ARMY MIL-C-51360 B-1988 CANISTER SMOKE HC 105MM PROJECTILE M1《M1型105MM HC烟幕弹》.pdf
《ARMY MIL-C-51360 B-1988 CANISTER SMOKE HC 105MM PROJECTILE M1《M1型105MM HC烟幕弹》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-C-51360 B-1988 CANISTER SMOKE HC 105MM PROJECTILE M1《M1型105MM HC烟幕弹》.pdf(18页珍藏版)》请在麦多课文档分享上搜索。
1、- MIL-C-51360B 13 = 7777706 0333888 T m NIL-C-5 1360B(EA) 22 January 1988 SUPERSEDING MIL-C-51360A(EA) 20 October 1976 MILITARY SPECIFICATION CANISTER, SMOKF, HC, 105 bfM PROJECTILE, M1 This specification is approved for use within U.S. Army Chemical Research, Development and Engineering Center, Dep
2、artment of the Army, and is available for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification covers the filling and assembling for one type of HC smoke canister for a base ejection shell. 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Sp
3、ecifications and standards. The following specifications and stan- dards form a part of this specification to the extent specified herein. otherwise specified, the issues of these documents shall be those listed in that issue of the Department of Defense Index of Specifications and Standards (DODISS
4、) and supplement thereto, cited in the solicitation. Unless SPECIFICATIONS FEDERAL QQ-S-781 - Strapping - - Steel, and Seals PPP-B-587 - Boxes, Wood, Wirebound Pallet Type PPP-B-621 - Boxes, Wood, Nailed and Lock-Corner PPP-B-636 - Boxes, Shipping, Fiberboard PPP-F-320 - Fiberboard: Corrugated and S
5、olid, Sheet Stock (Container PPP-T-76 - Tape, Packaging, Paper (For Carton Sealing) Grade) and Cut Shapes : Beneficial comments (recommendations, additions, deletions) and any perti- : : nent data which may be of use in improving this document should be addressed: : to: : Center, ATTN: SMCCR-SPT-S,
6、Aberdeen Proving Ground, MD 21010-5423 by using: : the self-addressed Standardization Document Improvement Proposal (DD Form : : 1426) appearing at the end of this document.or by letter. Commander, U. S. Army Chemical Research, Development and Engineering OMSC FSC 1315 DISTRIBUTION STATEMENT A. Appr
7、oved for public release; distribution is unlimited. 7 THIS DOCUMENT CONTAINS 1% PAGES. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-51360B II3 = 7979906 0333887 II = MIL I TARY MIL-P-223 - Powder, Black MIL-A-2550 - Ammunition, General Speci
8、fication For STANDARDS MIL I TAKY MIL-STD-105 - Sampling Procedures and Tables for Inspection by Attributes MIL-STD-129 - Marking for Shipment and Storage MIL-STD-650 - Explosive: Sampling, Inspection and Testing MIL-STD-1167 - Ammunition Data Card MIL-STD-1168 - Ammunition Lot Numbering MIL-STD-123
9、5 - Single- and Multi-Level Continuous Sampling Procedures and Tables For Inspection by Attributes 2.1.2 Drawings. The following drawings form a part of this specification to the extent specified herein. Unless otherwise specified, the issues shall be those in effect on the date of the solicitation.
10、 DRAWINGS AND TECHNICAL DATA PACKAGE LIST (TDPL) U.S. ARMY CHEMICAL RESEARCH, DEVELOPt4ENT AND ENGINEERING CENTER TDPL 15-11-22 - Canister, Smoke, HC, 105 MM Projectile, M1 (Copies of specifications, standards, and drawings required by contractors in connection with specific acquisition functions sh
11、ould be obtained from the contracting activity or as directed by the contracting activity.) 2.2 Order of precedence. In t.he event of a conflict between the text of this specification and the references cited herein (except for associated detail specifications, specification sheets or E?S standards)
12、, the text of this specification shall take precedence. Nothing in this specification, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 Materials and components. 3.1.1 Materials. All materials cited on TDPL 15-11-22 or on the
13、 subsidiary drawings shall conform to the specifications listed thereon, unless modified specific characteristics are set forth on the drawings, in which case, detail drawing shall take precedence (see 6.4). 3.1.2 Components. All components of the M1 canister shall conform to the specifications and
14、drawings listed on TDPL 15-11-22 (see 6.4). 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-5L360B 13 9999906 0333890 8 a L a a MIL-C-5 1360B( EA) 3.2 Filling and assembly. The M1 canister shall be filled and assembled as specified on Drawing
15、s 15-11-218 and 15-11-22, respectively (see 6.4 and 6.5). The white smoke mixture (HC) (Drawing 143-1-1) shall be consolidated into the body assembly, after the ignition sleeve, starter slugs/zinc sleeve assembly, and packing disk are in place, in two increments as indicated on Drawing 15- 11-218. E
16、ach increment shall be consolidated at 39 to 41 tons dead load for a period of not less than 3 seconds. The excess white smoke mixture shall be removed to a faced height as shown on Drawing 15-11-218. Additional packing disks shall be added as required to fill any void. installed and the body assemb
17、ly completed as indicated on Drawings 15-11-218 and 15-11-22, respectively. distance not to exceed the thickness of the disk, The closing disk shall be The packing disk may extend above faced height a 3.3 Starter slug. 3.3.1 Volatile content. The volatile content of the finished starter slug shall n
18、ot exceed 0.5 percent when tested in accordance with 4.4.4.2(a). 3.3.2 Crush strength. The crush strength of the starter slug shall be such that the starter slug shall not crush or break when a uniformly distributed load of 500 pounds (lb) is applied parallel to the longitudinal axis of the starter
19、slug and when tested in accordance with 4.4.4.2(b). 3.4 Impregnated sleeve. The impregnated sleeve shall conform to Drawing 15-11-23. After drying, the sleeve shall be ignited and burn over its entire area within 4 seconds maximum when tested in accordance with 4.4.4.2(c). 3.5 Starter mixture. The s
20、tarter mixture shall conform to the chemical composition specified on Drawing 15-11-119 when tested in accordance with 4.4.4.2(d) and 4.4.4.2(e). 3.6 Functioning. The M1 canister shall produce a continuous dense cloud of white smoke (opaque) for 40 to 95 seconds when tested as specified in 4.4.4.1.
21、Time from first ignition of starter mix to first emission of smoke under pressure shall not exceed 10 seconds. Smoke emission time shall be that period, when smoke is emitted under pressure until the cessation of smoke under pressure. Smoldering of the canister after the charge has burned is not con
22、sidered part of the smoke emission time. There shall be no interruption of smoke by flame (burning of the starter mixture, first 10 seconds maximum, shall not be construed as flaming). 3.7 First article ballistic information. This specification makes provi- sions for a first article ballistic inform
23、ational test prior to commencement of regular production when tested as specified in 4.3.4. 3.8 Preproduction. Prior to the start of regular production, a preproduc- tion lot of canisters shall be produced in accordance with this specification for examination and tests (see 4.3). Provided by IHSNot
24、for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-SL360B 13 m 7777706 0333873 T m 3.9 Workmanship. The canister shall be free from contamination (pyrotechnic mixture, oil, or grease) and damage including but not limited to dents, cracks or deformation which could a
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILC51360B1988CANISTERSMOKEHC105MMPROJECTILEM1M1 105 MMHC 烟幕弹 PDF

链接地址:http://www.mydoc123.com/p-441807.html