ARMY MIL-PRF-32023-1998 ADAPTER KIT - GRAVITY FEED FOR 5-GALLON MILITARY PLASTIC FUEL CAN《适配器- 5加仑军用塑料燃料罐自两供给MILITARY》.pdf
《ARMY MIL-PRF-32023-1998 ADAPTER KIT - GRAVITY FEED FOR 5-GALLON MILITARY PLASTIC FUEL CAN《适配器- 5加仑军用塑料燃料罐自两供给MILITARY》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-PRF-32023-1998 ADAPTER KIT - GRAVITY FEED FOR 5-GALLON MILITARY PLASTIC FUEL CAN《适配器- 5加仑军用塑料燃料罐自两供给MILITARY》.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-PRF-32023 m 9Ob 2065489 303 m i I I MIL-PRF-32023 - PERFORMANCE SPECIFICATION ADAPTER KIT - GRAVITY FEED, FOR 5-GALLON MILITARY PLASTIC FUEL CAN 1. SCOPE 1.1 Scope. This document covers the performance and acceptance requirements for a Gravity Feed Adapter (GFA) which mates with the standard mil
2、itary 5- gallon plastic fuel can. The GFA and can assembly are inverted to provide a gravity fed fuel supply for military tent heaters (see 6.1). 2. APPLICABLE DOCUMENTS Not applicable to this specification. 3. REQUIREMENTS 3.1 First articl e test. When specified, see 6.2, the GFA shall undergo a fi
3、rst article test in accordance with 4.1.1. 3.2 Conformance. Items furnished under this specification shall be subject to the conformance inspection in accordance with 4.1.2. 3.3 operat in? reauiremene. 3.3.1 Fuel flow rate. The GFA shall allow a minimum fuel flow rate from an inverted five gallon fu
4、el can of 200 cubic centimeters (cc)/minute of Jp8 fuel in all operating temperatures. No more than 325 ccs of fuel shall remain in the can after draining. 3.3.2 Sealing. There shall be no leakage of fuel from the GFA, when connected to a full five gallon ndhy plastic fuel can, upon inversion for op
5、eration, during operation, or if accidentally tipped over during transport. The maximum torque required for a positive seal shall not exceed 120 irlbs in al operating temperatures. Beneficial comments, recommendations, additions, deletions, and any pertinent data which may be used in improving this
6、document should be addressed to : U.S. Army Natick Research Development and Engineering Center, ATTN: SSCNC-WEC, Natick, MA 01760-5018 AMSC NIA FSC 7240 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF-32023 999990b 2065490 025 MIL-PEW-32023 3
7、.3.3 Attachment. The GFA shall be quickly and easily attached and removed from the can by hand while wearing cold weather gloves. No tools shall be required for attachment or removal. The GFA shall mate with the male threads on the military five gallon plastic fuel can without damaging fuel can or G
8、FA threads. Attachment for operation shall require no more than the following three steps: 1. Attach adapter to fuel can, 2. Attach fuel line to adapter, 3. Invert fuel can on fuel can stand. 3.4 suport or ownershir, reauirements. 3.4.1 Storage. The GFA body size shall not exceed 5.5 inches in diame
9、ter and 3.0 inches in height for storage inside a space heater. 3.4.2 Marking. Lettering shall be permanent and shall not wear off due to contact with fuel or normal wear associated with use of the GFA. The information on the GFA shall contain the following at a minimum: a. Manufacturers name and ad
10、dress or cage code. b. Manufacturers part number or NSN. 3.5 Environmental requirements. 3.5.1 Water tightness. The GFA shall prevent water penetration into the fuel can during operation, transport, or storage under all environmental conditions. 3.5.2 Extreme temm - ratures. The GFA and materials sh
11、all remain operable in temperatures from 65“ F down to -60“ F. 3.5.3 Fuel compatibility. All GFA materials (body, hose, coupler, O-rings, gaskets, etc) shall be compatible with liquid fuels (JP8, Kerosene, Diesel). 3.5.4 Corrosion resistance. The GFA, fittings, and materials shall not rust. 3.6 Inte
12、rface and interomrab iiiy requirements. 3.6.1 Fuel supply hose and connector. The GFA shall be equipped with a 6-inch long, 318- inch inside diameter flexible hose with a automatic shut-off female coupler. The coupler shall mate with male fitting Parker Hannifin Corp. Part no. BH8CP or equivalent wh
13、ich shall be supplied with the adapter when specified (see 6.2). 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-4. VERIFICATION MIL-PW-32023 4.1 Classificati on of inspxtions . The inspection requkments herein are classified as follows: a. First a
14、rticle inspection (see 4.1.1) b. Conformance inspection (see 4.1.2) 4.1.1 mt article insperition. When a first article inspection is required (see 3.1 and 6.2), the GFA shall undergo the tests and examinations outlined in Table I. Sampling for the first article inspection shall be as specified in th
15、e contract or purchase order. 4.1.2 Conformance inspection. Conformance inspections shall include tests 4.3.3,4.4.2, 4.5.2,4.5.3, and 4.6.1. Sampling for conformance inspections shall be as specified in the contract or purchase order. 4.2 Verification. Verification methods can include visual examina
16、tion, measurement, testing, simulation, modeling, engineering evaluation, component properties analysis, certification and similarity to previously approved or previously qualified designs. 4.2.1 Verification alternatives. The contractor may propose alternative test methods, techniques, or equipment
17、, including the application of statistical process control, tool control, or cost effective sampling procedures to verify performance (see 6.4). 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF-32023 4.3 Operating requirements. ! Fuel I GFA
18、Attatchmcnt i C*rn.3 4- scale Figure 1. Flow test set up 4.3.1 Flow rate test. Cold soak a GFA and full five gallon can (NSN 7240-01-337-5269) with JP-8 fuel (NSN 9130-01-031-5816) in an ambient temperature of -40F (+/- 2F) for a period no less than 4 hours. While maintaining a temperature of -40F (
19、+/- 2“F), put the GFA on the can and invert on a stand. Connect a 3/8 inch LD. fuel line to the GFA which shall empty into a collection bin. The outlet of the fuel line and height of the can shall be as shown in figure 1. The collection bin shall be placed on a digital scale (minimm resolution 0.05
20、kg) which shall be kept in surrounding temperatures within manufacturers recommendation for scale operation. Record the increase in the collection bin weight every 2 minutes until flow has stopped and record final weight of the fuel can. Compare the final weight of can to the weight of an empty can
21、and verify no more than 325 cc of fuel remain in the can. Verify the average flow rate from the can does not drop below 200 cc/min. 4.3.2 Sealing inspection. During test of 4.3.1, measure the torque required to provide a positive seal between the fuel can and GFA. At the end of the test measure the
22、torque required to remove the GFA. Torque shall be measured from the center of the GFA using an appropriate fixture and a calibrated torque wrench which measures in inch pounds. The torque wrench shall be kept at room temperature until immediately before measurements are taken. At no time shall the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILPRF320231998ADAPTERKITGRAVITYFEEDFOR5GALLONMILITARYPLASTICFUELCAN 适配器 加仑 军用 塑料 燃料 供给 MILITARYPDF

链接地址:http://www.mydoc123.com/p-447094.html