ARMY MIL-C-51385 B-1990 CABLE ASSEMBLY POWER ELECTRICAL ABCA-M168《电力电缆组装 ABCA - M168》.pdf
《ARMY MIL-C-51385 B-1990 CABLE ASSEMBLY POWER ELECTRICAL ABCA-M168《电力电缆组装 ABCA - M168》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-C-51385 B-1990 CABLE ASSEMBLY POWER ELECTRICAL ABCA-M168《电力电缆组装 ABCA - M168》.pdf(11页珍藏版)》请在麦多课文档分享上搜索。
1、. - I qc MIL-C-51385B bb 77777Ob OLibLb2 7 MIE-C-5 83 8 5B (EA) 30 August 1990 SUPERSEDJNG 24 November 1986 MIL-C-5 1385A(EA) MILITARY SPECIFICATION CABLE ASSEMBLY, POWER, ELECTRICAL: ABCA-M168 This specjication is approved for use by the U.S. Army Chemical Research, Development and Engineering Cent
2、er, Department of the Army, and is available for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification covers one type of electrical power cable assembly (see 6.1). 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications, standards, a
3、nd handbooks. The following specifications, stan- dards, and handbooks form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those listed in the issue of the De- partment of Defense Index of Specifications and Standards (DODISS) an
4、d supplement thereto, cited in the solicitation (see 6.2). Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Commander, U.S. Army Chemical Research, Development and Engineering Center, ATTN: SMCCR
5、-PET-S, Aberdeen Proving Ground, MD 2 10 10-5423 by using the self-addressed Standardization Document Improvement Proposal (DD Form 1426) appearing at the.end of this document or by letter. AMSC NIA FSC 6665 DISTRIBUTJON STATEMENT A. Approved for public release; distribution is unlimited. %- . Provi
6、ded by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-51385B 66 9 779770b OllbLb3 7 G ; MIL-C-5 1385B(E) 1 STANDARDS FEDERAL FED. TEST METHOD STD. NO. 101 - Test Procedures for Packaging Materials MIL-SIFD-454-General Requirements for Electronic Equipment
7、. (Unless otherwise indicated, copies of federal and military specifications, standards, and handbooks are available from the Standardization Documents Order Desk, Building 4D, 700 Robbins Avenue, Philadelphia, PA 191 11-5094.) 2.1.2 Other Government documents, drawings, and publications. The follow
8、ing other Government documents, drawings, and publications form a part of this document to the extent specified herein. Unless otherwise specified, the issues are those cited in the solicita- tion. U. S. ARMY CEMICAL RESEARCH, DEVELOPMENT AND ENGINEERING CENTER DRAWINGS 5-15-5550 - Cable Assembly, P
9、ower, Electrical: ABCA-M168 SPECIAL PACKAGING INSTRUCTiONS (SPI) P5-15-5550 - Cable Assembly, Power, Electrical: ABCA-M168 (Copies are available from Commander, U.S. Army Information Systems Command, ATTN: ASQNC-ART-CTF, Rock Island, IL 61299-7300.) 2.2 Order of precedence. In the event of a conflic
10、t between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 Materials and components. 3.1.1 Materials.
11、 All materials cited on Drawing 5-15-5550 and on the subsidiary draw- ings shall conform to the specifications listed thereon, or to the specific characteristics set forth on the drawings and in this specification. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without licens
12、e from IHS-,-,-MIL-C-5L385B 66 U 777770b 046Lb4 O M MIL-C-51385B(EA) 3.1.2 Components. All components of the cable assembly shall conform to the specifi- 0 cations and drawings listed on Drawing 5-15-5550 and subsidiary drawings. 3.2 Manufacture and assembly. The components shall be manufactured and
13、 assembled as specified on the subsidiary drawings listed on Drawing 5-15-5550. 3.3 Resistance of cable assembly. The cable assembly shall have the resistances speci- fied in table I when tested in accordance with 4.4.6.1. Table 1.4 - tsI From P1-A P1-A P1-B E-2 Pl-Shell P1 -S hell P2-1 P2-Shell P2-
14、Shell P2-Shell To P1-E P2-5 P2-1 P2-4 Pl-A P1-B P2-5 p2-1 P2-2 P2-5 Resistance (ohms) 1.0, max. 1.0, max. 1.0, max. 1.0, max. . 1.0 x 16min. 1.0 x 16min. 1.0 x 16min. 1.0 x 0min. 1.0 x 16min 1.0 x 16min. 3.4 First article. When specified (see 6.2), a sample shall be subjected to the first a article
15、inspection (see 6.3) in accordance with 4.3. 3.5 Workmanship. The workmanship of the cable assembly shall be in accordance with MIL-STD-454. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. Unless otherwise specified in the contract or pur- chase order, the contractor is responsibl
16、e for the performance of all inspection require- ments (examinations and tests) as specified herein. Except as otherwise specified in the contract or purchase order, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, u
17、nless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in this specification where such inspections are deemed necessary to ensure supplies and services conform to prescribed requirements. 4.1.1 Responsibility for compliance. All items shal
18、l meet all requirements of sections 3 and 5. The inspection set forth in this specification shall become a part of the contractors overall inspection system or quality program. The absence of any inspection requirements in the specification shall not relieve the contractor of the responsibility of e
19、nsuring that all 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-999790b 04b3865 2 - MIL-C-S1385B(EA) - MIL-C-513858 bb products or supplies submitted to the Government for acceptance comply with all require- ments of the contract. Sampling inspect
20、ion, as part of manufacturing operations, is an acceptable practice to ascertain conformance to requirements, however, this does not authorize submission of known defective material, either indicated or actual, nor does it commit the Government to accept defective material. 41.2 Contractor assurance
21、 of compliance. The contractors quality program or de- tailed inspection system shall provide assurance of compliance of all characteristics with the applicable drawing, special packaging instruction, and specification requirements using, as a minimum, the conformance criteria specified herein. 4.1.
22、3 Alternative inspection provisions. Alternative inspection procedures, methos, or equipment, such as statistical process control, tool control, and other types of sampling procedures may be used by the:contractor when they provide, as a minimum, the level of quality assurance required by the inspec
23、tion provisions specified herein. Prior to applying such alternative procedures, methods, or equipment, the contractor shall describe them in a written proposal submitted to the Government for evaluation and approval. (See 6.5) When required, the contractor shall demonstrate that the effectiveness o
24、f each proposed alterna- tive is equal to or better than the quality assurance provisions specified herein. In cases of dispute as to whether the contractors proposed alternative provides equal quality assur- ance, the provisions of this specification shall apply. All approved alternative inspection
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILC51385B1990CABLEASSEMBLYPOWERELECTRICALABCAM168 电力电缆 组装 ABCAM168PDF

链接地址:http://www.mydoc123.com/p-441813.html