ARMY MIL-L-50470-1970 LINER FOR DEEP CAVITY LOADED PROJECTILE《用于深腔弹丸的衬垫》.pdf
《ARMY MIL-L-50470-1970 LINER FOR DEEP CAVITY LOADED PROJECTILE《用于深腔弹丸的衬垫》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-L-50470-1970 LINER FOR DEEP CAVITY LOADED PROJECTILE《用于深腔弹丸的衬垫》.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、I i 2- c. L MILITARY SPECIPICATION LINER, FOR DEEP CAVITY LOADED PEOJCCTILE 1. SCOPE 1.1 This specification covers the liner, for deep cavity loade proJectiles. 2. APPLICABLE DOCUMENTS 2.1 Thefollowing docunents of the issue in effect on date of invitation for bids or request for proposals form a pa
2、rt of this specification to the extent specified herein. SPECIFICATIONS MILITARY NIL-A-2550 -Ammunition and Special Weapons, MIL-1-45607 -Inspection Equipment-, Supply and General Specification for Maintenance of STAXDARDS MILITARY MIL-STD-105 -San;pling Procedures and Tables for MIL-STD-109 -Qualit
3、y Assurance Terms and Definitions MIL-STD-1168 -Lot Numbering of Ammunition MIL-STD-1169 -Packing an6 Marking for Shipment Inspection by Attributes (ABC-STD-105) of Inert Ammunition Components : General Specification for Sampling Procedwes and Tables for Inspection by Attributes MIL-STD-1235 -Single
4、 and Multilevel Continuous FSC: 1315 -. 5 I -.i.* .- E; .- *i Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-ARMY 8797092 -Liner PUBLIC AT IONS ARMY ET-8797092 -Equipment Tabulation (Copies of specifications, standzrds, rawings anti publications req
5、uire by contractors in connection with specific procurement functions should be obtafned from the proCuricg activity or as irected by the contracting officer). 3. REQUIRETENTS 3.1 Material.-Materials shall be in accordance with applicable drawings and specifications. 3.2 Parts.-The parts shall compl
6、y with all requirements specified on drawing (dwg) 8797092 and with al1 requirements specified in applicable specifications. 3.3 Workmanship.-All parts shall be dry a?d free of chips, burrs, dirt, grease, rust and other foreign material. The cleaning method shall not be injurious to any of the parts
7、, nor shall the parts be contaminated by the cleaning agent;. - 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection.-Unless otherwise specifled in the contract or purchase order, the supplier is responsible for the performance of all inspection requirements as specified here- in. Excep
8、t as otherwise specified in the contract or order, the supplier may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapprove by the Government. The Government reserves the rignt to perforn: any of the inspections set forth in
9、 the specification where such inspections are aeened necessary to assure supplies and services conform to prescribed reauirements. Reference shall be mas to Standard XIL-S?Il-iCg in order to define ternis use herein. The provisicns of Specification NIL- A-2550 snall apply. 4.1.1 Submission of proauc
10、t .-At the tirce ti:e conipleted lot of prouct is submittea to the Goverment for acceptance, - 2 r c Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-L-50470 13 iai 77799906 0327567 MIL- L, - 5 O 4 7 O ( KU ) the contractor shall supply the follow
11、ing infomation accompanied by a certificate which attests that the infopmation proviaec Is correct and applicable to the product being submitted: a. A statement that the lot complies with all of the quality assurance provisions specified within this specification. b. Number of units of product inspe
12、cted. c. Results obtainea, by aefect code, for all inspections performed. d. Drawing, specif.ication number and date, together with an identification and date of changes. e. Certificates of conformance on all material purchased by the contractor when such material is controlled by Government or comm
13、ercial specifications referenced in any of the contractual . documents. f. Number of items in the lot. g. Date submitted. The certificate shall be signed by a responsible agent of the certifying organization. The initial certificate submitted shall be substantiated by evidence of the agents authorit
14、y to bind his principal. Substantiation of the agents authority will not be required with subsequent certificates unless, during the course of the contract, this authority is vested in another agent of the certifying organization. 4.2 First Article Inspection 4.2.1 Submission.-The contractor shall s
15、ubnit a first article sample as designated by the contracting officer for evaluation in accordance with the provisions of 4.2.2. The first article sample shall consist of 25 liners which have been produced by the contractor or furnished by a supplier and which have been manufactured using the same p
16、roduction processes, procedures and equipment which will be used in fulfilling the contract. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used in regular production, Prior to submission, the contractor shall inspect the sample
17、to the degree necessary to assure that it conforms to the requirements of the contract and submit a record of this inspection with the sample, including statements of findings for materials, processes and tests. known defects will not be submitted unless specifically authorized by the Contracting Of
18、ficer. A first article sample, or portion thereof, as directed by the Contracting Officer, shall also be submitted whenever there is a lapse in production for a period in excess of 90 days or whenever a change occurs in manufacturing process, material used, rawing or specification such as to signifi
19、cantly affect product uniformity as determined by the Government. A sample containing 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-* MIL-L-50470 13 7777706 0327568 6 I 4.2.2 Inspecticn to be perforec.-AssecSlies and comnonents i3.1 be sub:ectc D
20、y the Government to any or ail the exminations or tests specifie-in 4.3.2 and 4.3.3 of this snecification ar, any or all requirements of the applicable drawings. 4.2.3 Rejection.-If any assembly or part fails to coply with the applicable requirements, the initial production samgle shall be re-jected
21、. In event of rejection, the Governrent reserves . the right to require the contractor to take coryective action anc subrr,it new or supplemental quantities until such time as an acceptable sample is submittea or until otherwise directed. by the Contracting Officer. 4.3 inspection provisions 4.3.1 L
22、ot forriation. -The tern iloti as used throughout this specification refers to an inspection lot, which is defined as an essentially homogeneous collection of units of product from which a representative sample is drawn and inspected to deternine conformance of the lot with applicable requirenents.
23、The sanple selected shall represent only that quantity of units from which the sample was arawn 2nd sha.11 not be construed to represent any prior or subsequent quantities presented for inspection. Homogeneity shall be considered to exist provided. the lot has been prouced by one manufacturer in one
24、 ur,changed process, in accordance with the sane drainrings, same rawing revisions, same specifications and szme specification revisions. Changes to the process, specification, or drawing not affecting safety, performance, interchangeability, or storage, as determined by the Government, shall not be
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILL504701970LINERFORDEEPCAVITYLOADEDPROJECTILE 用于 弹丸 衬垫 PDF

链接地址:http://www.mydoc123.com/p-445618.html