ARMY MIL-P-70506 A (2)-1993 PROJECTILE 155MM XM864 BASE BURNER ASSEMBLY LOADING ASSEMBLING AND PACKING《XM864式155 mm射弹用底排组件及其装药 组装和包装》.pdf
《ARMY MIL-P-70506 A (2)-1993 PROJECTILE 155MM XM864 BASE BURNER ASSEMBLY LOADING ASSEMBLING AND PACKING《XM864式155 mm射弹用底排组件及其装药 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-70506 A (2)-1993 PROJECTILE 155MM XM864 BASE BURNER ASSEMBLY LOADING ASSEMBLING AND PACKING《XM864式155 mm射弹用底排组件及其装药 组装和包装》.pdf(16页珍藏版)》请在麦多课文档分享上搜索。
1、r4 c J INCH-POUND MIL-P-70506A (AR) AMENDMENT 2 O2 Auqust 1993 SUPERSEDING AMENDMENT 1 3 April 1989 MILITARY SPECIFICATION PROJECTILE, 155mm: XM864 BASE BURNER ASSEMBLY LOADING, ASSEMBLING AND PACKING This Amendment forms a part of Military Specification MIL-P- 70506A (AR) dated 4 April 1988, and is
2、 approved for use within the U.S. Army Armament, Munitions and Chemical Command and is available for use by all Departments and Agencies of the Department of Defense. PAGE 1 Change XM864 to “M864“ wherever it appears in the specification. PAGE 3 Add the following new paragraphs as follows: “2.2 Non-
3、Government publications. The following document(s) form a part of this document to the extent specified herein. Unless otherwise specified, the issues of the documents which are DoD adopted are those listed in the issue of the DODISS cited in the solicitation. Unless other- wise specified, the issue
4、s of the documents not listed in the DODISS are the issues of the documents cited in the solicita- tion (see 6.2). AMERICAN NATIONAL STANDARDS INSTITUTE ANSI Zl.1 - Guide for Quality Control Charts ANSI 21.2 - Control Chart Method of Analyzing Data ANSI 21.3 - Control Chart Method of Controlling Qua
5、lity During Production (Applications for copies should be addressed to American National Standards Institute, 1430 Broadway, N.Y., N.Y. 10018) AMSMC N/A 1 of 16 FSC 1320 DISTRIBUTION STATEMENT A. Approved for public release; distirbution is unlimited. Licensed by Information Handling ServicesMIL-P-7
6、050bA (2) = 9999906 L95LL47 968 . MIL-P-70506A (AR) AMENDMENT 2 2.3 Order of precedence. In the event of a conflict between the text of this document and the references cited herein (except for related associated detail specifications, specification sheets, or MS standards), the text of this docu- m
7、ent takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained.“ * 3.2.1.1, line 4, Delete: “.441“ and substitute: “.514“. 3.3.1 Change the paragraph to read as follows: “3.3.1 Loose imiter composition. After consolid
8、ation there shall be no visual evidence of loose igniter composi- tion. I * 3.3.2 Delete “1450+/-50“ and substitute “1150+/-50“. PAGE 5 * 3.8 Add new sentence to beginning of paragraph: “The requirements for the workmanship are as specified on the applicable drawings and referenced specifications.“
9、Delete the second sentence and substitute the following: “They shall be free of burrs, sharp edges, cracks, gouges, cuts, dirt, grease, rust, and other foreign matter, unless defined elsewhere in this specification.“ 3.8.1 Change title to read: “3.8.1 Tracer CUDS. 3.8.2 Change the paragraph to read:
10、 “3.8.2 Imiter CUD, loadina assembly. The stepped area of the finished igniter cup need not be perfect form. Damaged areas up to 25 percent of the total surface area are allowed. Damage in excess of 25 percent is cause for rejection.“ Add the following new paragraphs: “3.9 Weather seal assembly. The
11、 weather seal assembly shall not allow moisture to leak into the base burner as- sembly. 2 Licensed by Information Handling ServicesMIL-P-7050bA (2) 9999906 L95LL48 T4 w MIL-P-70506A (AR) AMENDMENT 2 3.9.1 Weather seal resistance to air pressure. The weather seal assembly shall withstand an air pres
12、sure test of 15 psi for 15 seconds. O 3.9.2 Weather seal shelf life in storaqe. The shelf life for production weather seals in storage shall be a minimum of one year from the date of their production. 3.9.3 Weather seal deqradation. Prior to their use, if it is detected by the base burner manufactur
