ARMY MIL-C-63318-1979 CASE CARTRIDGE 165MM M104 METAL PARTS ASSEMBLY《M104型165MM炮弹筒 金属零件装配》.pdf
《ARMY MIL-C-63318-1979 CASE CARTRIDGE 165MM M104 METAL PARTS ASSEMBLY《M104型165MM炮弹筒 金属零件装配》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-C-63318-1979 CASE CARTRIDGE 165MM M104 METAL PARTS ASSEMBLY《M104型165MM炮弹筒 金属零件装配》.pdf(28页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-C-63318 13 7779706 03q8072 5 I MIL-C-63318 (AR) 18 May 1979 -GUPERSLDING 1 May 1964 FA-PD-MI-2617 MILITARY SPECIFICATION CASE , CARTRIDGE , 16 5MM , M10 4 METAL PARTS ASSEMBLY This specification is approved for use by the U.S. Army Research and Development Command, Department of the Army and is
2、available for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 31 This specification covers Case, Cartridge, 165MM, M104 - Metal Parts. 2. APPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect on date of invitation for bids, or request for proposals, form
3、a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY MIL-A-48078 - Ammunition, Standard Quality Assurance MIL-C-45467 - Cartridge, 165MM, HEP, M123A1, Loading, Provisions, General Specification for Assembling and Packing FEDERAL PPP-F-320 - Fiberboard, Sheet Stock and
4、 Cut Shapes PPP-B-636 - Box, Fiberboard THIS DOCUMENT CONTAINS PAGES. FSC : 1320 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-C-633L 13 m 7797706 0348073 7 m MIL-C-63318 (AR) STANDARDS MI LI TARY MIL-STD-1169 - Packaging, Packing and Marking
5、of inert Ammunition Components DRAWINGS ARRADCOM 8845066 - Case, Cartridge, 165MM, My-04, Metal 8845042 - Cartridge, 165MM, HEP, M123Al. Loading Parts Assembly Assembling and Packing (Conies of snecifications, standards, drawings and publications required by suppliers in connection with specific pro
6、curement functions should be obtained from the procuring activity or as directed by the contracting officer!. this specification to the extent specified herein. Unless otherwise indicated, the issue in effect on date of invitation for bids or request for proposal shall apply. 2.2 Other publications.
7、-The followinq documents form a part of ANSI - B46.1 - Surface Texture (Application for copies should be addressed to the American National Standard Institute (ANSI), 1430 Broadway, New York, New York 10018). ASTM - E18 Tests for Rockwell Hardness and Rockwell AS!FM - B117 Salt Spray (Fog) Testing S
8、uperficial Hardness for Meta1i.c Materials (Application for copies should be addressed to the American Society for Testing and Materials (ASTM), 197-6 Race Street, Philadelphia, Pa. 19103). 3. REQUIREMENTS 3.1 General.-Materials, Darts and assemblies shall comply with the requirements of the applica
9、ble drawings and referenced specifications. 3.2 Heat treatment/stress relief.-Heat treatment or stress relief applied to any component part shall be uniform throughout and shall so be conducted so as to produce the mechanical properties and physical properties specified on the applicable drawing, 2
10、. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-C-63318 13 W 777770b Oq2bh15 i W MIL-C-63318 (AR) 3.3 Brazed joint.-The brazed metal shall be visible for the . full 360 circumference around the exterior and interior of the joint. 3.3.1 Strengt
11、h of brazed joint.-The body and case spring of the cartridge case shall be joined in the manner specified on drawing (dwg.) 8845066. The joint shall withstand the application of a 500 inch-poupd, minimum, torque without permanent distortion or failure of the brazed joint. 3.4 Surface preparation and
12、 appl.ication of protective finish.- Where cleaning- and surface pretreatment are required by component details, the process shall apply to all indicated surfaces regardless of contour configuration. The protective finish shall be as specified on the applicable drawings and shall be uniformly applie
13、d to the surfaces designated by the applicable drawings. Salt spray and other required testing shall be in accordance with the applicable drawings and specifications. cartridge case assembly when tested as specified in 4.S.4. 3.5 Proving ground test.-There shall be no failure of the 3.6 First articl
14、e inspection.-This specification contains technical provisions for first article inspection. Requirements for the submission of first article samples by-the contraccor shall be as specified in the contract. 3.7 Workmanship.-The requirements for workmanship are as shown on the applicable drawings, in
15、 the applicable specifications and the following. 3.7.1 Threads.-Threads shall be full and undamaged for the entire minimum length or depth as required on the applicable drawing and shall be in accordance with the provisions of MIL-A-2550. 3.7.2 Burr-No parts shall have a burr. 3.7.3 Metal defects.-
16、The cartridge case and components shall be - free from cracks, splits, cold shuts, and inclusions, porosity or any similar character istic. not contain chips, dirt, grease, oil, rust, corrosion or other foreign matter. 3.7.4 Foreign matter.-The cartridge case and components shall 4. QUALITY ASSURANC
17、E 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-63314 13 a 9979906 OL12661b LI M c MIL-C-63318 (AR) 4.1 Responsibility for inspection and standard quality assurance provisions.-Unless otherwise specified herein ar in the contract, the provi
18、sions of MIL-A-48078 shall aqly ancl are hereby made a part of this detail specification. 4.2 Classification of inspections.-The following types of inspection shall be performed on this item: a. First Article Inspection b. Quality Conformance Inspection 4.3 First article inspection 4.3.1 Submission.
19、-The contractor shall submit a first article sample as designated by the Contracting Officer for evaluation in accordance with the provisions of 4.3.2. The first article sample shall consist of the foll.owing items in the sample quantities indicated . DRAW I NG S QUANTITY PART DESCRIPTION Case, Cart
20、ridge Spring , Primer Retainer, Spring Case, Spring Body Screw Handle Assembly Retainer, Handle Handle Lock Assembly Clip, Lock Spring, Lock (Plated) Spr ing, Lock (Unplated) 8845066 8845070 8845069 8845068 8845067 10520028 8845053 8845058 8845059 8845060 8 a4 50 57 8845061 a 8 4 5060 35 10 10 10 10
21、 10 10 10 10 10 10 10 5 4.3.2 Inspections to be performed.-See MIL-A-48078 and Table I spec if i ed herein. 4.3.3 Rejection.-See MIL-A-48078. 4.4 Quality conformance inspection 4.4.1 Inspection I.ot formation.-Inspection lots shall comply with the lot formation provisions of MIL-A-48078. 4.4.2 Exami
22、nation.-See MIL-A-48078. c a. Sampling plans,-Unless otherwise specified in the Classification of Defects and Test Tables, sampling plans and procedures shall. be in accordance with MIL-STD-105, Inspection Level II. 4 i Provided by IHSNot for ResaleNo reproduction or networking permitted without lic
23、ense from IHS-,-,-A- MIL-C-633L 13 m 77777Ob 042bbL b m MIL-C- 6 3 3 18 (AR) 4.4.2.1 Visual inspections.-In the event of a ispute, four power (4X) magnification shall be used in performing visual inspections for such defects as burrs and foreign matter. The roughness comparison specimens prescribed
24、by ASA - B46.1 shall be used as a basis or surface roughness determination, 4.4.2.1.1 Defect reporting.-The contractor shall prepare a report of all critical defects found, including the number of cartridge case metal parts inspected and corrective action taken, in accordance with Data Item Descript
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILC633181979CASECARTRIDGE165MMM104METALPARTSASSEMBLYM104 165 MM 炮弹 金属 零件 装配 PDF

链接地址:http://www.mydoc123.com/p-442042.html