ARMY MIL-F-48373 A-1984 FUZE POINT DETONATING M739 LOADING ASSEMBLING AND PACKING《M739 装载弹突起爆引信 组装及包装》.pdf
《ARMY MIL-F-48373 A-1984 FUZE POINT DETONATING M739 LOADING ASSEMBLING AND PACKING《M739 装载弹突起爆引信 组装及包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-F-48373 A-1984 FUZE POINT DETONATING M739 LOADING ASSEMBLING AND PACKING《M739 装载弹突起爆引信 组装及包装》.pdf(22页珍藏版)》请在麦多课文档分享上搜索。
1、5 P r M n 8 Y) d Y w z O 5 i 3 2 u 8 t rl a k a, 4J 8 a 4J a, FI 1: it Bsg - MIL-F-48373A 13 W 7777906 0427346 b = Fi 8- 8 z E a rl Id 5 rn .I4 3 1 W aJ v) aJ U 4 I- m n - a, L r) cn 3 X + n 3 9 -4 n c 8 Licensed by Information Handling Servicesc E Y 2 a a id 2 c U . -rl I* :ti o CJ m * . rl drl o m
2、m m .I * (u E: O 4 a. 8 8 9 9 Licensed by Information Handling ServicesQ) O m 4 pi $ 8 .rl rl a x w a id s I- cv m . * I - MXL-F-LIB373A 13 W 777770b 0427353 T W cv cv cv Cu cvcv W m m m m mm m * * . 9. * O . . 0. * ?I o o o O0 O b a QI o c 9 n 3 D -i - I E n a Ii Licensed by Information Handling Se
3、rvices1. C P O 2 8 U a .rl CI O 4J 8 4 k Pi Co O In Y 2 8 al 3 .rl I MIL-F-48373A 13 = 7779706 0427352 L W C In -i ni m * I In 11 Licensed by Information Handling Servicesri B t ri ff u O I4 8 .rl ci U 7 k u rnld du a aaJ ldu 32 QI (v m cr e . MIL-F-48373A 13 7779906 0927353 3 u) m 0 O In P i 3 0 C
4、x . . 12 Licensed by Information Handling Servicesz O H w U O ii irc z O u 3i I3 H c 6 6 e e a c: I Ei I c: . r ii r )I d If w n 8 Y Y Z O F 2 f O rl 8 ti rl a rlrl mm 00 u) U 13 Licensed by Information Handling Servicesw li O Li 2 u & al U 1 O c O .rl U .I4 C b 1 4 b cn c .rl Y u ia pi b E? I U al
5、v) b al d d cv M w 0 . b - MIL-F-48373A 13 797770b 0427355 7 W t drl mm * HdP O0 ve O0 *. L) Li o Q1.5 u 07 iaLI EO UiE al 31 CI“ r n 2 O I E L O L Y 3 14 Licensed by Information Handling Servicesrl b t rl ir MIL-F-q373A 13 9999906 0427356 rlrlrl rl mmm m e , dpdpa, dp O00 o *did di O00 o a e 8 0 c
6、& 15 Licensed by Information Handling ServicesMIL-F-4B373A 13 777790b 0427357 O W 4.3.3 MIL-F-48373A (AR) Testing. 4.3.3.1 Transportation Vibration. 4.3.3.1.1 Beginning with the first lot produced and continuing until three (3) consecutive lots have been found. acceptable a sample of fifteen (15) lo
7、aded fuzes shall be randomly selected from each lot for the test. If any assembly fails to comply with the requirements of the test, the lot shall be rejected. 4.3.3.1.2 After three (3) consecutive lots have complied with the criteria of 4.3.3.1.1 the sample size shall be as specified in 4.3.2.3. If
8、 any assembly fails to comply with the requirements of the test, the lot shall be rejected and testing shall revert to 4.3.3.1.1. 4.3.3.2 Proving Ground Tests. 4.3.3.2.1 Beginning with the .rirst lot produced and continuing until three (3) consecutive lots have been found acceptable a sample size of
9、 seventy (70) shall be randomly selected from each lot for the test. The lot shall be rejected if the requirements of 4.4.2.1 are not met. 4.3.3.2.2 After three (3) consecutive lots have complied with the criteria specified in 4.3.3.2.1, the sample size shall be as specified in 4.3.2.3. The lot shal
10、l be rejected if the requirements of 4.4.2.2 are not met and testing shall revert to 4.3.3.2.1. 4.3.3 Inspection Equipment. The inspection equipment re- quired to perform the examinations and tests prescribed herein is described in the “Paragraph Reference/Investigation Method“ column in the tables
