ARMY MIL-P-51338-1969 PROJECTILE 105MM SMOKE WP M60E1 FILLING ASSEMBLY《M60E1式105 mm白磷烟幕弹(WP)用装填组件》.pdf
《ARMY MIL-P-51338-1969 PROJECTILE 105MM SMOKE WP M60E1 FILLING ASSEMBLY《M60E1式105 mm白磷烟幕弹(WP)用装填组件》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-51338-1969 PROJECTILE 105MM SMOKE WP M60E1 FILLING ASSEMBLY《M60E1式105 mm白磷烟幕弹(WP)用装填组件》.pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、-,-a- - - MIL-P-51338 13 777770b 0333753 7 FILLING ASSEMBLY 1. SCOPE 1 . 1 This specification covers the filling assembly with WPr of the 105MM, M60El projectile without fuzing components. 2. AFPLICABLE DOCUMENTS 2.1 Government documents. The following documents of the issue in effect on date of inv
2、itation fa bids or request for OpI, farm a part of this specification to the extent specified herein. SPECIF KATIONS M IL ITARY MIL-C-215 - Chemical Agent, White Phospharus (WP). STAN DARDS M iL ITARY MIL-STD-105 - Sampling Rocedures and Tables for Inspection by Attributes. DRAW IN GS US ARMY MUNITI
3、ONS COMMAND F9225939 DL8837835 - Pallet for Prolectile Metul Parts. DL8861520 - Marking Diagram for Pallets for Projectile 75MM to 120MM. - Profecttle, 105MM; Smoke, WP, MOEI, Filling Assembly. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-(Copies
4、of specifications, standards, drawings, and publications required by suppl ers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer.) 3. REQUIREMENTS 3 . 1 Materials and components. 3.1.1 Materials. All materials c
5、ited on Drawing F9225939 or on the subsidiary drawingszform to the specifications listed thereon, or to the specific characteristics set forth on the drawings. 3.1.2 Components. All components of the projectile shall conform to the specifi- cations and drawings listed on Drawing F9225939 and subsidi
6、ary drawings. 3,2 Filling and assembly. 3.2,l Filling. The projectile, clean and free of foreign matter, shall be filled with molten WP conforming to MIL-C-215 (see 6.2 and 6.3). When water is in contact with the WP during the fijling operation, the water shall be buffered by a suitable alkaline sal
7、t to maintain a pH value between 6.5 and 8.0. After test for leakage, the WP shall be solidified with the projectile in a vertical nose-up position. 3.2.2 Filling height. There shall be a 7 to 12 percent void, by total volume, existing above the surface of the water over the WP in the filled and clo
8、sed projectile. The depth of water remaining in the filled and closed projectile shall not exceed 1/4 inch. The projectile shall be radiographed in a vertical, nose-up position while the temperature of tile WP is 130 -I- 10.F when tested in accordance with 4.2.4.1 to determine filling height and sea
9、ting of the burster casing (see 6.3). 3.2.3 Assembly . The projectile skll be assembled in accordance with Drawing F9225939 except that the assembly shall not include the following: burster charge assembly, fuze well cup and pad. 3.3 Cleaning after closing. The exterior surface of the filled and clo
10、sed projectile, fuze threads and the interior of the burster casing shall be cleaned thoroughly to remove all grease, oil, and WP contamination. (See 6.4) 3.4 Leakage. When tested in accordance with 4.2.4.2, the closed and cleaned proiectm not leak when maintained at a temperature of 160 + 5F for a
11、period of 8 hours. Alternate method: The projectile shall not leak when maTntained at a tempera- ture of 207 to 212OF for a minimum period of 15 minutes. . ._. . r. o - #- , 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- . -Cu_ MIL-P-51338 13 E 7
12、777906 0333755 2 m MIL-P=51338(MU) 3.5 Workmanship. The projectile shall be free of all foreign matter (oil, grease, contamination) anddarnage such as dents, cracks, and deformation which could affect its intended use. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. 4,l . 1 Suppli
13、ers responsibllity. Unless otherwise specffied in the contract OT purchase order, the supplier is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified, the supplier may utilize his own facilities of any commercial laboratory acceptable to
14、the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to pescribed requirements. 4,1.2 Objective evidence. The supplier shall provide objective evidence ac
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP513381969PROJECTILE105MMSMOKEWPM60E1FILLINGASSEMBLYM60E1 105 MM 白磷 烟幕弹 WP 装填 组件 PDF

链接地址:http://www.mydoc123.com/p-446533.html