ARMY MIL-M-70778-1988 MINE ANTI-PERSONNEL M86 ACCEPTOR LEAD ASSEMBLY FOR《杀伤地雷M86型接收器导线的安装》.pdf
《ARMY MIL-M-70778-1988 MINE ANTI-PERSONNEL M86 ACCEPTOR LEAD ASSEMBLY FOR《杀伤地雷M86型接收器导线的安装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-M-70778-1988 MINE ANTI-PERSONNEL M86 ACCEPTOR LEAD ASSEMBLY FOR《杀伤地雷M86型接收器导线的安装》.pdf(20页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-M-70778 13 7777906 0357432 T = s-37- 03 Beneticial comments (recommendations, additions, deletions) and any pertinent data which may be of use in Improving this document should be addressed to: Commander, U.S. Army Armament,Munitions and Chemical Command, Atm. AMSMC-QA, Picatinny Arsenal, New Je
2、rsey 07806-5000 by using the self-addressed Standardiza- tion Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. MIL-M-70778 (AR) 10 JULY 1988 . MILITARY SPECIFICATION MINE, ANTI-PERSONNEL, M86 ACCEPTOR . LEAD ASSEMBLY FOR . This specification is approve
3、d for use within the U.S. Army Armament Munitions and Chemical Command, and is available for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification contains requirements not normally covered by the drawings and provides quality assurance jyovisions f
4、or the fabrication of parts, loading, assembling and packing for one type of Acceptor Lead Assembly used in the munition Pursuit Deterrent Munition (PDM) M86. .- 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications and standards. The following specifications and standards form a pa
5、rt of this specification to the extent cpecif ied herein. Unless otherwise specified, the issues of these documents shall be those listed in the issue of the Department of Defense Index of Specifications and Standards (DoDISS) and supplement thereto, cited in the solicitation. SPECIFlCATIONS MILITAR
6、Y MIL-A-48078 - Ammunition, Standard Quality Assurance . Provisions, Genera Speclf ication For. AMSC N/A FSC 1345 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-M-7
7、0778 (AR) STAN DARDS MILITARY MIL-STD-105 - Sampling Procedures and Tables for MIL-STD-3 3 1 MIL-STD- 6 50 - Explosive:. Sampling, Inspection Inspection by Attributes. and Performance Tests for. and Testing. - Fuze and Fuze components Environmental 2.1.2 Other Government documents and publications.
8、The i following other Government documents and publications form a part of this standard to the extent specified herein. O t n M Co I Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-M-70778 13 m 77777Ob 0357g4b T m- MIL-M-70778 (AR) 4.4.3 Testing
9、. Testing is described in the First Article and Quality Conformance Inspection Tables. 4.4.4 Inspection equipment. The inspection equipment required ko perform the examinations and tests prescribed herein is described in the “Paragraph Reference/Inspection Method“ column in the tables starting with
10、4.4.2.1. The contractor shall submit for approval inspection equipment designs in accordance with the terms of the contract. See MIL-A-48078. 4.5 Methods of inspection. 4.5.1 Dimensional control of stamped parts. In place of the normal sampling associated with the Classification of Defects, and with
11、 the approval of the Contracting Officer, a sample of at least ten (10) parts shall be dimensionally inspected to qualify the tool used in the stamping process for use in production. In addition, a random sample of five (5) parts shall be selected from the last portion of each hours production for d
12、imensional inspection as a control of the tool during production, If any defective parts are found during qualification of the tool, the tool producing the defective Sart shall not be used in production . If any defective parts are found when inspection is performed for control of the tool, the tool
13、 producing the defective part shall be removed from production. Further, that portion of production since the last tool control check shall be returned to the contractor for corrective action. All tools removed from production because of some fault, may, after reworking, be returned to production pr
14、oviding they pass the qualification test above. The contractor may request a change of inspection frequency providing he presents objective evidence to the Contracting Officer to substantiate the request . 4.5.2 Moisture and volatiles content of explosive charge. The contractor shall provide adequat
15、e controls to insure compliance with the applicable requirements. The mositure and volatiles content of the explosive charge shall be determined at the loading station at the time of loading. This determination - shall be made at least once each four (4) hours of production. Sampling and testing of
16、the explosive charge shall be in accordance with MIL-STD-650, Method 101.5. In addition, if the moisture and volatiles content fails to comply with the requirement specified on the applicable drawing and loading has not begun, the explosive charge material shall be rejected until corrective action h
17、as been taken as verified by repeating the moisture and volatiles content determination. If loading has begun, acceptor lead assemblies loaded with the non-conforming explosive charge shall be rejected. 15 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-
18、,-,-MIL-M-70778 13 m 777770b 0357Li47 L W MIL-M-70778 (AR) 4.5.3 Density of explosive charge. A minimum of two (2) assemblies, representative of the acceptor lead assemblies being processed, shall be loaded and the densities determined to qualify each press prior to its use in production, In additio
19、n, a sample of two (2) assemblies shall be processed during the last portion of each one (i) hours production from each press and the density determined as a control of each press during production. If any defective assembly is found when inspection is performed for control of a press, the press pro
20、ducing the defective assembly shall be removed from production. Further, that portion of production since the last control check shall be returned to the contractor for corrective action. All presses removed from production because of some fault, may, after corrective action, be returned to producti
21、on providing they pass the qualification test above. The following procedure shall be used to determine the density of the explosive charge. a. Weight empty acceptor lead (grams). b. Measure bottom thickness (inches). c. Measure wall thickness (inches). d. Load cup. e. Weight loaded acceptor lead (g
22、rams). f . Measure height to top of charge (inches). g. Measure outside diameter of loaded acceptor lead h. Calculate weight of charge (e-a) (grams). i. Calculate height of charge (f-b) (inches). j. Calculate volume of explosive charge (cubic (inches). centimeters) = (.7854) x (16.39) x (g-2c) x (g-
23、2c) x (i). k. Calculate density of explosive charge (above). (grams per cubic centimeter) = (h/j). -. If any assembly fails to comply with the density requirements specified on the applicable drawing, it shall be classed defective. This is a destructive test. Assemblies so tested shall not be return
24、ed to the lot. 16 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-M-70778 13 = 777770b 0357448 3 a MIL-M-70778 (AR) NOTE: When weighing in water, use distilled water containing a suitable wetting agent, e .g. “Aerosol“ (lcc per 250cc distilled w
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILM707781988MINEANTIPERSONNELM86ACCEPTORLEADASSEMBLYFOR 杀伤 地雷 M86 接收器 导线 安装 PDF

链接地址:http://www.mydoc123.com/p-445982.html