ARMY MIL-F-63270-1978 FUZE POINT INITIATING BASE DETONATING M509A1E1 LOADING ASSEMBLING AND PACKING《基地引爆弹突起爆引信M509A1E1的装载 组装和包装》.pdf
《ARMY MIL-F-63270-1978 FUZE POINT INITIATING BASE DETONATING M509A1E1 LOADING ASSEMBLING AND PACKING《基地引爆弹突起爆引信M509A1E1的装载 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-F-63270-1978 FUZE POINT INITIATING BASE DETONATING M509A1E1 LOADING ASSEMBLING AND PACKING《基地引爆弹突起爆引信M509A1E1的装载 组装和包装》.pdf(21页珍藏版)》请在麦多课文档分享上搜索。
1、Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-F-63270 (AR) 4.3 Quality conformance inspection 4.3.1 Inspection lot formation.-Inspection lots shal
2、l com- ply with the lot formation provisions of MIL-A-48078. tion, inspection lots shall contain: manufacturer. In addi- a. Parts bearing the same lot interfix number from one b. Explosive material for lead charges from not more than two consecutive lots with the same lot interfix number from one ma
3、nufacturer. C. Explosive material for booster pellets from not more than two consecutive lots with the same lot interfix number from one manufacturer. 4.3.2 Examination,-One hundred percent examination shall be performed for all Critical defects and Major defects when so specified. Examination for M
4、ajor and Minor defects shall be performed on a defect basis in accordance with the Classifica- tion of Defects contained herein using the sampling plans of MIL-STD-105, Level II, All non-conforming material shall be rejected, see MIL-A-48078. NOTE: Critical Defect Reporting - A report of all Critica
5、l Defects found, number of parts or assemblies inspected for Critical defects, and corrective action taken, if any, shall be compiled monthly for the duration of the contract and copies forwarded to the Contracting Officer and Commander, ARRADCOM Hqts, Dover, NJ 07801, ATTN: DRDAR-LCR-E and DRDAR-QA
6、-A-F. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-i+ u B 3 I m Y m ? m 9 u - Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-F-63270 13 777770b 03LibA71 3 o00 5 a o) Q O 4 4 m F Provided by IH
7、SNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-F-63270 13 9997706 0346872 5 m . .* ao Q o o OQ ln O Y LH O . -, 6 - . Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-F-63270 23 M 7797706 03Li6873 7 M G O 4
8、 In i -9 P B O 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-F-63270 13 m 7777706 034687q 7 m z 0 !. a dP O O b: CiP In O Y Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-U cr 0 o P r F - a f
9、? E -4 3 N m - to the specified requirement, the entire batch repre- sented by the saplc shall. be rejected. Reconsolidated pellet in lead cup - (see dwg. 8799767) Major aefect-.-A sample of. twenty (20) 1 oaded lead cups shall be selected from each batch for this determination which shall be perfor
10、med as specified in 4.4.2.2. samples fail to conform to the specified requirement the entire batch represented by the sample shall be rejected. If one or more samples fail 4.3.3.4.2 If one or more 4.3.3.5 Functionin .-These tests shall be performed at a Government Provxng + roz.jltGo Provided by IHS
11、Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-F-63270 13 m 9999
12、906 03Llb8q L m MIL-P-6 32 70 (AR ) the wire loop, without the lead cup, is submerged to the depth required to submerge the lead cup. For analytical balances that do not utilize pan, or are of special design, a comparable pro- cedure shall be established. The height of the water shall be maintained
13、throughout the test . C. Place the lead cup in the loop, open end up, and check to assure that all bubbles have been removed from the exterior surfaces when loaded and interior surfaces when empty. Balance and record this weight to the nearest 0.001 gram. To determine the specific gravity of the Com
14、p A-5 lead charge proceed as follows: 1) Weigh the loaded lead cup in air, record this weight as A. 2) Weigh the loaded lead cup under water, record this weight as B. 3) Subtract B from A and multiply by 0.9977. Record 4) the result as the volume of the loaded lead cup, V1. Remove the Comp A-5 charg
15、e from the lead cup by soaking and washing with chloroform and acetone. After all visible traces of the Comp A-5 have been removed, dry. the lead cup, weigh in air, and record this weight as C. this weight as D. , 5) Weigh the empty lead cup under wateg and record 6) Subtract D from C and multiply b
16、y 0.0077. Record the result as the volume of the empty lead cup Ve. 7) Subtract Ve from V1 and record the result as the volume of Comp A-5 (Pv). 8) Subtract C from A and record the result as the weight of Comp A-5 (Pw). 9) Divide the weight of the Comp A-5 (Pw) by the volume of the Comp A-5 (Pv) and
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILF632701978FUZEPOINTINITIATINGBASEDETONATINGM509A1E1LOADINGASSEMBLINGANDPACKING 基地 引爆 突起 引信 M509A1E1

链接地址:http://www.mydoc123.com/p-444825.html