1、Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-l059OB( MU) Munitions Command DI0523459 IEL-10523459 - Projectile, iwiinating, 8m, 3012, Metal Parts Assembly - Index to Inspection Equipment List for Pro jectie, illuminating, 814, M301A2, Metal
2、Parts Assembly (Copies of specifications, standards, drawings and publications required by suppliers in connection with specific procurement functions should be obtained from the procuring activity OF as directed by the contracting officer. ) 3.1 General.- Materials, parts, and assemblies shall comp
3、ly with the requirements specified on the applicable drawings, referenced specifications and the following: 3.2 First article sample.- Requirements for submission of first article sample by the contractor shall be as specified in the contract. 3.3 Heat treatment or stress relief.- Heat treatment or
4、stress relief shall be uniform throughout each lot of components and shall be so conducted as to ppoduce the mechanical properties specified on the applicable drawing. 3.3.1 Hot forged heat treat method.- Prior to finish machining, projectile components manufactured from forgings shall be subjected
5、to heat treatment to attain the required mechanical properties. The heat treatment shall consist of heating above the critical temperature, followed by an oil quench. delay at a temperature suitable to produce required mechanical properties. After removal from the tempering furnace, the body forging
6、s shall be slowly cooled in air (forced air permitted) to a temperature of not more than 7000 F., after which cooling may be accelerated by water spray. After quenching, the body forgings shall be tempered without 3.3.2 Cold shaping and hot cup - cold drawmethods.- Cold working shall be so accomplis
7、hed as to produce in the projectile components the mechanical properties specified. relieved at a temperature of TOO0 F., minimun, following the final forming operation during which time plastic flow takes place. time at or above minhum temperature shall be established which will produce mechanical
8、properties specified on the applicable drawing. and time duration of a process anneal prior to final fodng operation shall be established by the ability to meet the required mechanical properties when formed by an approved sequence of operations. The projectile body shall be stress The minimum soak
9、The temperature 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- mL-P-10590B (m) 3.4 Mechanical properties. - All components shall meet the mechanical properties requirements as specified on the applicable 3.5 Metal defects.- All components shall b
10、e free from cracks, seams, splits, cold shuts, inclusions, porosity or similar defects. 3.6 Workmanship.- The requirements for workmanship are as shown on the applicable drawings, in the applicable specifications and the following: 3.6.1 Surface finish.- The requirements for surface are as detailed
11、on the applicable drawings. deep seams, pits, or other surface discontinuities. The cavity shall be free of burrs, scale, fins, 3.6.2 Protective coating. - Protective coating shall be in accordance with the applicable drawing and the specifications listed thereon. 3.6.3 Threads.- Threads shall be fu
12、ll and undamaged for the entire minimum length or depth as required by the applicable drawing and shall be in accordance with the provisions of Specification MIL-A-2550. 3.6.4 - Burr.- No part shall have a burr which might interfere with the assembly or function of the round or which might be injuri
13、ous to personnel handling the item. 3.6.5 Foreign matter.- No part or assembly shall contain dirt, grease, rust, chips, corrosion or other foreign matter. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. - Unless otherwise specified in the contract or purchase order, the supplier i
14、s responsible for the performance of all inspection sequirements as specified herein. Except as otherwise specified, the supplier may utilize his own facilities or any commercial laboratory acceptable to the Government. The Government reserves the right to perform any of the inspections set forth in
15、 the specifications where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.1.1 Quality assurance terms and definitions,- Reference shall be made to Standard MIL-STD-109 to define quality assurance terms used. 4.1.2 Inspection. - Inspection s
16、hall be in accordance with specification MIL-A-2550 except as specified herein. 3 - -1 - Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-4.2 First article smde. 4.2.1 Initial production sample.- At the beginning of regular production, a sample shall
17、be submitted in accordance with contract requirements and shall consist of the following: 5 metal parts assemblies, complete (painted) 5 metal parts assemblies, complete (unpainted) 5 sets component parts, unassembled (unpainted) 2 Cones, tail, prior to machining The sample shall be manufactured usi
18、ng the same materials, -auipment, processes and procedures as will be used in regular production. parts and materials including packaging and packing shall be the same as used in regular production and shall be obtained from the same source All of supply. 4.2.1.1 Examination and test. - After inspec
19、tion and provisional acceptance.at source, the sample shall be inspected for all reauirements of the drawings and specifications at a Government laboratory Gr such other facility specified in the contract. 4.2.1.2 Init5al production sample failure.- Failure of the sample to comply with the requireme
20、nts of the drawings and specifications shall result in sample disapproval. 4.3 inspection provisions. 4.3.1 - Lot. 4.3.1.1 Submission of product.- The product shall be submitted in accordance with MIL-STD-lo5 or MIL-STD-1235, as applicable. in the same heat treating equipment, at the same temperatur
21、e, in one unchanged process. basis for the selection of samples for the tension test hereinafter prescribed. The heat treatment lot thus constituted shall be the - _- MIL-P-10590B 33 W 7799906 0273236 1 4 3 1 2 Heat treatment lots. - Heat treatment lots shall contain component forgings from not more
22、 than one heat of steel that have been heat treated 4.3.1.3 Stress relieved lots.- Stress relieved lots shall contain cold worked components from not more than one heat of steel that have been cold worked by the sane process, utilizing the same tooling and equipment and stress relieved in the same f
23、irnace at the same temperature for the same length of time. be the basis for the selection of samples for the tension test hereinafter prescribed. The stress relieved lot thus constituted shall 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provid
24、ed by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-10570B 13 7777706 0273218 5 4.3.2.1.1 Cont d Defect MAJOR 101. Concentricity of pitch diameter of fin thread with forward outside diameter, including perpendicularity of body seat and rear face Parallel
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP10590B1966PROJECTILEILLUMINATING81MMM301A2METALPARTSASSEMBLYM301A2 81 毫米 照明弹 金属件 组件 PDF

链接地址:http://www.mydoc123.com/p-446063.html