ARMY MIL-DTL-45468 F-2012 CAP BLASTING ELECTRIC - M6 PARTS FOR AND LOADING ASSEMBLING AND PACKING.pdf
《ARMY MIL-DTL-45468 F-2012 CAP BLASTING ELECTRIC - M6 PARTS FOR AND LOADING ASSEMBLING AND PACKING.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-DTL-45468 F-2012 CAP BLASTING ELECTRIC - M6 PARTS FOR AND LOADING ASSEMBLING AND PACKING.pdf(16页珍藏版)》请在麦多课文档分享上搜索。
1、 AMSC N/A FSC 1375 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. MIL-DTL-45468F(AR) 29 August 2012 SUPERSEDING MIL-C-45468E(AR) 13 January 1986 DETAIL SPECIFICATION CAP, BLASTING: ELECTRIC - M6 PARTS FOR, AND LOADING, ASSEMBLING AND PACKING This specification is a
2、pproved for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification covers the parts for, and loading, assembling and packing for one type of blasting cap designated as CAP, BLASTING: electric, M6. 2. APPLICABLE DOCUMENTS 2.1 General. The documents li
3、sted in this section are specified in sections 3 and 4 of this specification. This section does not include documents in other sections of this specification or recommended for additional information or as examples. While every effort has been made to ensure the completeness of this list, document u
4、sers are cautioned that they must meet all requirements documents cited in sections 3 and 4 of this specification, whether or not they are listed. 2.2 Government documents. 2.2.1 Specifications, standards, and handbooks. The following specifications, standards and handbooks form a part of this docum
5、ent to the extent specified herein. Unless otherwise specified, the issues of these documents are those specified in the solicitation or contract. Comments, suggestions, or questions on this document should be addressed to (Commander ARDEC, ATTN: Standardization RDAR-QES-E, Picatinny Arsenal, New Je
6、rsey 07806-5000) or emailed to ardecstdznconus.army.mil. Since contact information can change, you may want to verify the currency of this address information using the ASSIST Online database at https:/assist.dla.mil INCH-POUND Provided by IHSNot for ResaleNo reproduction or networking permitted wit
7、hout license from IHS-,-,-MIL-DTL-45468F(AR) 2 DEPARTMENT OF DEFENSE SPECIFICATIONS A-A-208 - Ink, Marking, Stencil, Opaque (Porous and Non-Porous Surfaces) A-A-59383 - Marking Media, Opaque (Porous and Non-Porous Surfaces) DEPARTMENT OF DEFENSE STANDARDS MIL-STD-650 - Explosive: Sampling, Inspectio
8、n and Testing MIL-STD-1168 - Ammunition Lot Numbering and Ammunition Data Card MIL-STD-1916 - DOD Preferred Method for Acceptance of Product (Copies of these documents are available online at https:/assist.dla.mil/quicksearch/ or from the Standardization Document Order Desk, 700 Robbins Avenue Bldg.
9、 4D, Philadelphia, PA 19111-5-94.) 2.2.2 Other Government documents, drawings and publications. The following other Government documents, drawings and publications form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those cited i
10、n the solicitation (see 6.2). Armament Research, Development and Engineering Center (ARDEC) DRAWINGS 8830953 - Cup 8830954 - Spool 8830971 - Plug Assembly (Rubber) 8830972 - Cap, Blasting, Electric, M6 Assembly 12913870 - Packing and Marking, For Box, Wirebound For Cap, Blasting, Electric, M6 129138
11、71 - Packing and Marking, For M19A1 Ammunition Box For Cap, Blasting, Electric, M6 (Application for copies of these drawings may be requested through email to Pica.Drawing.Requestconus.army.mil or from U.S. Army ARDEC, ATTN: RDAR-EIS-PE, Picatinny, NJ 07806-5000.) DEFENSE AMMUNITION CENTER DRAWINGS
12、19-48-4116/121Q - Unitization Procedures for Boxed Ammunition and Components on 4-way Entry Pallets (Copies of these drawings may be ordered online at https:/www3.dac.army.mil/DET/order/draworder.html or from Defense Ammunition Center, 1 Provided by IHSNot for ResaleNo reproduction or networking per
13、mitted without license from IHS-,-,-MIL-DTL-45468F(AR) 3 C Tree Road, Bldg. 35, McAlester, OK 74501.) 2.3 Non-Government publications. The following documents form a part of this document to the extent specified herein. ASTM INTERNATIONAL ASTM B 749 - Standard Specification for Lead and Alloy Strip,
14、 Sheet, and Plate Products (Copies of ASTM standards may be ordered online at http:/www.astm.org/ or from ASTM International, 100 Barr Harbor Drive, Conshohocken, PA 19428-2959.) 2.4 Order of precedence. In the event of a conflict between the text of this document and the references cited herein, th
15、e text of this document takes precedence. Nothing in this document, however, supercedes applicable laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 Required inspections. 3.1.1 First article. When specified, a sample shall be subjected to first article inspectio
16、n in accordance with 4.2. 3.1.2 Conformance. A sample shall be subjected to conformance inspection in accordance with 4.3. 3.2 Materials and parts. Materials and parts shall be in accordance with the drawings and specifications cited. 3.3 Assemblies. The assemblies shall comply with all requirements
17、 specified on 8830971 and 8830972. 3.4 Moisture content of the lead azide. The moisture content of the lead azide at the loading station, at the time of loading the blasting cap assemblies, shall be not greater than 0.50 percent. 3.5 Pull test of the lead wires. Lead wires shall not be separated fro
18、m the blasting cap when a pull force of 5 pounds (lbf) is exerted on each individual lead wire while the blasting cap is held stationary. 3.6 Resistance of bridge wire and wire leads. Resistance of blasting cap, including bridge wire and wire leads, shall be not greater than 1.76 ohms and not less t
19、han 1.44 ohms. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-45468F(AR) 4 3.7 No fire (critical). The M6 cap shall not be initiated by an electric current of not less than 0.20 Ampere and not greater than 0.21 Ampere for the duration of 5 s
20、econds. 3.8 Waterproofness. The M6 blasting cap shall function after submersion in water for not less than 4 hours at not less than 65F and not greater than 75F when the water is under a pressure of not less than 50 pounds per square inch (gauge). 3.9 Functioning. The M6 blasting cap shall be capabl
21、e of initiating high-order when tested in the following methods. 3.9.1 Ampere initiation of single cap. The M6 blasting cap shall be initiated when an electric DC current of not greater than 0.45 Ampere is applied to the lead wires for not greater than 50 milliseconds. 3.9.2 Milliwatt-second initiat
22、ion of single cap. The M6 blasting cap shall be initiated when electrical energy of not greater than 18.3 milliwatt-seconds and not less than 16.3 milliwatt-seconds is applied to the lead wires for not less than 10 milliseconds and not greater than 24 milliseconds. 3.9.3 Fire conditions for fifty (5
23、0) caps in series. Fifty (50) M6 blasting caps connected in series through the full lengths of their leads shall be initiated by the application of a current of not less than 1.40 and not greater than 1.60 Ampere for not less than 1.5 and not greater than 1.6 milliseconds. 3.9.4 Fire conditions for
24、four (4) caps in series. Four (4) M6 blasting caps connected in series through the full lengths of their leads shall be initiated by the application of electrical energy of not more than 0.3 Joule for not greater than 100 milliseconds. 3.10 Marking performance and durability. Performance and durabil
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILDTL45468F2012CAPBLASTINGELECTRICM6PARTSFORANDLOADINGASSEMBLINGANDPACKINGPDF

链接地址:http://www.mydoc123.com/p-444311.html