ARMY MIL-P-51303 B-1990 PROJECTILE 81-MILLIMETER SMOKE M375A3 WP FILLING《M60E1式81毫米白磷烟幕弹的装填》.pdf
《ARMY MIL-P-51303 B-1990 PROJECTILE 81-MILLIMETER SMOKE M375A3 WP FILLING《M60E1式81毫米白磷烟幕弹的装填》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-51303 B-1990 PROJECTILE 81-MILLIMETER SMOKE M375A3 WP FILLING《M60E1式81毫米白磷烟幕弹的装填》.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、= i MIL-P-5 1303B (EA) 14 November 1990 SUPERSEDING 9 September 1988 MIL-P-5 1303A(MU) MILITARY SPECIFICATION PROJECTILE, 81-MILLIMETER, SMOKE, M375A3; WP FILLING This specifcation is approved for use by the U.S. Army Chemical Research, Development and Engineering Center, Department of the Army, and
2、 is available for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification covers the white phosphorus (WP) filling of the M375A3 projectile, without fuzing components. 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications, standards,
3、and handbooks. The following specifications, stan- dards, and handbooks form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those listed in the issue of the De- partment of Defense Index of Specifications and Standards (DODISS) a
4、nd supplement thereto, cited in the solicitation (see 6.1). Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Commander, U.S. Army Chemical Research, Development and Engineering Center, ATN: SMCCR
5、-PET-SI Aberdeen Proving Ground, MD 2 10 10-5423 by using the self-addressed Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. AMSC NIA FSC 1315 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Provided b
6、y IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-5L303B 13 I 999990b 0478562 3 STANDARDS MILITARY MIL-STD-1168 - Ammunition Lot Numbering (Unless otherwise indicated, copies of federal and military specifications, standards, and handbooks are available fr
7、om the Standardization Documents Order Desk, Building 4D, 700 Robbins Avenue, Philadelphia, PA 1911 1-5094.) 2.1.2 Other Government documents, drawings, and publications. The following other Government documents, drawings, and publications form a part of this document to the extent specified herein.
8、 Unless otherwise specified, the issues are those cited in the solicita- tion. U.S. ARMY ARMAMENT RESEARCH, DEVELOPMENT AND ENGINEERING CEN- TER DRAWINGS 8885263 - Body Filling Assembly (Copies are available from Commander, U.S. Army Information Systems Command, ATN: ASQNC-ARI-CT, Rock Island, IL 61
9、229-7210.) U.S. ARMY CHEMICAL RESEARCH, DEVELOPMENT AND ENGINEERING CENTER DRAWINGS 90-1-378 - Interplant Pallet Assembly (Copies are available from Commander, U.S. Army Information Systems Command, A“: ASQNC-ARI-CT, Rock Island, IL 61229-7210.) 2.2 Order of precedence. In the event of a conflict be
10、tween the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 Materials and components. All materials and co
11、mponents cited on Drawing 8885263 and subsidiary drawings shall conform to the specifications listed thereon or to the specific characteristics set forth on the drawings. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-5 1303B(EA) 3.2 Filling
12、. The projectile, clean and free from foreign matter, shall be filled with mol- ten WP at a temperature of 140“ k 10F. When water is in contact with the WP during the filling operation, the water used shall be buffered by a suitable alkaline salt to maintain a pH value between 6.5 and 8.0. The depth
13、 of water remaining on the surface of the WP in the filled and closed projectile shall not exceed 1/4 inch. After testing, the filling shall be solidified with the projectile in a nose-up position (see 6.2 and 6.3). 3.3 Assembly. Closing, coating, and marking of the projectile shall be in accordance
14、 with Drawing 8885263. 3.4 Filling height. There shall be a 2 to 7 percent void, by total volume, existing above the surface of the water over the WP in the filled and closed projectile. The projectile shall be radiographed in a vertical, nose-up or nose-down position while the temperature of the WP
15、 is 130“ k 10F when tested as specified in 4.2.6.2 (see 6.3). 3.5 Cleaning after closing. The exterior surface of the filled and closed projectile and the interior of the burster casing shall be thoroughly cleaned to remove any grease, oil, WP, or other foreign matter (see 6.4). No abrasive shall be
16、 used. 3.6 Leakage. The closed and cleaned projectile shall not leak when maintained at a temperature of 160“ k 5“F, for a period of 8 hours. Alternate method: the closed and cleaned projectile shall not leak when maintained at a temperature of 207“ to 212F for a minimum period of 15 minutes. The pr
17、ojectile shall be tested as specified in 4.2.6.1. 0 3.7 Workmanship. The projectile shall be free from internal and external contamina- tion (foreign matter) and damage such as dents, cracks, and deformation which could affect its intended use. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for
18、inspection. Unless otherwise specified in the contract or pur- chase order, the contractor is responsible for the performance of all inspection require- ments (examinations and tests) as specified herein. Except as otherwise specified in the contract or purchase order, the contractor may use his own
19、 or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in this specification where such inspections are deemed necessary to ensure suppl
20、ies and services conform to prescribed requirements. 4.1.1 Responsibility for compliance. All items shall meet all requirements of sections 3 and 5. The inspection set forth in this specification shall become a part of the contractors overall inspection system or quality program. The absence of any
21、inspection requirements in the specification shall not relieve the contractor of the responsibility of ensuring that all products or supplies submitted to the Government-for acceptance comply with all require- 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license fro
22、m IHS-,-,-MIL-P-51303B 13 9999906 0478564 7 H MIL-P-5 1 30 3B (EA) QBb ments of the contract. Sampling inspection, as part of manufacturing operations, is an acceptable practice to ascertain conformance to requirements, however, this does not authorize submission of known defective material, either
23、indicated or actual, nor does it commit the Government to accept defective material. 4.1.2 Contractor assurance of compliance. The contractors quality program or de- tailed inspection system shall provide assurance of compliance of all characteristics with the applicable drawing, special packaging i
24、nstruction, and specification requirements using, as a minimum, the conformance criteria specified herein. 8 4.1.3 Alternative inspection provisions. Alternative inspection procedures, methods, or equipment, such as statistical process control, tool control, and other types of sampling procedures ma
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP51303B1990PROJECTILE81MILLIMETERSMOKEM375A3WPFILLINGM60E1 81 毫米 白磷 烟幕弹 装填 PDF

链接地址:http://www.mydoc123.com/p-446529.html