ARMY MIL-T-60207 (2)-1968 TRANSFORMER POWER STEP DOWN 10525910《10525910降压变压器》.pdf
《ARMY MIL-T-60207 (2)-1968 TRANSFORMER POWER STEP DOWN 10525910《10525910降压变压器》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-T-60207 (2)-1968 TRANSFORMER POWER STEP DOWN 10525910《10525910降压变压器》.pdf(2页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-T-60207 (2) 57 W 7777906 007676b 3 MIL-T-60207(MlJ) AMENDMENT 2 12 July 1968 SUPERSEDING AMENDMENT 1 1 February 1968 MILITARY SPECIFICATION TRANSFORMER, POWER, CTEP-DOWN: 10525910 This amendment forms a part of Military Specification MIL-T-60207(M), dated 26 February 1965. Paragraph 1.1: Paragra
2、ph 3.1: Delete “TF5RXO122“ and substitute 11TF5RX02ZZ1. Delete “TF5RXO122“ and substitute 11TF5RX02ZZ1t. Paragraph 3.3.4.1: Delete 111350F,11 and substitute “135“F, except that it shall meet the requirements ot 3.4.3 after being thoroughly dried,“ * Paragraph 3.4.1: Delete the l.ast sentence and sub
3、stitute: “DC resistance at room temperature shall be between the limits of 5.75 ohms max and 4.25 min. max at -40F the dc resistance shall be 3.16 ohms min.“ DC resistance at +135“F shalLbe 6.47 ohms * Paragraph 3.4.2: Delete columns 7 and 8 in their entirety and sub- stitute the following: “DC Resi
4、stance (ohms) +135 OF - Terminal Room Temp Max Min Max 4-5-6 0.32 om OX 7-8-9 0.14 0.10 10-11-12 . 0.26 0.18 13-14-15 0.45 0.31 O. 157 0.29 O. 506 -40F - Min 0.164 O. 074 0.134 0.231 Column 2, line 4: Add f0.3 after 20.6, Column 5, line 4: Change “20.8“ to “21.1“. Following paragraph 4.1.1, add para
5、graphs 4.1.2, 4.1.2.1 and 4.1,2,2. “4.1:2 First article (initial production) approval.- The requirement * for first article approval and the responsibility (Government or contractor) for first article testing shall be as specified in the contract. The sample for first article approval tests shall co
6、nsist of three (3) units manufactured procedures as used in regular production. packaging and packing, shall be obtained from the same source of supply as used in regular prbduction. in the same manner using the same materials, equipment, processes, and All parts and materials, including 4.1.2.1 Gov
7、ernment testing.- When the Government is responsible for conducting first article approval tests, the contractor, prior to submitting the sample to the Government,.shall inspect the sample to insure FCC 5950 /- THIS DOCUMENT CONTAINS 2- PAGES : . E -. . Provided by IHSNot for ResaleNo reproduction o
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILT6020721968TRANSFORMERPOWERSTEPDOWN1052591010525910 降压 变压器 PDF

链接地址:http://www.mydoc123.com/p-448808.html