ARMY MIL-F-51376-1974 FUZE HAND GRENADE M227《M227手榴弹引信》.pdf
《ARMY MIL-F-51376-1974 FUZE HAND GRENADE M227《M227手榴弹引信》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-F-51376-1974 FUZE HAND GRENADE M227《M227手榴弹引信》.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-G-5l1376 13 W 7777906 033q007 5 a 3-37-/7 MIL-F-51376(JQI) MILITARY SPECIFICATION FUZE, HAND GRENADE, 227 This specification is approved for use by all De- partments and Agencies of the Department of Defense. 1. SCOPE 1.1 2. APPLICABLE DOCUMENTS 2.5. Government documents. The following documents
2、 of the issue in effect on date of invitation for bids or request for proposal, form a part of this specification to the extent specified herein: This specification covers one type of fuze. SPEC IF ICATIONS FEDERAL PPP-B-636 - Box, Fiberboard. PPP-F-320 - Fiberboard; Corrugated and Solids, Sheet Sto
3、ck (Con- tainer Grade) and Cut Shapes. MILITARY MIL-B-117 - Bags and Sleeves and Tubing, Interior Packaging. MIL-B-131 - Barrier Materials Water Vapor Proof, Flexible, Heat Sealable. STANDARDS MILITARY MIL-STD-105 - Sampling Procedures and Tables for Inspection MIL-STD-129 - Marking for Shipment and
4、 Storage. by Attributes. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-G-5L37b 13 M 7977706 0334011 3 _ - 3*4*3 FiVe-foQt drop. The fuze shall com
5、ply with the requirements of MIL-STD-331 and 3.3 after testing when tested as-specified in 4.3.4.3. 3.4.4 Vibration, specified in 4.3.4.4. The fuze shall comply with 3.3 after testing as 3.4.5 Leakage, The fuze shall comply with MIL-STD-810 and 3.3 after testing as specified in i1.4.4.i. a- ,- 3.5 P
6、reproduction. Prior to the start of regular production, a preproduction lot of fuzes shall be produced in accordance with this specification for examination and test. 3.6 Workmanship. The fuze shall he free from foreign matter (ex- cessive thread sealant, oil, grease or dirt) and damage such as crac
7、ks, dents or deformation which could affect its intended use. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection, 4.1.1 Suppliers responsibiliy. Unless otherwise specified in the contract or purchase order, the supplier is responsible for the perfor- mance of all inspection requiremen
8、ts as specified herein. Except as otherwise specified in the contract or order, the supplier may use his own or any other facilities suitable for the performance of the inspec- tion requirements specified herein, unless disapproved by the Govern- ment. The Government reserves the right to perform an
9、y of the inspec- tions set forth in the specification where such incaections are deemed necessary to assure supplies and services conform to specified require- ment s. 4.1.2 Objective evidence. The supplier shall provide objective evi- dence acceptable to the contracting officer that the requirement
10、s of 3.1 and section 5 for which specific inspection has not been provid-ed in this specification have been satisfied 4.2 Classification of inspections. (a) Preproduction inspection (see 4.3). (b) Quality conformance inspection (see -4.4). Provided by IHSNot for ResaleNo reproduction or networking p
11、ermitted without license from IHS-,-,-MIL-G-5L37b 13 77777Ob 0334032 5 - 4.3 Preproduction inspection,. 4.3.1 -3-6-68 and 4.4.4.1 in that order and wtth table I. with 4.3.4.1 using an AQL of 1.5. with 4.3.4.2 using an AQJ of 1.5. 4.3.4 Tests. Tests shall be conducted as follows: 4.3.4.1 Jolt. Test t
12、he fuze in accordance with test 101 of ,qL-STD- 331 4.3.4.2 Junible. Test the fuze in accordance with test 102 of MIL-STD- 331 4.3.4.3 Five-foot drop. Test the fuze in accordance with test 111 of MIL-STD-331 except that breakdown inspection is not required. 4 Provided by IHSNot for ResaleNo reproduc
13、tion or networking permitted without license from IHS-,-,-a 4 a , a- MIL-G-51376 13 m 7777906 033LI013 7 I MIL-F-51376 (EA) 4.3.4.4 Vibration. Test the fuze in accordance with test 104, procedure II of MIL-STD-331, except that assembly to inert grenade and breakdown inspec- tion is not required. 4.3
14、.5 Acceptancebrejection criteria. The preproduction lot shall comply with the examinations and tests specified in 4.3.3 to be acce9t- able. officer prior to proceeding with reguiar production. The supplier shall obtain written approval from the contracting 4.4 Quality conformance inspection. 4.4.1 L
15、otting. Each lot shall be identified and controlled in accordance with MIL-STD-1168. However, no more than one interfix number of each component (primers, first fire pellets, delay pellets and ignition mix) from one manufacturer shall be contained in any one lot of assembled fuzes. 4.4.2 Sampling. 4
16、 4.2.1 For examinat ion. Sampling shall be conducted in accordance nith MIL-STD-105. 4.4.2.2 - For destructive tests. Sampling shall be conducted in accord- ance with MIL-STD-105, inspection level S-4. 4.4.3 inspection pmcedurc. 4.4.3.1 For examination. The sample fuzes and the level C preparation f
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILF513761974FUZEHANDGRENADEM227M227 手榴弹 引信 PDF

链接地址:http://www.mydoc123.com/p-444766.html