ARMY MIL-C-63310 (6)-1986 CARTRIDGE 105MM APFSDS-T M774 LOADING ASSEMBLING AND PACKING《M774型105MM炮弹 APFSDS-T的装载 组装及包装》.pdf
《ARMY MIL-C-63310 (6)-1986 CARTRIDGE 105MM APFSDS-T M774 LOADING ASSEMBLING AND PACKING《M774型105MM炮弹 APFSDS-T的装载 组装及包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-C-63310 (6)-1986 CARTRIDGE 105MM APFSDS-T M774 LOADING ASSEMBLING AND PACKING《M774型105MM炮弹 APFSDS-T的装载 组装及包装》.pdf(12页珍藏版)》请在麦多课文档分享上搜索。
1、HIL-C-633LO (b) 13 97977Ob 0347874 3 H MIL-C-63310 (AR) AMENDMENT 6 18 May 1986 SUPERSEDING AMENDMENT 5 18 February 1986 MILITARY SPECIFICATION CARTRIDGE: 105mm, APFSDS-Ti M774 LOADING, ASSEMBLY AND PACKING This amendment forms a part of Military Specification MIL-C-63310 (AR), dated 23 May 1980, an
2、d is approved for use within the US Army Armament, Munitions and Chemical Command and is available for use by all Departments and Agencies of the Department of Defense. Delete all reference to “XM774“ and substitute “M774“. PAGE 1 Under SPECIFICATIONS MILITARY, add: “MIL-P-70465 - Plug and Disc Asse
3、mbly, 8597489“. PAGE 2 * Under Standards Military, add: *- - “MIL-STD-1235 - Single and Multi-Level Continuous Sampling Procedures and Tables for Inspection by Attributes“ * 2.1.2 Other Government documents, drawinqs, and publications. Under Drawings, add : “12631100 - Packing and Marking for Contai
4、ner, Ammo, 3.1.2 (U) Pluq and disc assemblies: Add new paragraph -3.1.2 Metal, for Ctg, 105mm, APFSDS-T: M735/M774“ as follows: “3.1.2 (U) Pluq and disc assemblies. Plugs, discs, and plug and disc assemblies shall be drawn from lots inspected and accepted in accordance with MIL-P-70465.“ Add paragra
5、ph 3.2.2 as follows: “3.2.2 (U) Radiographic examination. The cartridge shall be radiographed in accordance with 4.5.9. Visual standards shall be established by ARRADCOM. “ BSMC N/A Page 1 of 12 FSC 1315 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Provided by IH
6、SNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-63310 (6) 13 m 7777906 O347875 5 W MIL-C-63310 (AR) AMENDMENT 6 PAGE 3 Delete paragraph 3.4.4 in its entirety and substitute: “3.4.4 (U) Muzzle velocity. The corrected muzzle velocity of the cartridge when fire
7、d at 700F shall be not greater than 4990 fps and shall be not less than 4910 fps.“ PAGE 6 Table I, Cartridge, 105mm, APFSDS-T, M774, under “Swipe Test“: Add the following examination: “Rad i og r aph i c ex ami n a t i on 40 3.2.2 4.5.9.1“. PAGE 10 4.4.2.2 (U) Projectile, prior to assembly with cart
8、ridge case: Add major characteristic 102 as follows: “102 Hardcoat on fin leading edge nissing or damaged after checking tracer torque O. 40% (a) 3.2 Visual“ . Under Notes, add Note (a) as follows: “(a) This examination shall be performed on all projectiles which are tested for tracer torque.“ PAGE
9、12 4.4.2.4 (U) Case, cartridge and liner assembly: Delete in its entirety and substitute the new page 12, attached. PAGE 17 4.4.2.9 (U) Shield, water-repellant. Delete minor characteristics 201 and 202 in their entirety and substitute: “201 True position of recessed slots 0.65% 3.2 Gage 202 Depth of
10、 recess slots 0.65% 3.2 Gage“. PAGE 19 4.4.2.11 (U) Cartridge, 105MM, APFSDS-T, M774: Add major characteristic 111 as follows: “111 Radiographic examination 10 3.2. 4.5.9.1“. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- A ._. - _- . MIL-C-b33LO
11、 (6) 13 M 7977706 0347876 7 M MIL-C-63310 (AR) AMENDMENT 6 PAGE 23 * Add new paragraphs 4.4.2.16, page 23A (included) *and 4.4.2.17, page 23B (included) . PAGE 24 4.4.2.1.2 (U) Production lots. Delete Code letter “G“ and substitute Code letter “F“. PAGES 26 Delete 4.5.8 (U) Providinq ground function
12、al tests and 4.5,8.1 (U) Target impact dispersion in their entirety and substitute the following: “4.5.8 (U) Ballistic tests shall be performed at a proving ground in accordance with the applicable Acceptance Test Procedure.“ a. (U) All firings for target impact dispersion (TID) shall be from a fixe
