ARMY MIL-F-48067-1972 FUZE ROCKET POINT DETONATING SQ AND DELAY M440 LOADING ASSEMBLING AND PACKING《M440装载弹突起爆超快和延时火箭弹引信 组装及包装》.pdf
《ARMY MIL-F-48067-1972 FUZE ROCKET POINT DETONATING SQ AND DELAY M440 LOADING ASSEMBLING AND PACKING《M440装载弹突起爆超快和延时火箭弹引信 组装及包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-F-48067-1972 FUZE ROCKET POINT DETONATING SQ AND DELAY M440 LOADING ASSEMBLING AND PACKING《M440装载弹突起爆超快和延时火箭弹引信 组装及包装》.pdf(11页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-F-3067 13 = 979970b 0315955 8 a - - - -3 7-1 9 MI L-F-48067 (MU) 1 AUGUST 1972 MILITARY SPECIFICATION FUZE, ROCKET: POINT DETONATING, SQ AND DELAY, M440 LOADING, ASSEMBLING AND PACKING 1. SCOPE 1.1 This speci fi cation covers the qual i ty assurance provi s ions and special requi rements not cov
2、ered by the drawings for a fuze designated as Fuze, Rocket: Point Detonating, SQ and Delay, M440. 2. APPL I CABLE DOCUMENTS 2.1 The following documents of the issue in effect on date of fnvi- tation for bids, or request for proposals, form a part of this specifica- tion to the extent speci fied here
3、i n. SPEC I FI CAT I ONS MI LI TARY MlL-E-14970 MU) - Explosive Conposition A5 MI L-P-45486 t MU) - Pel lets, RDX MIL-P-60412 (MU) - Packaging, Packing and Marking for Shipment of Artillery Type and Rocket Fuzes STAN DARDS MI LI TARY MIL-STD-105 by Attributes MI L-STD-1168 - Lot Nuheri ng of Ammuni
4、ti on MlL-STD-1235 - Single and Multi level Continuous Sampling Procedures and Tables for Inspection by At t ri bu tes - Sampling Procedures and Tables for inspection FSC: i340 r - . THIS DOCUMENT CONTAINS I I PAGES. Provided by IHSNot for ResaleNo reproduction or networking permitted without licens
5、e from IHS-,-,-MI L-F-48067 .(MU) DRAW I NGS ORDNANCE CORPS 9268198 - Fuze, Rocket: Point Detonating, SQ and Delay, M440 PUBLICATIONS ORDNANCE CORPS ET-9268198 - Equipment Tabulation (Copies of specifications, standards, drawings and publications required by suppl ers in connection wi th specific pr
6、ocurement functions should be obtained froin the procuring activity or as directed by the Contracting Officer.) 3. REQU I REMENTS draw req u spec 3.1 Material, - Materials shall be in accordance with applicable ngs and speci f cat ions. 3.2 Fuze Assembl . - The loaded fuze assembly shall comply with
7、 the remendon Drawing (dwg,) 9268198 .and with all requirements fled in applicable specifications. 3.3 s tion A5 pel lets chal 1 meet the requirements of MI L-P-45486 with the ex- ception that the composition of the Explosive Composition A5 shall be in accordance with MIL-E-14970. Booster ,and Boost
8、er Lead Pellets. - The RDX and Explosive Compo- 3.4 Booster Functioning. - The complete fuze (including live booster assembly) When armed and functioned chal 1 detonate high order. 3.5 Ballistic Firing. - The complete fuze (with live booster assembly) shall detonate after penetrating a bunker type t
9、arget. 3.6 Workmanchip. - The loading and assembly operations shall be per- formed in a thorough, workman1 ike manner consistent wi th the best practices of the industry. All parts and assemblies shall be free of dirt, grease, corrosion products and other foreign matter, not be injurious to any part
10、 nor shall the parts be contaminated by the cleaning agent. Surface coatings shall be continuous except for a few slight scratches not exposing base material, All requiredlmarkings shall -be neat and sharply defined. The cleaning method used shall Provided by IHSNot for ResaleNo reproduction or netw
11、orking permitted without license from IHS-,-,- MI L-F-48067 (MU) . 3.7 First Article Inspection. - This specification makes provisions for first article inspection. article samples by the contractor shall be as specified in the contract. Requi rements for the submission of first 4. QUALITY ASSURANCE
12、 PROVISIONS 4.1 Responsibility for Inspection. - Unless otherwise specified in the contract or purchase orde-r, the supplier is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract or order, the supplier may use his own or
13、any other faci 1 i ties sui table for the performance of the inspection requi rements specified herein, unless disapproved by the Government. The Government re- serves the right to perform any of the inspections set forth in the speci- fication where such inspections are deemed necessary to assure s
14、upplies and servi ces conform to prescribed requi remnts . 4.1.1 Submission of Product. - At the time each completed lot of items deliverable under the contract is submitted to the Government for acceptance. the contractor shall supply the fol lowing information accompanied by a cer- tificate which
15、attests that the information provided is correct and appli- cable to the product being submitted: a. A statement that .the lot complies with all of the quality assur- b. Drwing and specification number and date, together with identi- C. A statement that all material purchased by the contractor meets
16、 ance provisions specified in this specification. fication and date of changes thereto. requirements, when such material is contmlled by Government or commercial specifications referenced in any of the contractual documents, and that certi fi cates of conformance are on fi le and avai lable for revi
17、 ew. d. Number of items in the lot. e. Date submitted. - The certificate shall be signed by a responsible agent of the cert fying organization. The in tia1 certificate submitted shall be substant ated by evidence of the agents authority to bind his principal. Substant ation of the agents authority w
18、ill not be required with subsequent certificates unless, during the course of the contract, this authority is vested in another agent of the certifying organization. 4.1.2 Use of Simulated Defect Standards. - If automatic radiographic inspection equipment is used, it shall be validated hourly using
19、Design Agency approved standards contai ni ng simulated defects and supplied by the contractor. These standards should be representati ve of defects actually 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-F-48067 (MU). found or anticipated. Th
20、e contractor shall re-supply the i tem standards when it is determined by the Government that the standards are no longer representat i ve of the product. 4.1.3 Undetected Defect Standards. - Provis ions shal for the corrective action to be taken where the equipment a standard as a defective. Those
21、provisions shall include of all acceptable material subsequent to the last acceptab check as a minimum, 4.2 First Article Insbection be es tab 1 i shed ails to identify a re-inspection e veri fication 4.2.1 Submission. - The contractor shall submit a first article sample consistina of fifty (50) fuz
22、e assemblies (with live booster) to be subiected (with live booster) to be subjected to ballistic firing in the “Delay“ mode. This sample is submitted to a Government approved facility as designated by the Contracting Officer (see 6.4) for evaluation in accordance with the pro- visions of 4.2.2. All
23、 parts and materials shall be the sam as will be used in regular production and shall be obtained from the same source of supply. Prior to submission, the sample shall be inspected by the contractor to the degree necessary to assure that it conforms to the requirements of the con- tract . 4.2.2 Insp
24、ections to be Performed. - Each fuze assembly and component shall be subjected by the Government to any or all of the examinations or tests specified in 4,3.2 and 4.3.3 of this specification and any or all re- qui rements of the appl icable drawings. 4.2.3 Rejection of First Article Sample. - If any
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILF480671972FUZEROCKETPOINTDETONATINGSQANDDELAYM440LOADINGASSEMBLINGANDPACKINGM440 装载 突起 爆超快 延时

链接地址:http://www.mydoc123.com/p-444665.html