ARMY MIL-D-70603-1986 DETONATOR STAB PA523 LOADING ASSEMBLING AND PACKING《PA523型针刺雷管的装载 组装及包装》.pdf
《ARMY MIL-D-70603-1986 DETONATOR STAB PA523 LOADING ASSEMBLING AND PACKING《PA523型针刺雷管的装载 组装及包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-D-70603-1986 DETONATOR STAB PA523 LOADING ASSEMBLING AND PACKING《PA523型针刺雷管的装载 组装及包装》.pdf(22页珍藏版)》请在麦多课文档分享上搜索。
1、c MIL-D-30b03 13 m 77977Ob 035b010 I I 3- 3-7- iq MIL-D-70603 (AR) 6 June 1986 MIL I TARY SPEC I FIC AT ION DETONATOR, STAB, PA 523 LOADING, ASSEMBLING, AND PACKING This Specification is approved for use within the U.S. Army Armament Munitions and Chemical Command, and is available for use by all De
2、partments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification covers quality assurance provisions and preparation for delivery for the loading and assembling of Detonator, Stab, PA523. 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications and standards.
3、 The following specifications and standards form a part of this specification to the extent specified herein. Unless otherwise specified, the issues of these documents shall be those listed in the issue of the Department of Defense Index of Specifications and Standards (DoDISS) and supplement theret
4、o, listed in the solicitation. SPEC I FIC AT IONS MILITARY MIL-P-116 - Preservation, Methods of. MIL-A-2550 - Ammunition and Special Weapons, General Specifications for. MIL-1-48078- Ammunition, Standard Quality Assurance Provisions, General Specification for. Beneficial comments (recommendations, a
5、dditions. deletions) and any pertinent data which may be of use in improv- ing this document should be addressed to: Commander, U.S. Army Armament Research. Development and Engineer- ing Center, Aftn: AMSMC-QA, Dover, New Jersey 07801-5001 by using the self-addressed Standardization Document Improve
6、ment Proposal (DD Form 1426) appearing at the end of this document or by letter. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- - - -5 - MIL-D-70603 13 7777906 0356033 3 E MIL-D-70603 (AR) STANDARDS MIL ITARY MIL-STD-105 - Sampling Procedures and T
7、ables or MIL-STD-650 - Explosive: Sampling, Inspection, and MIL-STD-1235- Continuous Sampling Procedures and Table Inspection by Attributes. Testing . or Inspection by Attributes (Copies o specifications, standardsr drawings , publications, and other Government documents required by the suppliers in
8、 connection with specific procurement functions should be obtained from the procuring activity or as directed by the Contracting Officer .) I U 2.1.2 Other Government documents, drawinqs, and ublicatlons. The following other Government documents drawings, znd publications form a part of this specifi
9、cation to the extent specified herein, Unless otherwise specified, the issues shall be those in effect on the date of the solicitation. DRAWINGS US ARMY ARMAMENT RESEARCH, DEVELOPMENT AND ENGINEERING CENTER ( ARDEC ) 7548099 - 7548103 - 7548104 - 9358084 - P UB LE CATI ONS Box, Packing, Ammunition f
10、or Detonators. Box, Set-up, Packing, Ammunition, Outer for Boosters , Detonators , or Primers , Assembly, Details, Packing and Mar king Box, Set-up, Packing, Ammunition, Inner for Boosters, Detonators and Primers. Assembly Detailed Packing and Marking. Detonator Stab, PA523 Loading Assemby 4.9 CFR 1
11、00-199 Code of Federal Regulations (The Code of Federal Regulations is available from the Superintendent of Documents, US Government Printing Office, Washington, DC 20402. Orders should specify “49 CFR 100-199 (i. at es t revi si on) I .) 2.2 Order of precedence. In the event of a conflict between t
12、he text of this specification and the references cited herein, the text of this specification shall take precedence. Nothing in this specification, however , shalL supersede applicable laws and regulations unless a specific exemption has been obtained, 2 Provided by IHSNot for ResaleNo reproduction
13、or networking permitted without license from IHS-,-,-MIL-D-70603 13 m 7777706 03.56032 5 m a a a ,- MIL-D-70603 (AR) 3 REQUIREMENTS 3.1 Material. Materials and parts shall be in accordance with applicable drawings, specifications and standards. 3.2 Loadinq assembly. The loading assembly shall comply
14、 with all requirements specified on Drawing (Dwg.) 9358084, all associated drawings and with all requirements specified in applicable spcifications and standards. lead azide used in loading the detonator shall not exceed 0.50 percent when tested as specified in 4.5.1. 3.3 Moisture content of lead az
15、ide. The moisture content of 3,4 Moisture content of primer mixture. The moisture content of the primer mixture used in loading the detonator shall not exceed 0.30 percent when tested as specified in 4.5.3. 3.5 Functioning. 3.5.1 Sensitivity. The detonator shall function on the first attempt and sha
16、ll cause perforation of a 0.1345 inch thick lead disc, to a diameter of not less than 0.3125 inch when tested as specified in 4.5.5.1. 3.5.2 Waterproofness . The detonator shall comply with the requirements of 3.5.1 after being submerged in water to a minimum depth of 2 inches for not less than 48 h
17、ours at a temperature of 700F plus or minus 100, when tested as specified in 4.5.5.2. 3.6 Binder-lubricant content of RDX. The total binder-lubricant, calcium resinate and graphite content of the RDX shall be determined for each lot at the time of loading as specified in 4.5.2. 3.7 Primer mixture co
18、mposition. The composition of the primer mixture shall be determined for each batch or blend of batches at the time of loading as specified in 4.5.4. 3.8 Heat seal test of sealed baq. Sealed barrier bag shall be tested as specified in 4.5.6. 3.9 First article inspection. This specification contains
19、technical provisions for first article inspection. the submission of first article samples by the contractor shall be as specified in the contract. Requirements for 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-70603 (AR) 3.10 Workmanship.
20、All parts and assemblies shall be fabricated and loaded in a thorough workmanlike manner and all manufacturing, processing They shall be clean and free of cracks, gouges, burrs, sharp edges, unblended radii, surface defects, chips, dirt, grease and oil (except where specifically required), corrosion
21、 products and other foreign matter. The cleaning method used shall not be injurious to any part or assembly, nor shall they be contaminated by the cleaning agents. Exterior surface coatings shall be continuous except for a few light scratches not exposing base material. neat and sharply defined. All
22、 packing shall be dry. and assembly operations shall be correctly performed. All required markings shall be 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection and standard quality assurance provisions. the provisions of MIL-A-48078 shall apply and are hereby made a part of this detail
23、 specification. requirements of se-ctions 3 and 5. inspection system or quality program. requirements in the specification shall not relieve the contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the c
24、ontract. not authorize submission of known defective material, either indicated or actual, nor does it commit the Government to acceptance of defective material. 4.2 Classif icabion of inspections. The inspection requirements Unless otherwise specified herein or in the contract, 4.1.1 Responsibility
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILD706031986DETONATORSTABPA523LOADINGASSEMBLINGANDPACKINGPA523 针刺 雷管 装载 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-442611.html