13、d type facility mount utilizing a muzzle boresight or properly maintained service tank with operable fire control and fixtured with an M68 gun tube. When firing from a tank, the tanks recoil and mechanical fire control systems shall be inspected prior to testing. b, (U) The ballistic samples shall b
14、e electrically fired using energy equivalent to the service tanks firing circuit. C. (U) Testing shall be conducted with 105MM, MC8 gun tubes. All gun tubes shall be painted white or a sunscreen or thermal sleeve shall be utilized. All gun tubes shall be dedicated for 700F TID testing of M774 cartri
15、dges. The remaining life of the tubes utilized in each phase shall not exceed the wear limits given in 6.4. d. (U) Tubes used shall be inspected for adequacy prior to initiating each firing program. The gun tubes shall be inspected for adequacy by performing, at a minimum, visual inspection, pullove
16、r gaging and complete stargage and borescope inspections. At nominal midlife the tubes shall be inspected for adequacy by performing complete stargage and magnetic particle testing . 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-C-63310 (6)
17、13 7779706 O347877 7 a MIL-C-6 3 3 1 O (AR) AMENDMENT 6 e. (U) All gun tubes shall be inspected when unexpected occurrences, such as projectile breakup, cartridge case rupture, etc., are experienced during any of the test phases. Required inspection after these instances shall include visual inspect
18、ion, pullover gaging and complete stargage, borescope and magnetic particle inspection. f. (U) TID tests shall be conducted by firing sample cartridges specified herein at a 20 foot by 20 foot (6.1 by 6.1 meters) target located 3000 meters from the gun muzzle. The target shall have a 10 foot border
19、on all sides for determination of erratic flight. The target shall be made of a material approved by the technical agency. Targets used for hot firing phases shall allow determination of fin hardcoat degradation and fin burning . g. (U) A sufficient number of rounds for instrumentation checkout, muz
20、zle velocity stabilization and spotting purposes will be fired prior to the start of the test. h. (U) When firing from a fixed mount, muzzle boresighting and aiming procedures shall be used to aim the weapon so the expected point of impact will be the center of the target. The group center of impact
21、 of at lease three consecutively fired spotter rounds must be within a 1 meter square located at the center of the target before firing the control or test rounds. i. (U) When firing from a fixed mount, once the gun has been spotted on the target for a test or control group, the elevation and deflec
22、tion of the weapon shall remain the same for that test group. Changes in the muzzle aiming point from round to round, shall be recorded by adjusting settings on the boresight to get back onto the original aiming mark. j. (U) when firing from a service tank, the following firing procedures shall be u
23、tilized: 1. Boresight the weapon on the center of target and apply super elevation utilizing a gunnery quadrant. Fire spotter rounds to assure the weapon is zeroed on the target center. The group center of impact for a minimum of three consecutive rounds within a one 4 i) Provided by IHSNot for Resa
24、leNo reproduction or networking permitted without license from IHS-,-,-MIL-C-6 3 3 1 O (AR) AMENDMENT 6 meter square of the target center is required. Finalize reticle setting on aiming stake. After the target has been spotted for a shot group, every effort should be made to keep the elevation and d
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILC6331061986CARTRIDGE105MMAPFSDSTM774LOADINGASSEMBLINGANDPACKINGM774 105 MM 炮弹 APFSDST 装载 组装 包装

链接地址:http://www.mydoc123.com/p-442037.html