ARMY MIL-P-20449C-1968 PRIMER PERCUSSION M61 PARTS AND LOADING ASSEMBLING AND PACKING《M61型撞击引物的装药 组装及包装部件》.pdf
《ARMY MIL-P-20449C-1968 PRIMER PERCUSSION M61 PARTS AND LOADING ASSEMBLING AND PACKING《M61型撞击引物的装药 组装及包装部件》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-20449C-1968 PRIMER PERCUSSION M61 PARTS AND LOADING ASSEMBLING AND PACKING《M61型撞击引物的装药 组装及包装部件》.pdf(19页珍藏版)》请在麦多课文档分享上搜索。
1、XIL-P-20449c (E-lu) NIL-P-SO440i3 (Nu) _ 18 October 1965 SJPEFSEDING . 15. September E63 2nd KIL-P-46408A (IITtf) 5 Sestembel? 1963 MILITARY SPECIFICATION PRIMER, ERCUSSION, M61 PARTS AND LOADING, ASSEPBLING AND PACKING 1. SCO?E 1.1 ThSs specification covers the parts and the loading, assembling and
2、 packing for one type of init4ating device designated as Wimer, Percussion, M61. re 2. APPLICABLE DOCUMEhTS 2.1 The following documents of the issue in effect on date of Znvitation for bids, or request for proposals, form a part of this specification to * General MIL-1-45607 - Inspection Eqliiprnent
3、, Supply and Specification for Maintenance of STANDARDS MILITARY MIL-STD-105 NIL-STD-109 ML-STD-1168 - Lot Numberinr Attributes (AX-STD-105) - Quslity AssuZance Terms and Definitions Sampling Procedures ar,d Tables for Inspection b;T Attributes FSC: 1390 Provided by IHSNot for ResaleNo reproduction
4、or networking permitted without license from IHS-,-,-MIL-P-20449C (NU) DRAWINGS U. S, AREY MUNTTIONS XMMAN 8831157 - ?rimer, Percu.ssicn, I461 Assembly 8861059 - .Box, Set-up, Packiag, Ammunition, Inner and Wtrr for Percussion Plmer, M61 8861060 - ax, Packing, Amunition for Percussion Frimer, M6L PU
5、BLICATIONS U. S. ARMY MUNITIONS COMMAND ET - 8831157 - EqGipment Tabulation (Copies of specifications, standards, drawings and publicattons requlred by contractors fin connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting cffi
6、cer.) 3. REQUIREMENTS 3.1 Parts.- The parts shall be in accor6ance with app7Lcable drawings and specif icattons . 3.2 Primer assembly.- The primer assembly shall comply with all requirements specified on Drawing (dwg.) 8831157 and wi%h all requirements specified in applicable s2ecifications. of a fi
7、ring failure (see 6.5 P when tes-bed as follows: 3.3 Functioning.- The rimer assembly shall not show evidence 3.3.1 Sensitivity.- The primer assembl shall fire wikhout any evidence of failure when a m _. 4.2.3 iie jection. - If ar:y componect fails to .comply with any of the applicable requ-Arements
8、, the first =ticLe sample shdl be rejected. inspectionupon any failure cf a comporrent to coaiply with aEy of the stated requirements. The Government reserves the right to terminate its 4,3 Inspection provisions 4.3.1 Lot formation.- The term 170tt as used throughout this speclfication refers to an
9、impection tot, which is defined as an essentially homogeneous collection of v.nits of product from which a representative sample is drawn 2nd irispected to determine con- formance of the lot with applicable requirements. The sample selected shall represent only that quar-tity of units from wkich the
10、 sample was drawn and shall not be construed to represent any prior or subsequent quantities presented for inspection. Homo- geneity Ehall be considered to exist provided the lot has been produced by one manufacturer, in one unchanged process, in accordance with the same drawing, same drawing revisi
11、on, same SpecLfication and same specification revision and complies with the provisions for submission of product as specified in MIL-STD-105. Changes to the process, specification, or drawing not affecting safety, performance, interchangeability, or storage, as determined by the Government, shall n
12、ot be deemed to alter the homogeneity of the lot, All material submitted for inspection in accoidance with this specification shall comply with the homogeneity criteria speczfied. herein regardless of the type of sazpling procedure which is applied to determine conformance with requirements. Lot num
