ARMY MIL-DTL-44481 A-1996 RELEASE CARGO PARACHUTE AIRDROP M-3《M-3空投货物降落伞释放》.pdf
《ARMY MIL-DTL-44481 A-1996 RELEASE CARGO PARACHUTE AIRDROP M-3《M-3空投货物降落伞释放》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-DTL-44481 A-1996 RELEASE CARGO PARACHUTE AIRDROP M-3《M-3空投货物降落伞释放》.pdf(11页珍藏版)》请在麦多课文档分享上搜索。
1、 MIL-DTL-4448LA - 9999906 2OL79Lb O79 INCH-POUND MIL-DTL-44481A 15 MAY 1996 SUPERSEDING MIL-R-44481 18 July 1994 DETAIL SPECIFICATION RELEASE, CARGO PARACHUTE, AIRDROP, M-3 This specification is approved for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 ScoDe. This d
2、ocument covers one type of cargo parachute release assembly consisting of a release mechanism, upper and lower suspension link assemblies, parachute connector assemblies and a timer assembly. The parachute connector assembly, timer assembly and rope spool assembly may be procured separately (see 6.4
3、). Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be used in improving this document should be addressed to: U.S. Army Natick Research, Development, Engineering Center, Attn: SSCNC-UTE, Natick, MA 01760-5017 by using the Standardization Document Improvem
4、ent Proposal (DD form 1426) appearing at the end of this document or by letter. AMSC N/A FSC 1670 DISTRIBUTION STATEMENT. Approved for public release; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-. MIL-DTL-44481 2. APPLI
5、CABLE DOCUMENTS 2.1. General. The documents listed in this section are specified in sections 3 and 4 of this specification. This section does not include documents cited in other sections of this specification or recommended for additional information or examples. While every effort has been made to
6、 ensure the completeness of this list, document users are cautioned that they must meet all specified requirements documents cited in sections 3 and 4 of this specification, whether or not they are listed. 2.2 Government documents. 2.2.1 Other Government documents, drawinss, and mblications. The fol
7、lowing other Government documents, drawings and publications form a part of this document to the extent specified herein. Unless otherwise specified, the issues are those cited in the solicitation. DRAWINGS U.S ARMY NATICK RESEARCH, DEVELOPMENT AND ENGINEERING CENTER 11-1-3220 - Release Assembly, Ca
8、rgo, Parachute, Airdrop, M-3 11-1-3230 - Spool Assembly, Rope 11-1-3236 - Toggle 11-1-3240 - Connector Assembly, Parachute 11-1-3246 - Housing, Front and Rear (Casting) 11-1-3250 - Timer Assembly, Parachute (Copies of drawings are available from the U.S.Army Natick Research, Development and Engineer
9、ing Center, ATTN: SSCNC-IMD, Natick,MA 01760-5017). 2.3 Non-Government rmblications. The following documents form a part of this document to the extent specified herein. Unless otherwise specified, the issues of the documents which are DOD adopted are those listed in the issue of the DODISS cited in
10、 the . solicitation. Unless otherwise specified, the issues of documents not listed in the DODISS are the issues of the documents cited in the solicitation (see 6.3). 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-44481A 9999906 2017918 94
11、1 MIL-DTL-44481 AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) ANSI B46.1 - Surface Texture (Surface roughness, Waviness, and Lay 1 (Applications for copies should be addressed to the American National Standards Institute, Inc. 11 West 42nd Street, New York, NY 10036.) AMERICAN SOCIETY FOR TESTING AND
12、 MATERIALS (ASTM) ASTM E 1444 Standard Practice for Magnetic Particle Examination (Applications for copies should be addressed to the American Society for Testing and Materials, 1916 Race Street, Philadelphia, PA 19103-1187.) (Non-Government standards and other publications are normally available fr
13、om organizations that prepare or distribute the documents. These documents also may be available in or through libraries or other informational services.) 2.4 Order of precedence. In the event of a conflict between the text of this document and the references cited herein, the text of this document
14、takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 First article. When specified (see 6.2), a sample shall be subjected to first article inspection (see 4.1) in accordance with 4.2. .3.2 M
15、aterial. The contractor shall select the material, but the material shall be capable of meeting all of the operational and environmental requirements specified herein. The material specified on Drawing 11-1-3220, and all subsidiary drawings and parts lists pertaining thereto, is recommended, but is
16、not mandatory. 3.3 Construction and supplementary process. The construction and supplementary process used in tha manufacture of the cargo parachute releases shall conform to the requirements specified or shown on drawing 11-1-3220, and all subsidiary drawings and parts lists pertaining thereto, and
17、 as specified herein. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-DTL-44481A 9999906 2017919 488 MIL-DTL-44481 3.4 Surface finish. American National Standards Institute (ANSI) Standard No. B46.1, shall apply for the interpretation of surfa
18、ce roughness values specified on the applicable drawings. 3.5 Performance. 3.5.1 Carso parachute connector ziroofload. The cargo parachute connector shall show no visual evidence of failure (such as a fracture or permanent deformation) when subjected to a tensile proofload of 45,000 pounds for 15 se
19、conds when tested as described in 4.12.3. 3.5.2 Release assemblv ziroofload. The release assembly shall show no visual evidence of failure (such as a fracture or permanent deformation) when subjected to a tensile proofload of 135,000 pounds for 15 seconds when tested as described in 4.11.4. 3.5.3 Re
20、lease assemblv unlockinq. At completion of the timer unwinding cycle, the timer shall retract the toggle lock slides to the unlocked position with no evidence of interference when tested as specified in 4.11.4. 3-5.4 Release assembly, functional. The release assembly shall show no evidence of interf
21、erence when subjected to the no load testing as specified in 4.11.5. 3.5.5 Delav timins cycle. The delay timing cycle shall be 25 seconds,plus or minus 3 seconds, from start to completion. There shall be no evidence of interference in retracting the toggle lock slides to the unlocked position after
22、completion of the unwinding cycle when tested as specified in 4.11.1. 3.5.6 Delav timer retraction arms. When functionally tested as specified in 4.11.2, the retraction arms shall rotate through an angle of 23 degrees during the timing cycle. At completion of the timing cycle, the arms shall retract
23、 to the unwound position, tangent to the timer housing surface. Suggested reference drawing 11-1-3250 indicates the position and tolerances of the retraction arms movement. 3.5.7 Government furnished DroDertv. The following items, when required for proofload testing of the release assembly, separate
24、ly procured cargo parachute connectors or timer assemblies, may be obtained from the procuring activity on a loan basis (see 6.3). Release, Cargo Parachute, Airdrop, M-3; Part No, 11-1-3220-1 Timer Assembly; Part No. 11-1-3250-1 4 Provided by IHSNot for ResaleNo reproduction or networking permitted
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILDTL44481A1996RELEASECARGOPARACHUTEAIRDROPM3M3 空投 货物 降落伞 释放 PDF

链接地址:http://www.mydoc123.com/p-444294.html