《ARMY MIL-P-70506 A-1988 PROJECTILE 155MM XM864 BASE BURNER ASSEMBLY LOADING ASSEMBLING AND PACKING《XM864式155 mm射弹用底排组件及其装药 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-70506 A-1988 PROJECTILE 155MM XM864 BASE BURNER ASSEMBLY LOADING ASSEMBLING AND PACKING《XM864式155 mm射弹用底排组件及其装药 组装和包装》.pdf(25页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-P-7050bA 13 = 77777Ob 0355Li54 T SM3 745 MIL-P-70 50 6A (AR) 4 April 1988 SUPERCEDING MIL-P-70506 (AR) 28 DFT3ER 1984 MILlTARY SPECIFlCATION PROJECTILE, 155MM: XM864 BASE BURNER ASSEMBLY LOADING, ASSEMBLING AND PACKING This specification is approved for use within the U.S. Army Armament Munition
2、s and Chemical Command, and is available for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification covers the loading, assembling and packing for one type of projectile base burner assembly designated as Projectile, 155MM: XM864. 2. APPLICABLE DOCUM
3、ENTS 2.1 Government documents. 2.1.1 Specifications and standards. The following specifications and standards form a part of this specification to the extent specified herein. Unless otherwise specified (see 6.Z!), the issues of these documents shall be those listed in the issue of the Department of
4、 Defense Index of Specifications and Standards (DODISS) and supplement thereto, cited in the solici tat ion. SPECLFICATIONS MILITARY MIL-A-48078 - Ammunition, Standard Quality Assurance Provisions, General Specification For Beneficial comments (recommendations, additions, deletions) and any pertinen
5、t data which may be of use in improving this document should be addressed to: Commander, U.S. Army Armament,Munitions an Chemical Command, Atm. AMSMC-QA. Picatinny Arsenal, New Jersey 07806-5000 by using the self-addressed Standardiza- tion Document Improvement Proposal (DD Form 1426) appearing at t
6、he end of this document or by letter. A3lSC N/A - FCC 1320 DISTRIBTION STATEMENT A. Approved for public release; distribution is unlimited. Licensed by Information Handling ServicesMIL-P-7050bA 13 M 777770b 0355455 1 m STANDARDS MIL I TARY MIL-STD-105 MIL-STD-286 MIL-CTD- 410 MIL-STD-453 MIL-STD-123
7、4 MIL-STD-3235 MIL-P- 70 5 O 6A (AR) - Sampling Procedures and Tables for Inspection by Attributes - Propellants, Solid; Sampling; Examination and Testing - Nondestructive Testing Personnel * Qualification and Certification - Inspection, Radiographic - Pyrotechnics: Sampling, Inspection, and - Singl
8、e and Multi-Level Continuous Testing Sampling Procedures and Tables for Inspection by Attributes i 2.1.2 -.-.-.-.-_I_- Other Government documents I- drawings, and publications. -.-.-I.- The following other.Government documents, drawings, and publications form a part of this specification to the exte
9、nt specified herein. Unless otherwise specified, the issues shall be those in effect on the date of the solicitation. 4B DRAWINGS US ARMY ARMAMENT, RESEARCH, DEVELOPMENT AND ENGINEERING CENTER (ARDEC) PRODUCT AND PACKING DRAWINGS 9381130 - Base Burner Assembly (Copies of specifications, standards, h
10、andbooks, drawings, and publications required by contractors in connection with specific acquis ition functions should be obtained from the contracting activity or as directed by the contracting activity.) 2 Licensed by Information Handling Services- 1 MIL-P-7050bA 13 I 7777706 0355456 3 a a MIL-P-
11、70 50 6A (AR) 2.2 Order of precedence. In the event of a conflict between the text of- this specification and the references cited herein, (except for associated detail specifications, specification sheets or MS standards), the text of this specification shall take precedence. Nothing in this specif
12、ication, however, shall supersede applicabl-e laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS. - 3.1 General. Materials, parts and assemblies shall comply with the requirements specified on the applicable drawings and referenced specifications. 3.2 Proving ground
13、tests. The base burner assembly shall comply with the following requirements when tested in accordance with 2.4.3.1. 3.2.1 - Functioninq. When assembled to projectiles the base burner assembly shall ignite, burn and enable the srojectile to achieve its target range. 3.2.1.1 -I_- Horizontal. range. N
14、o projectile shall have a horizontal range less than 97.5 percent of the mean horizontal - range. Additionally, the range probable error (RPE) of the . ballistic samples shall not exceed .441 percent when fired as specified in 4.5.8. 3.2.2 -. Security. There shall be no premature burst or indication
15、 of metal parts separation in the gun bore or in flight. 3.3. Igniter - requirements. 3.3.1 Loose igniter composition. After consolidation there shall be no visual evidence of loose or flaking igniter composition. Any excess material (flash) shall be removed. 3.3.2 Heat of explosion. When tested in
16、accordance with 4.5.2 the caloric output of the igniter material shall be 1150 - + 50.calories per grain. 3.3.3 Burn time test. When tested in accordance with 4.5.3 the igniter shall burn completely and provide a flame for at least 2.0 seconds. 3.3.4 Radiographic examination of igniters. -I When rad
17、iographed in accordance with 4.5.9 defects shall not exceed the following limits: 3 Licensed by Information Handling ServicesMIL-P-7050bA 13 m 9999906 0355Y57 5 m MIL-P-70 50 6A (AR) a. The combined length of all cracks or laminations shall not exceed 0.20 inches. The width of any crack shall not ex
18、ceed 0.02 inches. b. The combined maximum length of all voids shall not exceed 0.10 inches. No single void shall have a dimension exceeding 0.05 inches. c. The combined maximum length of all foreign matter shall not exceed 0.20 inches. No single particle of foreign material shall have a maximum dime
19、nsion exceeding 0.10 inches, d. There shall be no evidence of a gap between the bottom of the cup and the igniter material in excess of 0.01 inch. 3.4 First article inspection. This specification contains technical provisions for first article inspection. Requirements for the submission of first art
20、icle samples by the contractor shall be as specified in the contract. 3.5 Records of results of contractor conducted examinations and tests. The contractor shall maintain records of the results of all examinations or tests required by this specification. (See 6.5). 3.6 Tool control dimensions. Dimen
21、sions marked tool control shall be gaged during First Article Testing and after eight hours maximum production on each machine in operation and prior to any tooling change. Where destruction of components is necessary to inspect these dimensions, measurements of the tool may be substi- tuted provide
22、d the contractor has established correlation between the tool dimensions and the component dimensions prior to the start of production. The contractor shall be responsible for maintaining adequate surveillance to assure that drawing requirements are being met throughout the life of the tool. Correct
23、ive action will immediately be instituted by the contractor. In the case of, pressed igniters a correlation between punch dimensions and dimensions of the igniter surface need not be established. Inspection of the punch alone is adequate. 3.7 Radioqraphic examination of base burner assemblies. Sampl
24、ed assemblies shall be radiographed and examined for the following : a. Missing components. b. Misassembled components. c. Igniters facing the wrong way. d. Foreign matter present. 3.8 Workmanship. All parts and assemblies shall be fabricated, loaded and assemblied in a thorough, workmanlike 4 Licen
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP70506A1988PROJECTILE155MMXM864BASEBURNERASSEMBLYLOADINGASSEMBLINGANDPACKINGXM864 155 MM 射弹用底排

链接地址:http://www.mydoc123.com/p-446895.html