ARMY MIL-D-45441 D-1974 DETONATOR STAB M61 PARTS FOR AND LOADING ASSEMBLING AND PACKING《针刺雷管的M61零件的装载 组装和包装》.pdf
《ARMY MIL-D-45441 D-1974 DETONATOR STAB M61 PARTS FOR AND LOADING ASSEMBLING AND PACKING《针刺雷管的M61零件的装载 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-D-45441 D-1974 DETONATOR STAB M61 PARTS FOR AND LOADING ASSEMBLING AND PACKING《针刺雷管的M61零件的装载 组装和包装》.pdf(18页珍藏版)》请在麦多课文档分享上搜索。
1、MLL-D-Ll5441D 13 W 7779706 0307120 5 W - - - L; -37-11; MIL-D-45441D (PA) 5 April i974 SUPERSEDING . 1 June i966 and MIL-D-45441C (MU) MIL-D-45493C (MU) 1 June i966 (See 6.6) MILITARY SPECIFICATION DETONATOR, STAB, 61 PARTS FOR AND LOADING, ASSEMBLING AND PACKING *This Specification is approved for
2、use by all Departments and Agencies of the Department of Defense. %l. SCOPE 1.1 This specification contains quality assurance provisions and special requirements for the parts, loading, assembling and packing of one type of initiating device designated as Detonator, Stab, 61. *2. APPLICABLE DOCUMENT
3、S 2.1 The following documents of the issue in effect on date of invitation for bids or request for proposal, form a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY MIL-P-116 - Preservation, Methods of MIL-A-2550 - Ammunition, General Specification For STANDARDS MIL
4、ITARY MIL-STD-105 - Sampling Procedures and Tables for Inspection by Attributes (ABC-STD-105) FSC: i375 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-. MIL-STD-109 - Quality Assurance Terms and MIL-STD-650 - Explosives, Sampling, Inspection and Tes
5、ting MIL-STD-116 8- Lot Numbering of Ammunit ion MIL-STD-1235- Single and Multilevel Continuous Sampling Procedures and Tables for Inspection by Attributes. Definitions DRAWINGS U. S. AFMY PICATINNY ARSENAL PRODUCT AND PACKAGING DRAWINGS 9258182 9258183 9258184 8865554 - Box, Set Up, Packing, Ammuni
6、tion, Inner for Small Explosive Components - Box, Set Up, Packing, Ammunition, Outer for Small Explosive Components - Box, Packing, Ammunition for Small Expl os ive Component s - Detonator, Stab, n61, Assembly INSPECTION EQUIPMENT DRAWINGS 8816367 8827828 8855295 8868629 88686 31 9200012 9200602 Gui
7、de, Firing Pin Sleeve Disc, Lead-Coined Ball, Steel Assembly, Firing Pin, Firing Bushing (Copies of specifications, standards and drawings required by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer.
8、 ) * 3 REQUIREMENTS 8.1 Material.-Materials shall be in accordance with Detonator.-The detonator shall eomply with all applicable drawings and specifications. requirements specified on Drawing (dwg,) 8865554 and with all requirements specified in applicable specifications. 3.2 2 Provided by IHSNot f
9、or ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-45 44iD (PA) 3.3. Moisture content 3.3.1 Lead azide.-The moisture content of the lead azide used in loading the detonator shall not exceed 0.50 percent. 3.3.2 Primer mixture .-The moisture content of the primer mixtu
10、re used in loading the detonator shall not exceed 0.30 percent. 3.4 Functioning 3.4.1 Output.-The detonators shall function, on the first attempt under an applied energy of 4.95 inch ounces, and shall cause a .400 inch diameter perforation in a .o65 inch min. thick coined lead disc. 3.4.2 Waterproof
11、ness.-The detonators shall be waterproof as evidenced by normal functioning, as specified in 3.5.1 after being immersed in water maintained at 75 degrees Fahrenheit (F.) plus or minus 5 degrees F., at a depth of 2 inches minimum for not less than 48 hours. 3.5 Workmanship.-All parts and assemblies s
12、hall be fabricated and loaded in a thorough, workmanlike manner. They shall be free of burrs, sharp edges, cracks, dirt, grease, rust, corrosion products and other foreign matter. The cleaning method used shall not be injurious to any part nor shall the parts be contaminated by the cleaning agent. E
13、xterior surface coatings shall be continuous except for a few light scratches not exposing base material. All required markings shall be neat and sharply defined. All packing components shall be dry. technical provisions for first article inspection. Requirements for the submission of first article
14、samples by the contractor shall be as specified in the contract. 3.6 First Article Inspection.-This speclfication contains *4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for Inspection.-Unless otherwise specified in the contract or purchase order, the sapplier is responsible for the performance
15、 of all inspection requirements as specified herein. Except as otherwise specified in the contract or order, the supplier may use his own or any other facilities suitable for the performance of the inspection re- 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license
16、from IHS-,-,-MIL-D-45441D (PA) quirements specified herein, unless disapproved by the Govern- ment. the inspections set forth in the specification where such inspections are deem:I necessary to assure supplies and ser- vices conform to prescribed requirements. Reference shall be made to MIL-STD-109
17、to define terms used herein. The provi- sions of MIL-A-2550 shall apply. Submission of Product. -At the time each completed lot of items deliverable under the contract is submitted to the Government for acceptance, the contractor shall supply the fol- lowing information accompanied by a certificate
18、which attests that the information provided is correct and applicable to the product being submit ted. The Government reserves the right to perform any- of 4.1.1 a. A statement that the lot complies with all of the quality assurance provisions specified in this specification. b. Drawing and specific
19、ation number and date, together with identification and date of changes thereto. c. A statement that all material purchased by the con- t,ractor meets requirements, when such material is controlled by Government or commercial specifications referenced in any of the contractual documents, and that ce
20、rtificates of conformance are on file and available for review. d. Number of items in the lot. e. Date submitted. The certificate shall be signed by a responsible agent of the certifying organization. The initial certificate submitted shall be substantiated by evidence of the agents authority to bin
21、d his principal. Substantiation of the agents authority will not be required with subsequent certificates unless, during the course of the contract, this authority is vested in another agent of the certifying organization. 4.2 First Article Inspection 4.2.1 Submission. - Prior to the start of regula
22、r pro- duction, the contractor shall submit a first ayticle sample (see 6.1) to a Government approved facitity as designated by the contracting officer for evaluation in accordance with the provisions of 4.2.2 and 4.2.3. The first article sample shall consist of three hundred forty (340) loaded prim
23、ers and 50 complete sets of parts (i.e., 50 each of every component), which have been produced by the contractor or furnished by a 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-supplier and which have been manufactured using the same pro- duction
24、 processes, procedures and equipment which will be used in fulfilling the contract. All parts and material, including packaging and packing, shall be obtained from the same source of supply as will be used in regular production. Prior to submission, the contractor shall inspect the sample to the deg
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILD45441D1974DETONATORSTABM61PARTSFORANDLOADINGASSEMBLINGANDPACKING 针刺 雷管 M61 零件 装载 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-442385.html