13、berirrg, as required, shall be in accordance with XIL-STD-1168, Each lot of primers shall captain: batches which results in homcgeneity of all prircer mixture trsed in load9ng the entire primer lot, a. 2arts of one lot interfix number from one manufmture?, b. 3rimer mixture ckarge from one batch or
14、blending of 5 i Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-20449C (MU) _.- 4.3.2 Exm1nation.- Inspection fcr CritLcal. defects (End Major defects, when so specified) 4.1211 be 100 psrcent. SwLplLr? plans ELEC procedures for Major and Kncr
15、defects shall be in accordance with MIL-STD-105 except that. contim or cracked Visual e5003 Ma jcr : AQL 1,OO percent 101, Total length, ma. GEge 05002 102. Outside diameter, max. Gage .O5003 103. Anvil missing, inverted, cocked, loose or damaged to extent that function is impairedo.:.oe Visual 0500
16、4 704. Explosive on exterior; Visual 05005 105.- Cup dented or distorted . Visual 05006 Minor: AQL 0.65 percent 201. Evidence of poor workmanship other than specified in Critical above (see 3.4) Visual OS007 4.3,2.6 Inner set-up box, prior to sealing (see dwg. 8861059). Categorles Defects Kethod of
17、Code No. Inspect ion Critical: None defined MaJor : A listed in the ET she11 be in accordance with MIL-1-45607. 4.4 Test methods and procedures . I t Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-204q7C L3 H 7977906 0301004 b W MIL-P-2044% (K
18、U) then, with the flat end of a wooS.en rot-, gently and carefully crush the lumps agE.inst the asbestos mat. Allow the solvent to drain throt-gh the mat without suction. 15 ml. .portions of Chloroform, CompLeteness OZ extraction Kay be tested fcr at this point by adding 1 or 2 drops of the chlorofo
19、rm filtrate, 2 drops of alcoholic potassi- hydroxide solution ( 1 Nolar) on a white spot plate. extraction. portions of chloroform until it is as shown by test. Draw air through the crucible until no odor of chloroforn remains, and residue at 100 degrees Centigrade (C). for 15 minutes, cool in a des
20、iccator, and weigh. trinitrotoluene in the sample. RepeEt this extraction-with 2 more A red coloration indicates incomplete If extraction is not complete, continue with 15 ml. Dry the crucible Calculate the loss in weight to percentage of 4.4.2.2 Antimony sulfide.- Prepare 25 percent saturated ammon
21、ium acetate solutLon by dsluting ea“,ated amnoniun acetate sclution with 3 times its volume of water. crucible from the trinttrotoluene determination with 20 ml. of warm 25 percent saturated moniwi! acetate sclution. Allow the solution to remain in contact w2th the residue for 10 minutes, breaking u
22、p any lumps with the flaftened end of a glass rod. suction draw off the solvent into a clen flask, and repeat the extraction with 2 more 20 ml. portions of warm solution. At the end of the third lxeatment completeness of extraction may be tested for by treating 1 or 2 drops of the ammonim acetate fi
23、ltrate with 2 drops of dilute nitric acid and 2 drops of slightly acidified ferric alum solution on a white spot plate. If extraction is not complete, as shown by a red coloration, continue treatment of the residue with 10 ml. portions of the solvent, when extraction is complete, as shown by absence
24、 of red coloration when %wo drops of the filtrate are tested, wash the crucible and resieue thoroughly with water, collecting the washings with the monium ace5ate filtrate, residue with alcohol and ether, and aspirate until the odor of ether is no longer detectable. Then place the crucible with cont
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP20449C1968PRIMERPERCUSSIONM61PARTSANDLOADINGASSEMBLINGANDPACKINGM61 撞击 引物 组装 包装 部件 PDF

链接地址:http://www.mydoc123.com/p-446172.html