ARMY MIL-F-70737-1987 FUZE DEMOLITION KIT M1134A3 LOADING ASSEMBLING AND PACKING《M1134A3型引信拆卸工具包的装载 组装及包装》.pdf
《ARMY MIL-F-70737-1987 FUZE DEMOLITION KIT M1134A3 LOADING ASSEMBLING AND PACKING《M1134A3型引信拆卸工具包的装载 组装及包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-F-70737-1987 FUZE DEMOLITION KIT M1134A3 LOADING ASSEMBLING AND PACKING《M1134A3型引信拆卸工具包的装载 组装及包装》.pdf(21页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-F-70737 13 m 7777706 0357183 4 m 3-37-19 MIL-F-70737 (AR) 16 November 1987 I -7 ?- MILITARY SPECIFICATION FUZE, DEMOLITION KIT, ML134A3 LOADING ASSEMBLING, AND PACKING This Specification is approved for use within the U. S. Army Armament, Munitions and Chemical Command, and is available for use
2、by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scgpe. This specification contains requirements not normally cevered by the drawings, and provides quality assurance provisions for the loading, assembling, and packing of one type of fuze designated as ?uze, Demolition Kit,
3、M1134A3. 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications and standards. The following specifications and standards form a part of this specification to the extent: specified herein. Unless-otherwise specified, the issues sf these documents shall be those listed in the issue of
4、 the Department: of Defense Index of Specifications and Standards (DoDISS) and supplement thereto, cited in the solicitation. a SPECIFICATIONS MILITARY MIL- A- 4 8 Q 7 8 Ammunition, Standard Quality Assurance Provisions, General Specification For. STANDARDS MILITARY MIL-STD-LQ5 Sampling Procedures a
5、nd Tables for Inspection by Attributes. -.- Beneficial comments (recommendatigns, Bdditions, deletions) and any pertinent data which may be of use in improving this document should be distribution is unlimited. a , THIS DOCUMENT CONTAINS 2 / PAGES. -, -=-4 Provided by IHSNot for ResaleNo reproductio
6、n or networking permitted without license from IHS-,-,- MIL-F-70737 13 W 777770b 0357384 b W (AR) MIL-F-7 0 7 3 7 MIL-STD-331 Fuze and Fuze Components, Environmental and perfomance tests for 2.1.2 Other Government documents, drawings, and publications. The followincr other Government documents drawi
7、ngs, and publications form a part f this specification to the extent-specified herein. Unless otherwise specified, the issues shall be those in effect on the date of tie solicitation. DRAWINGS U.S. ARMY ARMAMENT RESEARCH, DEVELOPMENT AND ENGINEERING CENTER (ARDEC) PRODUCT AND PACKAGING DRAWINGS 8799
8、682 - Carton, Packing, Ammunition, for Fuze. 8799683 - Container, Fiberboard, Ammunition, for Fuze, 12597841- Fuze, Demolition Kit, M1134A2 Loading Demolition Kit, M1134A2. Assembly. (Copies of specifications, standards, handbooks, drawings, publications and other Government documents required by co
9、ntractors in connection with specific acquisition functions should be obtained from the contracting activity or as directed by the contracting activity.) 2.1.3 Order of precedence. In the event of a conflict between the text of this specification and the references cited herein, the text of this spe
10、cizication shall take precedence. specification however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. Nothing in this 3 . REQUIREMENTS 3.1 Material. Materials shall be in accordance with applicable drawings and specifications. 3.2 - Fuze. The loaded
11、fuze shall comply with all requirements specified on Drawing (Dwg.) 12597841, all associated drawings, and with all requirements specified in applicable specifications. requirements of MIL-STD-331 test 103.1 when tested as specified in 4.5.3. 3.3 Twelve meter drop test. The fuze shall conform with t
12、he 3.4 Leak test. The complete fuze shall show no evidence of leakage when tested as specified in 4.5.2. 3.5 Explosive functioning. The fuze shall function satisfactorily when tested as specified in 4.5.9. 2 I .* c Provided by IHSNot for ResaleNo reproduction or networking permitted without license
13、from IHS-,-,-v - MIL-F-70737 23 m 7779706 0357285 8 H I MIL-F-7 O7 3 7 (AR) 3.6 Jolt test. The fuze shall corieorm with the requirements of 3.7 Jumble test. The fuze shal-1 conform with the requirements MIL-STD-331 test 101.2, when tested as specified in 4.5.3. of MIL-STD-331 test 102.1 when tested
14、as specified in 4.5.5. 3.8 Drop test 1.5 meter. The fuze shall conform with the requirements of MIL-STD-331 test 111.1 criteria B. and shall be fully functional when tested as specified in 4.5.6. 3.9 Temperature and humidity. The fuze shall conform with the requirements of MIL-STD-331 test 105.1 whe
15、n tested as specified in 4.5.7. 3.10 Transportation vibration-temperature. The fuze shall conform with the requirements of specified in MIL-STD-331 test 119 when tested as specified in 4.5.8.- 3.11 Workmanship. All parts shall be loaded and assembled in a They shall be clean and free of burrs, thoro
16、ugh workmanlike manner. distortion, dirt, grease, corrosion products and other foreign matter. The cleaning method used shall not be injurious to any of the parts nor shall the parts be contaminated by the cleaning agent. Surface coatings shall be continuous except for a few light scratches not expo
17、sing base metal. All required markings shall be neat and sharply defined. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. Unless otherwise specified in the contract or purchase order, the contractor is responsible for the performance of all inspection requirements as specified her
18、ein. Except as otherwise specified in the contract or purchase order, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the ins
19、pections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.1.1 Responsiblity for compliance. AI1 items must meet all. requirements of sections 3 and 5. The inspection set forth in this specification shall
20、become a part of the cntractors overall inspection system or quality program. The absence of any inspection requirements in the speciigation shall not relieve the contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all req
21、uirements of the contract. Sampling in quality conformance does not authorize submission af known defective material, either indicated or actual, nor baes it commit the Government to acceptance of defective material. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without lice
22、nse from IHS-,-,-i MIL-F-70737 13 M 99999Ob 0357Lb T M MIL-F-70737 (AR) 4.2 Classification of inspection. The following types of inspection shall be conducted on this item: a. First article inspection. b. Quality conformance inspection. 4.3 First article inspection. 4.3.1 Submission. The contractor
23、shall submit a first article sample as designated by the Contracting Officer for evaluation in accordance with provisions of 4.3.2. The first article sample shall consist of the following items in sample quantities as indicated: Part Description Drawinq Quantity Rotor Lead Assembly 9370098 20 Rotor
24、Assembly Loaded 12597843 5 Booster Lead Assembly 9370113 20 Assembly 12597850 5 Container/Booster Loaded Fuze, Demolition Kit, M1134A3 Fuze, Demolition Kit, M1134A2 Loading Assembly (prior to crimping) 12597841 30 Loading Assembly 12597841 150 4.3.2 Inspections to be performed. See MIL-A-48078 and T
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILF707371987FUZEDEMOLITIONKITM1134A3LOADINGASSEMBLINGANDPACKINGM1134A3 引信 拆卸 工具包 装载 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-444867.html