ARMY MIL-DTL-10058 J-2010 SIMULATOR PROJECTILE GROUND BURST M115A2《M115A2型地面爆炸射弹模拟弹》.pdf
《ARMY MIL-DTL-10058 J-2010 SIMULATOR PROJECTILE GROUND BURST M115A2《M115A2型地面爆炸射弹模拟弹》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-DTL-10058 J-2010 SIMULATOR PROJECTILE GROUND BURST M115A2《M115A2型地面爆炸射弹模拟弹》.pdf(33页珍藏版)》请在麦多课文档分享上搜索。
1、 INCH-POUND MIL-DTL-10058J 10 June 2010 SUPERSEDING MIL-S-10058H (AR) 3 February 1982 DETAIL SPECIFICATION SIMULATOR, PROJECTILE, GROUND BURST M115A2 This specification is approved for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification describes
2、the parts, assembly and verification methods for the Simulator, Projectile, Ground Burst: M115A2. 2. APPLICABLE DOCUMENTS 2.1 General. The documents listed in this section are specified in section 3 or 4 of this specification. This section does not include documents cited in other sections of this s
3、pecification or recommended for additional information or as examples. While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet all specified requirements of documents cited in sections 3 or 4 of this specification whether or not they
4、 are listed. AMSC N/A FSC 1370 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Comments, suggestions, or questions on this document should be addressed to the Commander, U.S. Army ARDEC, ATTN: RDAR-QES-E, Picatinny Arsenal, NJ 07806-5000 or emailed to ardecstdznconu
5、s.army.mil. Since contact information can change, you may want to verify the currency of this address information using the ASSIST Online at https:/assist.daps.dla.mil. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-10058J 2 2.2 Government d
6、ocuments. 2.2.1 Specifications, standards, and handbooks. The following specifications, standards, and handbooks form a part of this document to the extent herein. Unless otherwise specified, the issues of these documents are those cited in the solicitation or contract. DEPARTMENT OF DEFENSE SPECIFI
7、CATIONS MIL-I-12597 - Igniter, Blasting fuze, friction type, M3A1 Loading, Asembly and Packing MIL-P-48239 - Powder, Flash DEPARTMENT OF DEFENSE STANDARDS MIL-STD-286 - Propellants, Solid: Sampling, Examination and Testing MIL-STD-331 - Fuze and fuze Components, Environmental and Performance Tests F
8、or MIL-STD-1168 - Lot Numbering of Ammunition MIL-STD-1916 - DOD Preferred Methods for Acceptance of Product (Copies of these documents are available on line at https:/assist.daps.dla.mil/quicksearch/ or from the Standardization Document Order Desk, 700 Robbins Avenue, Building 4D, Philadelphia, PA
9、19111-5094.) 2.2.2 Other Government documents, drawings, and publications. The following other Government documents, drawings and publications form part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those cited in the solicitation or c
10、ontract. DRAWINGS US ARMY ARMAMENT RESEARCH, DEVELOPMENT, AND ENGINEERING CENTER (ARDEC) PRODUCT DRAWINGS 7549218 - Sleeve 7549227 - Whistle Loading Assembly 7549229 - Outer Tube 7549232 - Spacer Tube 7549233 - Cover Assembly Provided by IHSNot for ResaleNo reproduction or networking permitted witho
11、ut license from IHS-,-,-MIL-DTL-10058J 3 7549234 - Inner Tube 7549235 - Whistle and Cover Assembly 7549246 - Simulator, Projectile, Ground Burst, M115A2, Assembly 8833721 - Igniter, Blasting Fuze, Friction Type, M3A1 Assembly 8865588 - Charge Loading Assembly 9345134 - Safety Fuze Cord 9345136 - Cha
12、rge Loading Assemble, Alternate 9345140 - Whistle and Cover Assembly, Alternate 12972326 - Flash Composition 13019989 - Flash Composition 13020526 - Charge Loading Assembly INSPECTION DRAWINGS 9200454 - Launcher (Copies of these drawings maybe requested online at pica.drawing.requestconus.army.mil o
13、r from US Army ARDEC, ATTN: RDAR-EIS-PE, Picatinny Arsenal, NJ 07806-5000.) 2.3 Non-Government publications. The following documents form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those cited in the solicitation or contract.
14、 NON-GOVERNMENT STANDARDS ISO 10070 - Determination of envelope-specific surface area From measurements of the permeability to air of a Powder bed under steady-state flow conditions (Copies of this document are available from www.iso.org or International Organization for Standardization Case Postale
15、 56, CH-1211 Geneve 20, Switzerland) 2.4 Order of precedence. Unless otherwise noted herein or in the contract, in the even of a conflict between the text of this document and the references cited herein (except for related specification sheets), the text of this document takes precedence. Nothing i
16、n this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 Requirement inspections. 3.1.1 First article. When specified, a sample shall be subjected to first article inspection in accordance with 4.2. 3.1.2 Conformance. All
17、 materials, components and assemblies shall be in accordance with the requirements in the drawing listed in paragraphs 4.3.2.1 4.3.2.13. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-10058J 4 3.2 Components and assemblies. All materials, co
18、mponents and assemblies shall be in accordance with the requirements on the drawing listed in paragraphs 4.3.2.1 4.3.2.13. 3.2.1 Inner tube. The inner tube material and dimensions shall be in accordance with 7549234 . 3.2.2 Outer tube. The outer tube material and dimensions shall be in accordance wi
19、th 7549229. 3.2.3 Sleeve. The sleeve material and dimensions shall be in accordance with 7549218. 3.2.4 Spacer tube. The spacer tube material and dimensions shall be in accordance with 7549232. 3.2.5 Whistle loading assembly. The whistle loading assemble shall be in accordance with 7549227. 3.2.6 Co
20、ver assembly. The cover assembly shall be in accordance with 7549233. 3.2.7 Whistle and cover assembly. The whistle and cover assembly shall be in accordance with 7549235. 3.2.8 Charge loading assembly, prior to sealing cup assembly. The charge loading assembly, prior to sealing cup assembly shall b
21、e assembled in accordance with 12972326 or 13019989. 3.2.9 Charge loading assembly (BP-A1). The cover and body loading assembly for part number 7549246-1, NSN 1370-01-557-8527 shall be in accordance with 8865588. 3.2.10 Charge loading assembly (A1-KP). The cover and body loading assembly for part nu
22、mber 7549246-2, NSN 1370-00-752-8126 shall be in accordance with 13020526. 3.2.11 Assembly, prior to assembly of disc and washer assembly. The assembly, prior to assembly of disc and washer assembly shall be assembled in accordance with 7549246. 3.2.12 Assembly. The assembly shall be in accordance w
23、ith 7549246. 3.2.12.1 Outer tube wrinkles. The outer tube shall be free of cuts, holes, tears or wrinkles with the exception that wrinkles in the outer tube within one-half (0.5) inch of the crimp shall be acceptable provided there are no cuts, holes or tears to the tube. 3.2.13 M3A1 igniter assembl
24、y The M3A1 igniter assembly shall be in accordance with 8833721. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-10058J 5 3.2.14 Safety fuze cord. The fuze assembly material and dimensions shall be in accordance with 9345134. 3.2.14.1 Burning
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILDTL10058J2010SIMULATORPROJECTILEGROUNDBURSTM115A2M115A2 地面 爆炸 模拟 PDF

链接地址:http://www.mydoc123.com/p-442618.html