ARMY MIL-P-63404-1980 PROPELLANT M6 FOR USE IN CHARGE PROPELLING 155MM M119A2《M119A2式155 mm发射装药系统用M6发射药》.pdf
《ARMY MIL-P-63404-1980 PROPELLANT M6 FOR USE IN CHARGE PROPELLING 155MM M119A2《M119A2式155 mm发射装药系统用M6发射药》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-63404-1980 PROPELLANT M6 FOR USE IN CHARGE PROPELLING 155MM M119A2《M119A2式155 mm发射装药系统用M6发射药》.pdf(11页珍藏版)》请在麦多课文档分享上搜索。
1、I -I MIL-P-63404 li3 = 777770b 0347776 W -_ MIL- P163404(AR ) 11 September 1980 MILITARY SPECIFICATION PROPELLANT M6 FOR USE IN CHARGE, PROPELLING, 155MM, M119A2 4 , This Specification is approved for use by the US Army Armament Research and Development Command, and is available for use by all Depar
2、tments and Agencies of the Department of Defense. .i 1. SCOPE 1. 1 This specification covers M6 Propellant for use in Propelling Charge M119A2 for M199 cannon on HOW, medium, towed: 155MM,-M198 and M185 cannon on SP.How, 155MM: Ml09Al/A2/A3. 2 .- - APPLICABLE DOCUMENTS 2.1 Issues of documents. The f
3、ollowing documents of the issue in effect on date of invitation for bids, or request for proposal, form a part of this specification to the extent specified herein. SPECIFICATIONS MI LI TARY MIL-A-48078 - Ammunition, Standard Quality Assurance Provisions, General Specification for MIL-C-63405 - Char
4、ge, Propelling, 155MM, M119A2, Loading, Assembling and Packing STAJDARDS MIL I TARY MIL-STD-652 - Propellants, Solid, for Cannon, Requirements and Packing *U.S. GOVERNMENT PRINTING OFFICE: 1980-703-02314306 FSC: 1376 Licensed by Information Handling ServicesMIL-P-63404 13-W 9999906 0349797 - T W MIL
5、-P-63404 (AR) DRAWINGS US ARMY ARMAMENTS RESEARCH AND DEVELOPMENT COAMAND 9333954 - Charge, Propelling, 155MM: M119A2 (Copies of specifications, standards, drawings and publications required by contractors in connection with specific procurement functions should be obtained from the procuring activi
6、ty or as directed by the contracting officer). 3 . REQUIREMENTS 3.1 Materials. The propellant shall be M6, conforming to the requirements of MIL-STD-652 and Dwg 9333954. 3.2 Ballistic Assessment Requirements - The propellant, when fired in the M185 cannon with the M107 projectile shall comply with t
7、he following requirements at 70F and standard weapons conditions (see 4.5.1). The propellant shall be capable of assessment to a velocity of 2,251 feet per second (fps) without an associated average pressure less than 26.000 pounds per square inch (psi) or greater than 33,000 psi. 3.3 Ballistic Unif
8、ormity Requirements - The propellant, when fired in the M185 cannon with the projectile (M107), shall comply with the following requirements when tested as specified in 4.5.1.2. All charges (reference, master calibration and test) shall be manufactured in accordance with MIL-C-63405. 3.3.1 velocity
9、for the lot at 70F shall not exceed 6.8 fps. Uniformity of Velocity - The standard deviation of 3.3.2 Individual Maximum Pressure - The propellant shall not produce an individual pressure greater than 41,000 psi at 1450F. 3.3.3 Average Pressure - At 7OoF and standard weapon conditions, the propellan
10、t shall not produce an average pressure greater than 33,000 psi, nor less than 26,000 psi. provisions for initial production inspection. Requirements for the submission of initial production-inspection samples by the contractor shall be as specified in 4.5.1.2.1. 3.4 Initial production. This specifi
11、cation contains 2 Licensed by Information Handling ServicesMIL-P-63404 13 m 7977706 034777 L W - 3.5 Preproduction inspection. This specification contains provisions for preproduction inspection. Requirements for the submission of preproduction inspection samples by the contractor shall be as specif
12、ied in 4.3.1. 3.6 Workmanship. The best commercial practices shall be used in the formulation of propellant furnished under this specification, and all other applicable documents. The propellant and its standard ingredients shall be protected from the action of direct sunlight and acid fumes. Unless
13、 otherwise specified, no reground propellant or nitrocellulose shall be used in the manufacture of propellant procured under this specification. 4 QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection and standard quality assurance provisions. Unless otherwise specified herein or in the con
14、tract, the provisions of MIL-A-48078 shall apply and are - hereby made a part of this detail specification. 4.2 Classification of inspection. The following types of inspection shall be conducted on the unit product: a. Preproduction Sample Inspection b. Quality Conformance Inspection 4.3 Preproducti
15、on sample (pilot lots). The preproduction sample is intended to provide the necessary information to establish the propellant granulation needed to meet the required ballistic parameters. 4.3.1 Submission. The Contractor shall select three (3) propellant granulations which, from experience, should b
16、est fit the requirements of this specification. The contractor shall submit a preproduction sample as designated by the Contracting Officer for evaluation in accordance with 4.3.2, consisting of three (3) pilot lots approximately 1200 lbs each representing the three (3) candidate granulations. 4.3.2
17、 Inspections to be-performed. Each of the pilot lots comprising the preproduction sample and submitted in accordance with 4.3.1 may be,subjected by the Government to any or all of the requirements of this specification. MI L-P-6 3 4 O 4 (AR) - 7OoF, + 2.5OF; 145OF, -5OF. Copper crusher gages (2) sha
18、ll be used to measure the maximum chamber pressure of each charge. Velocity coils will be used to measure the muzzle velocity of each charge. Test charges shall be assembled in accordance with drawing 9333954 and MIL-C-63405. 5 Licensed by Information Handling ServicesL 1 MIL-P-63404 (AR) 4.5.1.1 Ch
19、arqe establishment (see Table 1). 4.5.1.1.1 Charge slope method. Three or more groups of charges loaded with selected charge weights of propellant (weights selected should bracket expected service charge weight) shall be conditioned and fired at 700F. Three calibration charges shall also be conditio
20、ned and fired at 70OF, with the test charges. From the data obtained, a charge weight shall be calculated which will yield the prescribed service velocity (see 3.2). This calculated charge weight shall then be loaded into charges for the uniformity series (see 4.5.1.2.1) . The difference between the
21、 corrected velocity obtained- during the uniformity series and the service velocity shall be compensated for by a final adjustment in charge weight using the slope of the velocity charge weight curve previously established. The resultant will be the recommended charge weight. 4.5.1.1.2 Constant slop
22、e method. After ten (10) lots of a given production series have been fired to provide a good knowledge of the propellant characteristics, the charge slope method of assessment may be discontinued and the charge weight determined by the constant slope method. A composite charge weight versus velocity
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP634041980PROPELLANTM6FORUSEINCHARGEPROPELLING155MMM119A2M119A2 155 MM 发射 系统 M6 PDF

链接地址:http://www.mydoc123.com/p-446819.html