ARMY MIL-M-12760B-1963 MINE ANTI-PERSONNEL NON-METALLIC M14E1 WITH INTEGRAL FUZE PARTS FOR.pdf
《ARMY MIL-M-12760B-1963 MINE ANTI-PERSONNEL NON-METALLIC M14E1 WITH INTEGRAL FUZE PARTS FOR.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-M-12760B-1963 MINE ANTI-PERSONNEL NON-METALLIC M14E1 WITH INTEGRAL FUZE PARTS FOR.pdf(16页珍藏版)》请在麦多课文档分享上搜索。
1、-)i- .MIL-M-1276013(MU)+ 15 NOVEMBER 1963! SUPERSEDINGMIL-M-12760A (Oral)16 FEBRUARY 1962MILITARY SPECIFICATIONMINE,ANTI-PERSONNELNON-METALLIC,M14E1WITH INTEGRALPARTS FORFUZE1. SCOPE1.1 This specification covers the parts andparts assemblies for one type of mine de-signated as Mine, Anti-Personnel,
2、Non-Me-tallic, M14E1, with Integral Fuze.2. APPLICABLE DOCUMENTS2.1 The following documents of the issuein effect on date of invitation for bids or re-quest for proposals, form a part of this speci-fication to the extent specified herein.SPECIFICATIONSFEDERALQQ-L201 Lead, SheetUUT111 Tape; Paper; Gu
3、m-med (Sealing andSecuring)PPIP-B+36 Boxes, FiberMILITARYMILA+2550 Ammunition and Spe-cial Weapons, Gen-eral SpecificationforMILP1OO25 Packaging, Packingand Marking forInterplant Ship-ment of Inert Am-munition Com-ponents: GeneralSpecification forMIL145208 Inspection Require-ments, General Spe- cifi
4、cation forMIL145607 Inspection Equip-ment. Supply andMaintenance ofSTANDARDSMILITARYMITAWD-105D - Sampling Proceduresand Tables for In-spection by Attri-butesIWILSTD-109 Quality AssuranceTerms and Defini-tionsProvided by IHSNot for ResaleNo reproduction or networking permitted without license from I
5、HS-,-,-iMILM-12760B (MU)I MILSTD-12354ingle and MultilevelContinuous Sam-pling Proceduresand Tables for In-spection by Attri-butesDRAWINGSORDNANCECORPS82-15-52 Mine, Apers, NM,M14E1, With In-tegral Fuze, PartsAssembly and de-tails8861851 Carton, Packing, Am-munition, for Mine,Apers, NM, M14with Inte
6、gral Fuze.PUBLICATIONSORDNANCECORPSIEL7152622 Index of InspectionEquipment Lists(Copiesof specifications, standards, drawings andpublications required by suppliers in connection withspecific procurement functions should be obtainedfrom the procuring activity or as directed by thecontracting officer.
