ARMY MIL-P-63395-1980 PROJECTILE 155MM INERT PXR 6325 (M549 AND SIM) LOADING ASSEMBLING AND PACKING《PXR 6325型(M549和SIM型)155 mm惰性弹的装药 组装和包装》.pdf
《ARMY MIL-P-63395-1980 PROJECTILE 155MM INERT PXR 6325 (M549 AND SIM) LOADING ASSEMBLING AND PACKING《PXR 6325型(M549和SIM型)155 mm惰性弹的装药 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-63395-1980 PROJECTILE 155MM INERT PXR 6325 (M549 AND SIM) LOADING ASSEMBLING AND PACKING《PXR 6325型(M549和SIM型)155 mm惰性弹的装药 组装和包装》.pdf(12页珍藏版)》请在麦多课文档分享上搜索。
1、4 MIL-P-63395 13 7777706 0347b00 9 I /- $-3-7.-0$=- - /- MIL-P-63395 (AR) 12 August 1980 MILITARY SPECIFICATION LOADING, ASSEMBLING AND PACKING PROJECTILE, 155MM: IIWRT PXR 6325 (M549 (SIM) This specification is approved for use by US Army Armament Research and Development Command, and is available
2、for use by all Departments and Agencies of the Department of Defense. SCOPE 1. - 1.1 This specification covers the loading, assemblinq and packing of- the Projectile, 155MM: Inert PXR 6325 (M549 SIM) 2. APPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect on date -of invitation fo
3、r bids, or request for proposal, form a part of this specification to the extent specified herein. SPEC IF I CAT I ON S MILITARY MIL-1-45607 - Inspection Equipment, Supply MIL-A-48978 - Ammunition, Standard Quality and Maintenance of Assurance Provisions, General Specification For STANDARDS MILITARY
4、 MIL-STD-105 - Sampling Procesures and Tables for Inspection by Attributes FSC: 1320 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- _ MIL-P-63375 13 W 9777706 0347601 O MIL-P-63395 (AR) DRAWINGS (see 6.5) US ARMY ARMAMENT RESEARCH AND DEFLOPMENT CO
5、MMAND (ARRADCOM) 7549275 - Pallet 9236063 - Projectile, 155MM: Inert PXR 6325 (M549 SIM) (Copies of specifications, standards, drawings and publications required by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contra
6、cting officer). 3. REQUIREMENTS 3.1 Materials. Materials and parts shall be in accordance with the applicable drawings and specifications. 3.2 Assembled projectile. The assembled projectile shall comply with all requirements specified on Drawing (Dwg.) 9236063, and with all requirements specified in
7、 the applicable specifications. . 3.3 Inert fill. Inert fill shall have a specific gravity as specified on Dwg. 9236063. 3.4 LosJing of inert fill 3.4.1 Mating surfaces. The mating surfaces of threads shall be free of inert fill and all threads shall be free of foreign material. If a chemical cleane
8、r is required, acetone or methylene chloride shall be used. 3.4.2 Fuze well. The fuze well shall be free from any foreign matter or loose fill prior to assembly of the liner. 3.5 First article inspection. This specification contains technical provisions for first article inspection. Require- ments f
9、or the submission of first article samples by the contractor shall be as specified in the contract. 3.6 Workmanship. The requirements of workmanship are as shown on the applicable drawing, in the applicable specifi- cations and the following: 3.6.1 Cleaning. If required the cleaning method shall not
10、 be injurious to any of the parts nor shall the parts be contaminated by the cleaning agent. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-b3395 13 II 9999906 03Li9602 2 I MIL-P-63395 (AR) 3.6.2 Protection of the rotatinq band. Care shall b
11、e exercised am1 times so that the rotating band of each projectile will not be nicked or burred. 3.6.3 Painting. Painting shall comply with the require- ments of the applicable drawing. touch before testing and packing for shipment. Drying time prior to testing shall be in accordance with the applic
12、able specification. All paint shall be dry to the 3.6.4 Foreign matter. No part or assembly shall contain dirt, grease, chips, rust corrosion or other foreign matter, prior to inspection and shipping. protect obturator from being damaged. 3.6.5 Obturator. Care shall be taken at all times to 4. QUALI
13、TY ASSURANCE. PROVISIONS 4.1 Responsibility for inspection and standard quality assurance provisions. Unless otherwise specified herein or in the contract, the provisions of MIL-A-48078 shall apply and are hereby made a part of this detail specification. - 4.2 Classification of inspections. The foll
14、owing types of inspections shall be performed on this item: a. First Article Inspection b. Quality Conformance Inspection 4.3 First Article Inspection 4.3.1 Submission. The contractor shall submit a first article sample as designated by the Contracting Officer for evaluation in accordance with the p
15、rovisions of 4.3.2. The first article sample shall consist of the following items in sample quantities as indicated. Part Description Drawing Proj ect i le, 15 5MM: Inert PXR 6325 (M549 Sim) 9236063 4.3.2 Inspections to be performed. Table I cpezfied herein. Quant i ty a See MIL-A-48078 and 4.3.3 Re
16、jection. See MIL-A-48078. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-63395 13 m 9999906 03Li9603 Li m - 4J Fi al E U i 4 c o O Y n Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- -I a- M
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP633951980PROJECTILE155MMINERTPXR6325M549ANDSIMLOADINGASSEMBLINGANDPACKINGPXR6325 M549 SIM 155

链接地址:http://www.mydoc123.com/p-446815.html