13、er that a shipment of weather seal assemblies or parts thereof has been contaminated due to exposure to a foreign substance or by the degradation of the packaging assembly, those weather seal assemblies will be rejected and will not be permitted for use. NOTE: A foreign substance is considered to be
14、 any unknown substance; ie. liquid, powder, gel, residue, etc. that does not conform to the provisions of the weather seal assembly drawing, or visually compare in quality , or physical condi- tion to prior shipments. PAGE 7 4.3.1.1 Examination or test, delete: I Iqniter (Dwg. 12630572)“ and substit
15、ute: “Ianiter CUP, Loadinq Assembly (Dwg. 12630572)“ PAGE 9 4.4.1 Add the following requirement: If. Weather seal assemblies from one lot from one manufac- turer. Add the following new paragraph: “4.4.1.1 Weather seal assembly raw materials. The raw materials sued in the construction of the M864 w4e
16、ather seal assembly will be subject to the following requirements: a. Aluminum from one lot from one b. Polyvinyl fluoride (disc seal) manufacturer. c. Adhesive from one lot from one 3 manufacturer. from one lot from one manufacturer. Licensed by Information Handling ServicesMIL-P-7050bA (2) U 99994
17、0b 1951349 730 U _- MIL-P-70506A (AR) AMENDMENT 2 PAGE 9 * 4.4.1 Add “g. Igniter housing plugs from one lot interfix number from one manufacturer.“ PAGE 10 4.4.2 Add the following new paragraph: “4.4.2.c Statistical process control (SPC). For those dimensions identified in the Classification of Defe
18、cts Tables by the reference “(see Appendix A)“, the contractor must util- ize the principles of SPC as defined herein, ANSI 21.1, ANSI 21.2, ANSI 21.3, and in Appendix A. When the contractor satisfies the control conditions identified in appendix A, ac- ceptance will then be by SPC. The SPC sample s
19、ize and frequency of selection shall be determined by the contractor. If the SPC sample is to be less than 4 items per hour, then the approval of the procuring agency must be sought prior to the elimination of sampling inspection for acceptance. The contractor may request to implement SPC acceptance
20、 for any other feature that is not annotated in the classification for defects by requesting approval of the procurement agency and by meeting all the conditions specified in this specification. When not accepting product by SPC, acceptance of product for those features identified with references to
21、 appendix A will only be in accordance with MIL-STD-414 or MIL-STD-1235 plans CSP-1, -2, -T using variable measurement capable gages.“ PAGE 11 4.4.2.2 Change critical defect to read: “Critic a 1 Evidence of loose igniter composition 100% 3.3.1 Visual/ Note 2“ Add “(see Appendix A)“ after major defec
22、ts 105, 106 and 107. Change note 1 to read: “1. Damaged or missing cadmium plating is permissible on tracer cup provided that the base metal is not gouged or cracked. Flakes of cadmium plating on surface of igniter material is permissible.“ Add to the bottom of paragraph 4.4.2.2 under Notes: * “2. A
23、s a referee test for possible loose igniter composition, refer to paragraph 6.8.“ 4 Licensed by Information Handling ServicesMIL-P-7050bA (2) m 999990b L95LL50 q52 MIL-P-70506A (AR) AMENDMENT 2 PAGE 12 4.4.2.3 Make the following changes: Delete Major 101 in its entirety. Delete Major 102 and substit
24、ute the following: “Major 101 Plug missing 100% 3.1 Visual“ Add : “Special a Igniter cup missing or incorrectly oriented (Note 1) 100% 3.1 Visual“ PAGE 13 4.4.2.4 Delete Major 102 in its entirety. Add the following: “Special a Igniter cup missing or incorrectly oriented (Note 1) 100% 3.1 Visual“ PAG
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP70506A21993PROJECTILE155MMXM864BASEBURNERASSEMBLYLOADINGASSEMBLINGANDPACKINGXM864 155 MM 射弹用底排

链接地址:http://www.mydoc123.com/p-446893.html