ARMY MIL-P-48698-1987 PROBE AND S&A ASSEMBLY TOW-2 E6《探针和S&A组件 TOW-2 E6》.pdf
《ARMY MIL-P-48698-1987 PROBE AND S&A ASSEMBLY TOW-2 E6《探针和S&A组件 TOW-2 E6》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-48698-1987 PROBE AND S&A ASSEMBLY TOW-2 E6《探针和S&A组件 TOW-2 E6》.pdf(93页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-P-48698 13 999790b 0323570 b = - 5-37-07 Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in Improving this document should be addressed to: Commander, US. Army Armament Munitions and Chemical Command, Ath. AMSMC-QA, Picatinny Arsenal, New Je
2、rsey 07806-5M) by using the self-addressed Standardiza- tion Document Improvement Proposai (DD Form 1426) appearing at the end of this document or by letter. I MIL-T-r? 8698 (AR) April 27, 1987 MIL I TARY SPEC IF1 CATION This specification is approved for use within the U.S. Army Armament, Munitions
3、 and Chemical Command and is available for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification covers the requirements, quality assurance provisions, testing and packaging of a probe for use in the TOW-2A Guided Missile. 2. APPLICABLE DOCUMENTS 2.
4、1 Government documents 2.1.1 Specifications and standards. The following specifications and standards form a part of this specification to the extent specified herein. Unless otherwise specified, the issues of these documents shall be those listed in the Department of Defense Index of Specifications
5、 and Standards (DoDISS) and supplement thereto, cited in the solici tation. SPECIFICATIONS m L ITARY MIL-S - 14 7 9 9 - Safety and Arming Device, Guided Missile: M114 LAP MIL-A48078 - Ammunition, Stanard Quality Assurance Provisions for MI L -P -7 O 6 61 - Potted Circuit Card Assembly for TO+2/E6 Pr
6、obe and S distribution is unlimited. 7. -. THIS DOCUMENT CONTAINS 7:3 PAGES. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-_ MIL-P-4b7 13 m 777770b 0323571 m MIL-P -4 8698 (AR) STANDARDS MIL ITARY MIL -S TD- 10 5 - Sampling Procedure and Tables for
7、 Inspection by Attributes DOD-STD-2000 - Soldering Technology High Qualitypigh Reliability 2.1.2 Other Government documents, drawings and publications. The following other Government documents , drawings and publications form a part of this specification to the extent specified herein. Unless otherw
8、ise specified, the issues shall be those in effect on the date of the solicitation. DRAWINGS Y US ARMY ARMAMENT, RESEARCH, DEVELOPMENT AND ENGINEERING CENTER (ARDEC) 9231500 - Safety and Arming Device, GM:114 93 87141 - TOW-2/E6 Probe and S&A Assembly (Copies of specifications , standards , handbook
9、s , drawings , publications , and other Government documents required by contractors in connection with specific acquisition functions should he obtained from the contracting activity or as directed by the contracting officer.) 2.1.3 Order of precedence. In the event of a conflict between the text o
10、f this specification and the references cited herein, the text of this specification shall take precedence. Nothing in this specification, however , shall supersede applicable laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 Materials. Materials shall be in acc
11、ordance with the appIicable drawings an specifications. - 3-2 Components and assemblies. The components and assemblies shall comply with all the requirements specified on drawings 9387141, 9231500, and all associated drawings and with all requirements specified in applLcable specifications and stand
12、ards. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-4869 8 (AR) 3.3 Item definition. The TOW-2/E6 Probe and S&A Assembly is an extendible device tu increase warhead standoff containing an explosive charge assembly to defeat improved armor.
13、A crush switch is provided at the forward tip of the probe and at the ogive immediately forward of the warhead. The probe is mechanically locked in the stowed position prior to launch and extends immediately after launch. The probe is actuated by a bore rider and extends by use of springs. Upon impa
14、ct the charge assembly detonates and after a specified delay, the main charge initiates. 3.4 Safety and arming device. The Safety and Arming (S&A) Device shall conform to all requirements of MIL-S-14799. The S&A shall be in the safe condition for shipping. The piston actuator shall not be fired, the
15、 spring detent shall remain in the G-leaf slot and the rotor shall remain in the unaligned position. The piston actuator spacer (dwg. 9231496) shall be present. No shorting screw shall be present. 3.5 Storaqe temperature. The probe shall be able to meet all requirements when tested in the operationa
16、l temperature range after it has been exposed to storage temperatures between -65OF and +155OF in the stowed position. 3.6 Transportation vibration. The probe with an inert S&A and an inert charge assembly shall not be visibly damaged and shall be able to meet all requirements after it is has been s
17、ubjected to the transportation vibration test. 3.7 Launch shock. The probe with an inert S&A and an inert charge assembly shall not be visibly damaged and shall be able to meet all requirements after it has been subjected to the launch shock test. 3.8 Operational temperature. The probe shall be able
18、 to meet all requirements at temperature ranges from -25OF to +140F regardless of temperature cycling. of the bore rider button is released to a point 0.25 inches minimum from the surface of the ogive. 3.9 Non-deployment. The probe shall not deploy when the flat 3.10 Deployment. The time from bore r
19、ider release to full extension of the probe shall not exceed 0.082 seconds. The bore rider shall be free to return to the retracted position after deployment. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-4b98 13 = 7937906 0323573 1 m MIL-P
20、-48698 (AR) 3.11 Breakaway strenqth. The probe shall not retract when 3.12 Length. The minimum length from the tip of a fully exposed to a breakaway force of 20.0 lbs minimum. extended and locked probe to the assembly base shall be 16.443 inches. 3.13 Weight. The maximum weight of the stowed TOW-2/E
21、6 Probe and S&A Assembly (dwg. 9387141) shall be 2.316 lbs. The weight of the deployed TOW-2/E6 Probe and S&A Assembly with a charge assembly (dwg. 9398046) shall not exceed 2.597 lbs. 3.14 Fliqht vibration. The probe with an inert SLA and an inert charge assembly shall not be visibly damaged and sh
22、all be able to meet all requirements after it has been subjected to the flight vibration test. deployed probe shall not exceed 0.020 inches. 3.16 Angular alignment. The angle formed between a line tangent to a point 2.5 inches aft of the probe tip and the warhead centerline shall not exceed 60 minut
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP486981987PROBEANDSAASSEMBLYTOW2E6 探针 SA 组件 TOW2E6PDF

链接地址:http://www.mydoc123.com/p-446432.html