ARMY MIL-P-46421 B-1975 PRIMER PERCUSSION M57 METAL PARTS FOR《M57式撞击引物用金属件》.pdf
《ARMY MIL-P-46421 B-1975 PRIMER PERCUSSION M57 METAL PARTS FOR《M57式撞击引物用金属件》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-46421 B-1975 PRIMER PERCUSSION M57 METAL PARTS FOR《M57式撞击引物用金属件》.pdf(11页珍藏版)》请在麦多课文档分享上搜索。
1、.r ic - MIL-P-46423B 33 779970b 0333735 - 4 I -. i i I / s-37-19 MIL-g46421B (PA) 10 July 1975 SUPERSEDING 30 April 1964 MIL-P-46421A CI) MILITARY SPECIFICATION PRIMER, PERCUSSION, M57 *. METAL PARTS FOR This specification is approved for use by all Departments and Agencies of the Department of Defe
2、nse. 1. SCOPE 1.1 This specification covers the metal parts for one type of percussion primer designated as Primer, Percussion, M57. 2. APPLICABLE DOCUMENTS 2.1 - The following documents of the issue an effect on date . of invitation for bids or request for proposal, form a part .of this specificati
3、on to the extent specified herein, SPEC IF1 CATIONS NIIL ITA RY MIL-A-2550 - Ammunition and Special Keapons, , General Specificatian for . STANDARDS MILITARY MIL-STD-105. - Sampling PrQcedures and Tables- for - - Inspection by Attributes MIL-STD-109 - Quality. Assurance Terms and Definitions MIL-STD
4、-1168 - Ammunition Lot Numbering NIL-STD-1169 - Packaging, .Packing and Marking for Shipment of Inert Animunttion Components MIL-STD-1235 - Single and Multilevel Continuous. Sampling Procedures and Tables for Inspection by Attributes FSC: 1390 i I. I . . fl THIS DOCUMENT CONTAINS /I PAGES. I Provide
5、d by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-46421B 13 W 737770b 0311736 b I f MIL-P-46421B (PA) DRAWINGS Anrm 8338012 - Cup, Battery 8838015 - Plug, Firing 8338016 - Metal Parts Assembly (Copies of specifications, standards, drawings and publicati
6、ons required by suppliers in connection with specific procurenient functions should be obtained from the procuring activity. or as directed by the contracting officer). I 3. PQUIREMENTS 3.1 Material.-Materials shall be In accordance with. applicable drawings and specifications . 3.2 Metal parts,-The
7、 metal parts shall coinply with all requirements specified on Drawings Cdwgs . Z 883801.2,. 8838015 and 88380iG, and with all requirements specified in applicable specifications. Hydrostatic test.-The primer tubing shall withstand the application of a minimum Cmin. ) hydrostatic .pressure without .
8、rupture or indication of flaws, as evidenced hy leaks and without permanent deformation beyond drawing requirement s, when tested as specified in 4.4.1 (see 6.3.1. Strength of brazed joint.-The brazed joint securing the head and body shall withstand a pull of 5500 pounds -wi-thout evidence of separa
9、tion, when tested as specified in 4.4i.2 I- 3.3 3.4 3.5 Workmanship.-All parts shall b fabricated and finished in a thorough, workmanlike manner. They shall be -clean and - free of burrs, sharp edges, unblended radii, surface defects, cracks, chips, dirt, grease, rust and other foreign matt The clea
10、ning method used shall not be injurious to any parts nor shall the parts be contaminated by the cleaning agent. 3.6 First article inspection.-This specification makes provision for first article inspection. Requirements for the submission of h first article samples by the contractor shall be as spec
11、ified in the contract . . - Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-. . . . . . . . 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for Inspection.-Unless otherwise specified in the contract or purchase order, the supplier is responsible f
12、or the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract .or order, the supplier may use his own or any other facilities suLtable for the perform- ance of the inspection requirements specified hepein, unless dia- approve by the Government;.
13、 In addition, the Government reserves the right to perfom any of the inspections set forth in the spec The initial production sample shall consist of C25.1 twenty-five complete set of parts (i.e,(252 twenty.-five each of every component) which have been produced by the contpactor or furnished by a s
14、upplier and which has been manufactured using the same . production processes, procedures and equipment which will 4e used in fulfilling the contract. All parts and materials, including packaging and packing shall be obtained from the same sources I L of supply as will be used in regular productton.
15、 .The sample shall be accompanied by certificates of analysis for materials. An initial production sample, or portion thereof, as directed by the contracting officer, shall also be submitted whenever there is a lapse in production for a period in excess OC PO .days, or whenever a -change occurs in m
16、anufacturing process? material used, drawing, specification or source of supply as to significantly affect product uniformity 8s determined By th6 Qovernment: Prior to subrilission, the contractor shall inspect th.e saniple to the degree necessary to assure that it conforms to the requipenients of t
17、he contract and submit a record of this inspection with the sample. A sample containing known defects will not he submitted unless specifically authorized by the contracting officer. Inspections to be performed.-Components will be. subjected by the Governmen6 to any or all of the examinations r 4.2.
18、2 I 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-46LIZLB 13 W 9999906 031L93 T W -I MIL-P-46 42 1B 4PA) 9 or tests specified in 4.3.2 and 4.3.3 of this specification and any or all requirements of the applicable drawings. any of the applic
19、able requirements, the initiai production sample shall be rejected. Th.e Cfoverment . reserves the right to terminate its inspection upon any failuze of a component in the sample to comply with any of the stated requbrements. -In the event of rejection, the Government reseryes the right to require t
20、he contractor to take corrective. ctzon .and submit a new initial production sample or portion thereof. Until an initial production is accepted, the contractor is in no way authorized by the Government to initiate regular production unless atheruise directed by the contracting officer. . 4.2.3 Rejec
21、tion.-If any component fails to comply with 4.3 fispection provisions 4.3.1 inspection Lot Formation.4he term tf$.nspectQn lotit. . is defined as a homogeneous collection of units: of product from which a representative sample is drawn or which is inspected 100. percent to determine conformance with
22、 applicable requirements. Units of product selected for inspection shall represent .only the inspection lot from which drawn and shall not be construed to rep-. resent any prior or subsequent quantities presented for inspection. Homogeneity shall be considered to exist provided the inspection lot ha
23、s been produced by one manufacturer, ,in one Unchanged process, using the same materials and methods, in accordance with the same drawings, same drawing revisions, same specifications and same specification revisions, and complies with the .provisions for sub- mission of product as specified in MIL-
24、STD-105. All material sub- mitted for inspection in accordance with this specification shall comply with the homogeneity criteria specified herein, .regardless of the type of inspection procedure which 3s .being applied to. de-. termine conformance with requirements . Lot numbering, .as required, sh
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP46421B1975PRIMERPERCUSSIONM57METALPARTSFORM57 撞击 引物 金属件 PDF

链接地址:http://www.mydoc123.com/p-446294.html