ARMY MIL-D-46282-1960 DETONATOR STAB M23 LOADING ASSEMBLING AND PACKING《M23型针刺雷管的装载 组装和包装》.pdf
《ARMY MIL-D-46282-1960 DETONATOR STAB M23 LOADING ASSEMBLING AND PACKING《M23型针刺雷管的装载 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-D-46282-1960 DETONATOR STAB M23 LOADING ASSEMBLING AND PACKING《M23型针刺雷管的装载 组装和包装》.pdf(11页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-D-46282 (Ord) 8 September 1960 MILITARY SPECIFICATION DETONATOR, STAB, M23 LOADING, ASSEMBLING AND PACKING , 1. SCOPE 1.1 This specification covers the loading, assembling and packing for one type of stab i detonator designated as Detonator, M23. 2. APPLICABLE DOCUMENTS 2.1 The following documen
2、ts of the issue in effect on date of invitation for bids form a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY MIL-G2550 - General Specification for Ammunition Ekcept Small Arms Ammunit ion. STANDARDS RizILITARY MIL-STD-105 - Sampling Procedures and Tables for Ins
3、pection by Attributes. MIL-STD-109 - Inspection Terms and Definitions. DRAWINGS ORDNANCE CORPS 7548239 - Detonator, M23, Loading Assembly. 7548103 - Box, Set-up, Packing, Ammunition, Outer for Boosters, Detonators 7548104 - Box, Set-up, Packing, Ammunition, Inner, For Boosters, Detona- 7548100 - Box
4、, Packing, Ammunition, for Detonators. or Primers. Assembly, Details, Packing and Marking. tors and Primers, Assembly, Details, Packing and Marking. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-46282 (Ord) PUBLICATIONS ORDNANCE CORPS ORD-M60
5、8-11 - Procedures and Tables for Continuous Sampling by Attributes. IEL-7153523 - Index of Inspection Equipment Lists. (Copies of specifications, standards, drawings and publications required by contractors in connection with specific procurement functions should be obtained from the procuring activ
6、ity or as directed by the contracting officer). 2.2 Other publications. - The following document forms a part of this specification to the extent specified herein. Unless otherwise indicated, the issue in effect on date of invita- tion for bids shall apply. CODE OF FEDERAL REGULATIONS 49 CFR 71-78 -
7、 Interstate Commerce Commission Rules and Regulations for the Transportation of Explosives and Other Dangerous Articles, (The Interstate Commerce Commission Regulations are now a part of the Code of Federal Regulations (1949 Edition and revisions) available from the Superintendent of Documents, Gove
8、rnment Printing Office, Washington 25, D. C. Orders for the above publication should cite “49 CFR 71-78 (latest revision). If 3. REQUIREMENTS 3.1 Material. - Materials shall be in accordance with applicable drawings and specifications. 3.2 Detonators, - The detonators shall comply with all requireme
9、nts specified on Drawing (dwg. ) 7548239 and with all requirements specified in applicable specifications. 3.3 Moisture content of lead azide, - The moisture content of the lead azide used in loading the detonators shall not exceed O. 50 percent when tested as specified in 4.3.2. 3.4 Moisture conten
10、t of primer mixture. - The moisture content .of the primer mixture used in loading. the detonators shall not exceed O. 30 percent when tested as specified in 4.3.3. I 3.5 Functioning, 3.5.1 Sensitivity, - The detonators shall function on the first attempt and shall cause I perforation of the lead di
11、sc, to a diameter of not less than one eighth inch when tested as specified in 4.3.5.1. I 3.5.2 Waterproofness. - The detonators shall be waterproof as evidence by normal functioning when tested as specified in 4.3.5.2. I . . rt i 1 1 . . ,- Provided by IHSNot for ResaleNo reproduction or networking
12、 permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-gb282 33 9999906 0330755 8 MlL-D-46282 (Ord) 4.2 Inspectio
13、n provisions. 4.2.1 Lot formation. - A lot shall consist of detonators produced by one manufacturer in one unchanged process in accordance with the same drawing, same drawing revision, same specification, and same specification revision, Drawing, specification and process changes not affecting perfo
14、rmance, safety or fit, as determined by the Government, shall not be cause for changing the lot number. Each lot shall contain: Parts of one interfix lot number from one manufacturer. Lead azide from not more than one lot. , a. b, c. d. Primer mixture from one batch or blending of batches that resul
15、ts in homogeneity of all primer mixture used in loading the entire detonator lot. Tetryl from not more than one lot. 4.2.2 Ekamination. - Sampling plans and procedures for the following classifications of defects shall be in accordance with Standard MIL-STD-105 except that inspection for crit- ical
16、defects, when listed, shall be 100 percent. Continuous sampling plans in accordance with Handbook ORD-M608-11 may be used if approved by the procuring activity. Also, at the option of the procuring activiw, AQLs and sampling plans may be applied to the indi- vidual characteristics listed using an AQ
17、L of O. 25 percent for each major defect and an AQL of O. 40 percent for each minor defect. Equipment necessary for the performance of the in- spections listed shall be in accordance with 4.2.4. 4.2.2.1 Assembly, prior to loading (see dwg. 7548239). Categories Defects Critical: None defined Method o
18、f inspection Major: AQL O. 25 percent 101. Coating compound or lacquer on exposed surface ofdisc . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Visual Minor : AQL O. 40 percent 201. Evidence of poor workmanship (see 3.6) . . . . . . . . . . . Visual 4.2.2.2 Assembly (see dwg. 754823
19、9). Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-46282 13 m 797770b 03L075b T MIL-D-46282 (Ord) Major: AQL O. 65 percent 101. Length Gage 102. Diameter . Gage 103. Disc loose Manual 104. Disc punctured or torn Visual 105. Color or lacquer in
20、correct (both ends) . Visual 106. Not crimped full 360 degrees (O) . Visual Minor: AQL O. 40 percent 201. Evidence of poor workmanship (see 3.6) 4.2.2.3 Box, Set-up, packing, ammunition, inner (see dwg. 7548104). Visual Categories Defects Method of inspection Critical: None defined Major: AQL O. 25
21、percent 101. Box damaged exposing contents . . , . . , , , , , , , , , . , . . Visual 102. Label missing or incorrect . Visual Minor: None defined 4.2.2.4 Box, Set-up, packing, ammunition, outer (see dwg. 7548103). Categories Defects Method of insDection Critical: None defined Major: AQL O. 25 perce
22、nt 101. Barrier bag damaged . Visual 102. Label missing or incorrect . Visual Minor: None defined 4.2.2.5 Box, packing, ammunition, for detonators (see dwg. 7548100). Categories Defects Method of inspection Critical: None defined Major: AQL 0.40 percent 101. Box damaged . Visual 103. Strapping missi
23、ng or loose . Visual 104. Marking incomplete or misleading Visual 102. Nails missing or improperly driven . Visual Minor: . None defined. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-I MIL-D-46282 13 W 9779706 0330757 I m A sample of 5 grams shall
24、 be selected and tested as specified in 4.3.1. If the binder-lubr- cant content is in excess of the percentage specified and if loading has not begun, the lot of tetryl shall be rejected until proper corrective action has been accomplished as verified by repeating the binder lubricant content test s
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILD462821960DETONATORSTABM23LOADINGASSEMBLINGANDPACKINGM23 针刺 雷管 装载 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-442407.html