ARMY MIL-P-46269-1960 PRIMER PERCUSSION ELECTRIC M75 METAL PARTS FOR《M75式电撞两用引物用金属件》.pdf
《ARMY MIL-P-46269-1960 PRIMER PERCUSSION ELECTRIC M75 METAL PARTS FOR《M75式电撞两用引物用金属件》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-46269-1960 PRIMER PERCUSSION ELECTRIC M75 METAL PARTS FOR《M75式电撞两用引物用金属件》.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-P-462b9 13 7779706 0310544 b m s-37-17 KUlTAR SPECIFICATIOE PRIIW, PERCSSI, EIZCIIRIC, “75 mrAL PARTS FOR 1. scope 1.1 Thfe eptciifcatfon cover8 the =tal ppte for one type primer mlgmted as Priiez-, Iiecueion, Electric, m5 for use in Ay+,Uepy Amunition. 2.1 The following doeoPiiiente of thie les
2、ue n effect on bate of fivbtian for bids form 8 pert af this epcekfcation to the extent spscfe herein. W-T-111 - Tape; C-d (Sealing ard Securing) QQ-H-i5l - Idctale: General Specifleation for Inspection of PPP-B- - BOXGE, Pibe* PPP-(2-843 - Cushioning hteral, Celluloee MIL-C-490 - CbeanPng anb Prepa
3、ration of Farrow and Zinc Coated Surfaces 1IIL-G-2550 - General Speefficatian for Anrmuiitfon Except SnaU Apiae ldu-P-10025 - Fackagng and BhlrIng %OF DoPiestfr Shiprcnt oi Inert for OPganic Protective Coatings. Anaunition. Aiianmftion Components Provided by IHSNot for ResaleNo reproduction or netwo
4、rking permitted without license from IHS-,-,-MIL-P-462b7 13 I 997770b 0330545 8 I na-ST-log - sriiipiq Proctdurco and Wbbs for Inapectloa by Attrlbuter, Ma4TD-lOg - Inspection Pam and Definitiono. c-754956 - Boby A-754959 - Cloeure Asieirbly B-754962 - Ccataii#f Assembly B-7548483 - Dim, Cloefng 3.1
5、 Ilrferirl.-Yhteriala shall be In aceort. The test shall be performsd a8 specified in 4.3.2. 4.2.3.3 aupimre teat (aee 3.5) mur bfect.-Th+ earigling pian for thir teat shrill be ia accordance with ML-STD-lO5, using Table IV-A, cod4 letter K and an AU of 0.10 percent. 4.2.3.4 ir mesanre bet (ate dvg.
6、 754926 2).-he sanrpiing pian for aiil tert ahai be in accordance with MIL-STD-lO5, using ccde letter L and an AQL of 0.25 percent. The test 8haU be peromd a apacified in par8graph 4.3.4. 4.2.3.5 Freedom firam alkalies and strong acids.-Thrae sampling containerr from each four hour production ehsll
7、be eelected for thii, teat. peerimmed as specified in peragraph 4.3.5. 4.2.3.6 Freedarn from oil and greaae.-Three sample containers rcm each i- hour production shall be aelectsd for this teet. specified in 4.3.6. 4.2.4 Ispectian cquigmsnt.-For the peronrrnce of the examhutiom arid teats specified i
8、n 4.2 and 4.3, when applicable, the contractor shall have available, and utilize correctly, ali necemsary gagea, measuring and testing equipnt identified by -ex of inspection Equipment Lists No. GL-8801950, or approved equivalcnta tereto. When inspecta the contractore inspection equipment, the Gover
9、nment inspector will Betermine that the cmtractor has available, and utilizes correctly, gages, measurng and testing eqaipeient oi the required accuracy and precisian ami that the inetriinients are of the proper type and range to nmke masuremente of the required accuracy. standarde, and appropriate
10、inatwnts for regularly echeduled calibration of his inepection equipnt. iaaintaintd by the contractor anb mdd available for review by the Governiient. caltbration of gapes, staadards, and inetrioient0 wlll be periodically checked by authorized Government personnel. The teat ahall be perfarmed as spe
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP462691960PRIMERPERCUSSIONELECTRICM75METALPARTSFORM75 式电撞 两用 引物 金属件 PDF

链接地址:http://www.mydoc123.com/p-446276.html