ARMY MIL-D-48221-1973 DETONATOR ELECTRIC M95 (T61) PARTS FOR LOADING ASSEMBLING AND PACKING《电雷管M95(T61)零件的装载 组装和包装》.pdf
《ARMY MIL-D-48221-1973 DETONATOR ELECTRIC M95 (T61) PARTS FOR LOADING ASSEMBLING AND PACKING《电雷管M95(T61)零件的装载 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-D-48221-1973 DETONATOR ELECTRIC M95 (T61) PARTS FOR LOADING ASSEMBLING AND PACKING《电雷管M95(T61)零件的装载 组装和包装》.pdf(20页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-D-48221 (MU) 11 June 1973 (see 6.9) M I L I T ARY S PE C I F I CAT I ON 1 DETONATOR ELECTRIC M95 (T61) PARTS FOR LOADING, ASSEMBLING, AND PACKING 1. SCOPE 1.1 This specification covers the inspection of the parts and the loading, assembling and packing for one type of electric detonator designat
2、ed as the M95 Electric Deton- ator. 2. APPL I CABLE DOCUMENTS 21. The following documents of the issue in effect on date of invitation for bids, or request for proposal , form . a part of this specification to the extent specified herein. SPEC I FI CAT IONS FEDERAL TT-1-559 - Ink, Marking, Stencil,
3、Opaque, for Porous Surfaces, Wood Boxes, Fi ber Cartons, etc. MILITARY MIL-P-116 MIL-B-Il- - Bags, Interior Packaging MIL-A-148 - Aluminum Foil MIL-A-2550 - Ammunition and Special Weapons, - Packaging and Packing for Overseas Shipment General Specificatian For STAN DARDS t.1 I L I TARY E1IL-STD-105
4、- Sampl ing Procedures and Tables for MIL-STD-109 - Quality Assurance Terms and Definitions Inspect ion by Attributes (ABC-STD-105) Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-DRAV U MIL-STB-Il67 - Ammunition Data Cards MIL-STD-1168 Mlb-STD-1235
5、- Single and Multilevel Continuous - Lot Numbering of Aimuni tion Sampling Procedures and Tables for Inspection by Attributes N GS 5. ARMY MUMITIOMS COMISAND 8816368 - Disc, head 8871907 - Holder, Assembly 8873302 - Operating Instructions 9200356 - Set-up functioning 9200602 - Bushing 9200657 - Disc
6、 cantering 920589 1 - Detonator, E 1 ect r i c , M95 Assemb ly (Copies of specifications, standards, drawings and publications required by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed.by the contracting officer). 2.2 Other
7、Publications. - The following part of this specification to the extent spec less otherwise indicated, the issue in effect tation for bids or request for proposals shal CODE OF FEDERAL REGULAT I ONS documents form a fied herein. Un- on date of invi- apply Title 49 - Transportation, Parts 171-179 (The
8、 code of Federal Regulations is avai lable from the Superintendent of Documents, Government Printing Office, Washington, 25, O.C. 20402. Orders shall specify 49 CFR 171-179 (latest revision). 3. REQU I REMENTS 3.1 Material. - Materials and parts shall be in accordance with applicable drawings and sp
9、ecifications. 3.2 Detonators. - The detonators shall comply with all re- quirements specified on Drawing (dwg, 9205891, and with all require- ments specified in applicable specifications. 3.3 Moisture content. 2 -. . ._ Provided by IHSNot for ResaleNo reproduction or networking permitted without lic
10、ense from IHS-,-,-3.6 Functioning. - The detonators shall comply with the fol lowing: 3.6.1 Time. - The detonators shall fire on the first at- tempt within 50 microseconds. attempt and shall make a 3/16 inch minimum (min.) perforation in a .1345 inch thick lead disc. 3.6.2 Output. - The detonators s
11、hall fire on the first IL-D-48221 13 W 7977706 0317597 3 U MI L-D-48221 (MU) 3.3.1 Lead azide. - The moisture content of the lead azide at the loading station at the time of loading the det- onator shall not exceed 0.50 percent. 3.3.2 PETN. - The moisture content of the PETN at the loading station a
12、t the time of loading the detonators shall not exceed O. 50 pe rcen t. 3.4 Resistance between shorted lead wires and cup. - The resistance between the shorted lead wires and the cup shall be not less than 50 megohms. 3.5 Waterproofness. - The detonator chal 1 be waterproof as evidenced by normal fun
13、ctioning after being immersed in water maintained at a temperature of 70 degrees Fahrenheit (F.) plus or minus 10 degrees F. for a period of 48 hours, minimum, at a depth of 2 to 3 inches. 3.6.3 Duds. - The detonators shall not fail to fire on the first attempt. 3.7 Workmanship. - All parts and asse
14、mblies shall be fab- ricated and loaded in a thorough, workmanlike manner. They sha be free of burrs, chips, sharp edges, cracks, surface defects, dirt, grease, rust, corrosion products and other foreign matter The cleaning method used shall not be injurious to any part nor shall the parts be contam
15、inated by the cleaning agent. All re- quired markings shall be neat and sharply defined. 3.8 First article inspection. - This specification makes provisions for first article inspection. Requirements for the submission of first article samples by the contractor shall be as specified in the contract.
16、 3 7 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MI L-D-48221 (MU) 4 e QUAL I TY ASSURANCE PROV 1 S I QNS 4.1 Responsibility for Inspection. - Unless othevwise specified in the contract or purchase order, the supplier is responsible for the perfo
17、rmance of al 1 inspection requirements as specified herein. Except as otherwise specified in the con- tract or order, the supplier may use hic wn or any other faci li ties sui table for the performance of the inspection re- quirements specified herein, unless disapproved by the Govern- ment. The Gov
18、ernment reserves the right to perform any of the inspections set forth in the Specification where such inspec- tions are deemed necessary to assure supplies and services conform to prescribed requi rements. Reference chal 1 be made to Standard MIL-STD-109 to define terms used herein. The pro- vision
19、s of MIL-A-2550 shall apply. . 4.1.1 Submission of Product. - At the time each completed lot of i tem deliverable under the contract is submitted to the Government for acceptance, the contractor shall supply the fol- lowing information accompanied by a certificate which attests that the information
20、provided is correct and applicable to the product be i ng s ubmi t ted : a. A statement that the lot complies with all of the quality assurance provisions specified in this specification. b. Drawing and specification number and date, together with an identification and date of changes thereto. c. A
21、statement that all material purchased by the con- tractor meets requirements, when such material is controlled by Government or commercial speci fi cations referenced i n any of the contractual documents, and that certificates of conformance are on file and available for review, except that a statem
22、ent of findings for the misture content of each explosive shall be submi tted with each lot submitted for acceptance. d. Number of items in the lot. e. Date submi tted. The certificate shall be signed by a responsible agent of the cerfitying organization. The initial certificate submitted shall be s
23、ubstantiated by evidence of the agents authority to bind his principal Substantiation of the agents authority wi 11 not be required with subsequent certificates unless, during the course of the contract, this authority is vested in another agent of the cert i fy i ng organ zat ion. 4 Provided by IHS
24、Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-I MIL-D-8221 33 W 9977706 03375i.17 7 m 4.2 First Article Inspection 4.2.1 Submission. - The contractor shall submit a first article sample as designated by the Contractinq Officer for evaluation as specified herein.
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILD482211973DETONATORELECTRICM95T61PARTSFORLOADINGASSEMBLINGANDPACKING 雷管 M95T61 零件 装载 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-442430.html