ARMY MIL-M-12971 B-1966 MECHANISM VALVE REPLACEMENT M1《M1瓣膜置换机》.pdf
《ARMY MIL-M-12971 B-1966 MECHANISM VALVE REPLACEMENT M1《M1瓣膜置换机》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-M-12971 B-1966 MECHANISM VALVE REPLACEMENT M1《M1瓣膜置换机》.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-M-12971 B(MU) (Copies of specifications, standards, drawings and pub1 ications required by suppliers in connection with specific procurement functions should be ob- tained from the procuring activit
2、y or as directed by the contracting officer.) 3. REQUIREMENTS 3.1 Materials and components. 3,l . 1 Materials* All materials cited on Drawing DL6-15-85 or on subsidiary drawings shal I conform to the specifications I isted thereon or to the specific characteristics set forth on the drawings, 3.1.2 C
3、omponents. All components of the mechanism shall conform to the specifications and drawings listed on Drawing DL6-15-85 and subsidiary drawings, 3.2 Assembly, The valve replacement mechanism shall be assembled as spec- fied on Drawing 06=15-85. 3.3 Functioning, The valve replacement mechanism shall
4、function properly by replacing a valve under actual operating conditions when tested as specified in 4.2.4, 3.4 Workmanship, The mechanism shall be free from foreign matter (oil or grease) and damage such as dents, cracks or deformation.which could affect its use, 4, QUALITY ASSURANGE PROVISIONS 4.1
5、 Responsibility for inspection, 4,l , 1 Suppliers responsibility. Unless otherwise specified in the contract or purchase order, the supplier is responsible for the performance of all inspec- tion requirements as specified herein, Except as otherwise specified, the suppl ier may utilize his own facil
6、ities or any commercial laboratory acceptable to the Government, The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.1,2 Obiective evidence
7、, The supplier shall provide objective evidence acceptable to the contracting officer that the requirements of 3.1 and section 5 for which specific inspection has not been provided in this specification have been sa tisf led. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted wit
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILM12971B1966MECHANISMVALVEREPLACEMENTM1M1 瓣膜 置换 PDF

链接地址:http://www.mydoc123.com/p-445681.html