FEDERAL UU-T-106 - Tape, Pressure-Sensitive, Adhesive Masking, Paper UU-T-450 - Tissue, Facial MILITARY MIL-C-45662 - Calibration System Requirements STANDARDS MILITARY MIL-STD-105 - Sampling Procedures and Tables for MIL-STD-1168 - Lot Numbering of
4、Ammunition Inspection by Attributes FSC: 1336 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-STD-1169 - Packaging, Packing and Marking for Shipment of Inert Ammunition Components MIL-STD-1235 - Single and Multilevel Continuous Sampling Procedure
5、s and Tables for Inspection by Attributes DRAWINGS PICATINNY ARSENAL 9260040 - Warhead Section, GM, Practice, M220 (Copies of specifications, standards, drawings and publications required by suppliers in connection with specific procurement functions should be obtained from the procuring activity or
6、 as directed by the Contracting Officer.) 3, REQUIREMENTS 3.1 Material.-Materials shall be in accordance with appli- cable drawings and specifications. 3 . 2 Components and Assemblies. -The components and assemblies shall comply with all requirements specified on drawing (dwg.) 51260040 and with all
7、 requirements specified in applicable specifi- cations. 3.3 Warhead to Missile Assembly Capability.-The warhead shall exhibit capabilities of assembly to the missile when tested as spec- ified in 4.4.1. 3.4 Adhesion and Mar Resistance of Paint,-The paint on the warhead shall not exhibit flaking, pee
8、ling, loss of adhesion, marring or discoloration when tested as specified in 4.4.3. 3.5 Workmanship.-All parts and assemblies shall be fabri- cated in a thorough, workmanlike manner. They shall be free of burrs, sharp edges, cracks, dirt, rust and other foreign matter, The cleaning method used shall
9、.not be injurious to any part nor shall the parts be contaminated by the cleaning agent. Surface coatings shall be continuous. Light scratches not exposing base material shall be ignored, All required markings shall be neat and sharply defined. 2 c . u , = Provided by IHSNot for ResaleNo reproductio
10、n or networking permitted without license from IHS-,-,-MIL-W-14742A 13 W 9999906 0296457 5 3.6 First Article Inspection.-This specification makes provisions for first article inspection. Requirements for the submission of first article samples by the contractor shall be as specified in the contract.
11、 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for Inspection.-Unless otherwise speci- fied in the contract or purchase order, the supplier is respon- sible for the performance of all inspection requirements as spe- cified herein. Except as otherwise specified in the contract or order, the supp
12、lier may use his own or any other facilities suit- able for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed nece
13、ssary to assure supplies and service conform to prescribed requirements. Submission of Product.-At the time the completed lot of product is submitted to the Government for acceptance, the contractor shall supply the following information accompanied by a certificate which attests that the informatio
14、n provided is cor- rect and applicable to the product being submitted: 4.1.1 a. A statement that the lot complies with all of the quality assurance provisions specified in this specification. b. Drawing and specification number and date, together with identification and date of changes thereto. c. A
15、 statement that all material purchased by the con- tractor meets requirements, when such material is controlled by Government or commercial specifications referenced in any of the contractual documents, and that certificates of conformance are on file and available for review. The certificate shall
16、be signed by a responsible agent of the cer- tifying organization. The initial certificate submitted shall be substantiated by evidence of the agents authority to bind his principal. Substantiation of the agents authority will not be required with subsequent certificates unless, durhg the course of
17、the contract, this authority is vested in another agent of the certifying organization. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-W-147q2A 13 7779706 0276L158 7 4; 2. Firse Article Inspection 4.2.1 S&mission.-The contractor shall submit a
18、 first arti- cSe sample to a Government approved facility as designated by the dontracting officer (see 6.4) for evaluation in accordance with the provisions of 4.2.2. The first article sample shall consist of three (3) warhead sections and three (3) complete sets of parts which have been produced b
19、y the contractor or furnished by a sup- plier and which have been manufactured using the same production processes, procedures and equipment which will be used in fulfil- ling the contract. All parts and materials, including packaging and packing, shall be obtained from the same sources of supply as
20、 will be used in regular production. Prior to submission, the contractor shall inspect the sample to the degree necessary to assure that it conforms to the requirements of the contract and shall submit a record of this inspection with the sample, in- cluding statements of findings of tests and exami
21、nations and Cer- tificates of conformance for materials (see 4.1.1.c.). A sample containing known defects will not be submitted unless specifically authorized by the contracting officer. A first article sample, or portion thereof as directed by the contracting officer, shall also be submitted whenev
22、er there is a lapse in production for a period in excess of 90 days, or whenever a change occurs in manufacturing nrocess, material used, drawing, specification or source of supply such as to significantly affect product uniformity as determined by the Government. Inspections to be Performed.-Assemb
23、lies and components will be subjected by the Government to any or all of the examina- tions and tests specified in 4.3.2 and 4.3.3 of this specification and to any or all requirements of the applicable drawings. Ply with any of the applicable requirements, the first article sample shall be rejected.
24、 The Government reserves the right to terminate its inspection upon any failure of an assembly or compo- nent in the sample to comply with any of the stated requirements. In the event of rejection, the Government reserves the right to require the contractor to take corrective action and submit a new
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILW14742A1972WARHEADSECTIONGUIDEDMISSILEPRACTICEM220ASSEMBLINGANDPACKINGM220 导弹 弹头 部分 实施 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-449041.html