7、)3. REQUIREMENTS3.1 Material. Materials and parts shall bein accordance with applicable drawings andspecifications.3.2 Mine and fuze assemblies. The mineand fuze assemblies shall comply with allrequirements specified on Drawing (dwg. )82-15-52 and with all requirements speci-fied in applicable speci
8、fications.3.3 Internal air test. The fuze assemblyshall evidence no drop in pressure when sub-jected to an internal air pressure of not lessthan ten nor more than eleven pounds persquare inch gage (p.s.i.g.) for not less thanfive seconds when tested as specified in 4.4.1.3.4 Functioning. The fuze as
9、sembly shallrequire an axial load of not less than 20pounds nor more than 35 pounds to causesudden reversal of the belleville spring whentested as specified in 4.4.2. (see 6.4).3.5 Recovery of firing pin of the fuze as-sembly. The firing pin shall return to theminimum position required by the drawin
10、gafter a load just prior to functioning (see6.4) is applied and released when tested asspecified in 4.4.3.3.6 Arming torque. The torque requiredto arm the fuze assembly shall not exceed 18inch-pounds when tested as specified in4.4.6.3.7 Penetration of firing pin point. Thefiring pin point shall pene
11、trate into a leadcylinder a minimum of .04 inch. The eccen-tricity as measured between the center ofpenetration and the center of the leadcylinder shall not exceed 0.038 inch whentested as specified in 4.4.4.3.8 Jolt and jumble. The fuze assembly,assembled without cement and taped to themine body, s
12、hall withstand 1750 jolts in eachof the three positions of the jolt machine;and after completion of the jolt test, the as-semblies used in the jolt test shall withstand3600 complete revolutions in the jumble ma-chine without having any (a) cracking, chipping, or flaking ofthe visible surfaces.(b) ce
13、mented joints come apart orloosen.(c) damage to the firing spring as-sembly or lock key.(d) inner parts come apart, or anydamage which might interferewith satisfactory functioning.The tests shall be performed as specified in4.4.5.3.9 Workmanship. All parts shall be fa-bricated in a thorough workmanl
14、ike manner.2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-I.:.-:They shall be free ct cracks, chipped edges,Porositi, warpage, sinks, checks, blisters,scratches, excess flash, burrs, chips, sharp,edges, cracks, unblended radii, dirt, grease,rust, c
15、orrosion products and other foreignmatter. The cleaning method used shall notbe injurious to any part, nor shall the partsbe contaminated by the cleaning agent. Allrequired markings shall be neat and sharplydefined.4. QUALITY ASSURANCE PROVISIONS4.1 General quality assurance provisions.The supplier
16、is responsible for the perform-ance of all inspection requirements specifiedherein. Except as otherwise specified, thesupplier may utilize his own or any otherinspection facilities and services acceptableto the Government. Inspection records of theexaminations and tests shall be kept com-plete and a
17、vailable to the Government asspecified in the contract or order. The Gov-ernment reserves the right to perform any ofthe inspections set forth in the specificationwhere such inspections are deemed neces-sary to assure that supplies and services con-form to prescribed requirements. Referenceshall be
18、made to Standard MIL-STD-109 inorder to define terms used herein. The pro-visions of Specification MIL-A-2550 shallapply.4.1.1 Contractor quulity aswrance system.The contractor shall provide and maintainan effective quality assurance system in comp-liance with the requirements cif Specifica-tion MIL
19、-IA5208.4.1.2 Submission of product. At the timethe completed lot of product is submitted tothe Government for acceptance the con-tractor shall supply the following informa-tion accompanied by a certificate which at-tests that the information provided is cor-rect and applicable to the product being
20、sub-mitted:(a) A statement that the lot compliesMIL-M-12760B (MU)with all quality assurance pro-visions of the approved currentwritten description of the system.(b) Number of units of product in-spected.(c) Results obtained for all inspectionperformed.(d) Drawing, specification number anddate, toget
21、her with an identifica-tion and date cxf changes.,(e) Certificates of analysis on all ma-terial purchased directly by thecontractor when such material iscontrolled by Government speci-fications referenced in any of thecontractual documents.(f) Number of items in the lot.(g) Date submitted.The certif
22、icate shall be signed by a respon-sible agent of the certifying organization.The initial certificate submitted shall be sub-stantiated by evidence of the agents author-ity to bind his principal. Substantiation ofthe agents authority will not be requiredwith subsequent certificates unless, duringthe
23、course of the contract, this authority isvested in another agent of the certifyingorganization.4.1.3 Government vwifkutiwz. Using thecontractors written quality assurance pro-cedure, this detail specification, the appli-cable drawings and other contractual docu-ments as a guide, the Government inspe
24、ctorwill verify at unscheduled intervals all qual-ity assurance operations performed by thecontractor. Verification will be in accordancewith Specification MILI-452C8 and will beperformed to the extent necessary to assurecompliance with the contractual require-ments. Severity of Government inspectio
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILM12760B1963MINEANTIPERSONNELNONMETALLICM14E1WITHINTEGRALFUZEPARTSFORPDF

链接地址:http://www.mydoc123.com/p-445677.html