11、starting with paragraph 4.3.2.1. The contractor shall submit for approval inspection equipment designs in accord- ance with the terms of the contract. See Section 6 of MIL-A-48078 and 6.3 herein. 4.4 Methods of Inspection. 4.4.1 Transportation Vibration Test. The loaded fuze assem- blies shall be su
12、bjected to the transportation vibration test in accordance with MIL-STD-331, Test 104, Procedure II. The sample shall then be radiographically inspected in two planes as follows to determine compliance with the safety aspects of the test: 16 Licensed by Information Handling Servicesu. MIL-F-48373A 1
13、3 W 739970b 0427358 2 W 0 MIL-F-48373A (AR) a. Horizontal Plane - Screwdriver slot facing viewer. b. Horizontal Plane - Screwdriver slot at left. As a minimum inspection requiremegt IorCritical Defects, no S&A shall be in an armed or partially armed condition. As a minimum inspection requirement for
14、 Major Defects, the x-ray shall indicate that no metal parts components are broken. Fuzes subject to this test shall be forwarded to the Proving Ground for testing as specified in 4.4.2. 4.4.2 Proving Ground Tests. 4.4.2.1 The fuzes shall be assembled to the appropriate HE loaded projectiles, except
15、 for the non-functioning test where inert loaded projectiles with T2 supplementary charges shall be usedl and fired from the weapons specified below. Target distances for all phases except the one (1) inch plywood screen shall be any convenient distance. l%e quadrant elevations shall be as specified
16、 below. DEFECT ACCEPT REJECT Premature Burst Non Functioning Duds Reverse Functioning O O 1 1 WEAPON ZONE QUADRANT ELEVATION Non Functioning 105MM M102 7 1 1 2 2 SAMPLE SETTING SIZE TARGET FUZE 1“ Plywood SQ 10 115 Feet Functioning 105MM M102 7 Low Ground SQ 20“ 105MM M102 7 1“ Plywood SQ 10 155MM M
17、109A1 2 Low Ground SQ 20“ e500 Feet * 10 Transportation Vibration Condition Fuzes * 5 Transportation Vibration Condition Fuzes 17 Licensed by Information Handling ServicesMIL-F-q373A 13 7779706 0427357 m I. MIL-F-48373A (AR) 4.4.2.2 The testing shall be conducted as specified in 4.4.2.1 s except tha
18、t the acceptance criteria and weapon firings shall be as specified below. DEFECT Premature Burst Non Functioning Duds Rever se Functioning WEAPON ZONE Non Functioning 105MM M102 7 Functioning 105MM M102 7 105MM M102 7 155MM M109A1 2 ACCEPT O O O 1 QUADRANT ELEVATION Low Low REJECT e 1 1 2* 2 TARGET
19、FUZE SETTING 1 Plywood SQ 115 Feet Ground SQ 1“ Plywood SQ SOO Feet Ground SQ SAMPLE SIZE 7 10* 5 10 * 10 Transportation Vibration Condition Fuzes * If only one dud occurs during the Functioning tests, repeat the Functioning tests with a second sample df 25 fuzes. If no additional duds occur, accept
20、 the lot. If any production lot fails to meet the above criteria, testing shall revert to 4.4.2.1 until three (3) consecutive lots have been accepted. 4.4.3 Lead Assembly Output Test. The lead assembly output test shall be performed using the appropriate test equipment and a one-eighth inch thick le
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILF48373A1984FUZEPOINTDETONATINGM739LOADINGASSEMBLINGANDPACKINGM739 装载 突起 引信 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-444688.html