ARMY MIL-DTL-44484-1996 TRUSS ASSEMBLY PLATFORM TYPE V《V型装卸台扎》.pdf
《ARMY MIL-DTL-44484-1996 TRUSS ASSEMBLY PLATFORM TYPE V《V型装卸台扎》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-DTL-44484-1996 TRUSS ASSEMBLY PLATFORM TYPE V《V型装卸台扎》.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、I INCH-POUND 1 MIL-DTL-44484 28 MAY 1996 DETAIL SPECIFICATION TRUSS ASSEMBLY, PLATFORM, TYPE V This specification is approved for use by the Natick Research, Development, and Engineering Center, Department of the Army, and is available for use by all Departments and Agencies of the Department of Def
2、ense. 1. SCOPE 1.1 ScoDe. This specification covers 1 type of Truss Assembly used with the Type V Airdrop Platform. 1.2 Classification. The Trusses will be of the following sizes, and as specified (see 6.2). Type 1 - 12 Foot Type II - 16 Foot Type III - 20 Foot Type IV - 24 Foot Beneficial comments
3、(recommendations, additions, deletions) and any pertinent data which may be used in improving this document should be addressed to: U.S. Army Natick Research, Development, and Engineering Center, Natick, MA 01760-5017, by using the Standardization Document Improvement Proposal (DD Form 1426) appeari
4、ng at the end of this document or by letter. AMSC N/A FSC 1670 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Licensed by Information Handling ServicesMIL-DTL-44484 9999906 2039209 347 I * MIL-DTL-44484 2. APPLICABLE DOCUMENTS 2.1 General. The documents listed in t
5、his section are needed to meet the requirements specified in sections 3 and 4 of this specification. This section does not include documents cited in other sections of this specification or recommended for additional information or as examples. While every effort has been made to ensure the complete
6、ness of this list, document users are cutioned that they must meet all specifjed requirements documents cited in sections 3 and 4 of this specification, whether or not they .are listed. 2.2 Government documents 2.2.1 Other Government documents, drawinss, and rmblications. The following other Governm
7、ent documents, drawings, and publications form a part of this document to the extent specified herein. Unless otherwise specified, the issues are those cited in the solicitation. DRAWINGS U.S. ARMY NATICK RESEARCH, DEVELOPMENT, AND ENGINEERING CENTER 11-1-3600 - Truss Assembly Installation, Airdrop
8、(Copies of drawings are available from the U.S. Army Natick Research, Development, and Engineering Center, ATTN: SSCNC-MII, Natick, MA 01760-5017.) 2.3 Order of precedence. In the event of a conflict between the text of this document and the references cited herein, the text of this document takes p
9、recedence. Nothing in this document,however,supersedes applicable laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 First article. When specified(see 6.2), a sample shall be subjected to first article inspection in accordance with 4.2. 3.2 Materials. Materials a
10、nd components shall be as specified on Drawing 11-1-3600 and all subsidiary drawings and parts lists and as specified herein. It is encouraged that recycled material be used when practical as long as it meets the requirements of this specification. 2 Licensed by Information Handling Services MIL-DTL
11、-44484 m 9999906 2OL92LO O69 W MIL-DTL-44484 3.3 Construction. Assemblies and components shall be constructed in accordance with the requirements of the Drawing 11-1-3600 and all subsidiary drawings and parts lists. 3.4 WorkmanshiD. The end item shall conform to the quality of product established by
12、 this specification. All components and assemblies of the Truss Assembly shall be free of any rust or corrosion, dirt and other foreign matter. All surfaces shall be free from sharp edges or burrs. Components shall not be fractured, cracked, buckled, loose, dented, missing, malformed or misaligned.
13、4. VERIFICATION 4.1 Classification of inspections. The inspection requirements specified herein are classified as follows: a. First article inspection (see 4.2). b. Conformance inspection (see 4.3). 4.2 First article inspection. When a first article is required (see 3.1 and 6.2), it shall be examine
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILDTL444841996TRUSSASSEMBLYPLATFORMTYPEVV 装卸 PDF

链接地址:http://www.mydoc123.com/p-444296.html