ARMY MIL-C-51358 A-1978 CANISTER SMOKE HC 155MM PROJECTILE M1 AND M2 COMPONENTS FOR《M1和M2型155MMHC烟灰色射弹成分》.pdf
《ARMY MIL-C-51358 A-1978 CANISTER SMOKE HC 155MM PROJECTILE M1 AND M2 COMPONENTS FOR《M1和M2型155MMHC烟灰色射弹成分》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-C-51358 A-1978 CANISTER SMOKE HC 155MM PROJECTILE M1 AND M2 COMPONENTS FOR《M1和M2型155MMHC烟灰色射弹成分》.pdf(14页珍藏版)》请在麦多课文档分享上搜索。
1、i4 Februarv 1978 . SUPERSEBING MILITARY SPECIFICATION CANISTERS, SNOIE, HC 155W4 PROJECTILE, Ml and 142; COMPONENTS FOR This specification is approved for use by US Army Armament Research and Development Command, Department of the Army and is available for use by all Departments and Agencies of the
2、Depart- ment of Defense. 1. SCOPE 1.1 This speciffcation covers the components for two types of canisters. 1.2 Classification. “he canister components shall be furnished in the following iqpes as specifYed ( see 6-21: Type Ml - Canister, Smoke, HC, lS5MM Shell, Components Far Type M2 - .Canister, Sm
3、oke, HC, 155MM Shell, Com:onents For (TDPL15-11-121) (TDPL15-11-122) 2. APPLICABLE DQCUMENTS 2.1 Government documents. The following dacuments of khe issue in effect on date of invitation for bids or request for proposal, form a part of this specification to the extent specified herein: FSC 1320 : B
4、eneficial comments (recommendations,additions, deletions) and any : : pertinent data which may be of use in improving this document should : : be addressed to: Commander, ;IS Army Armament Research and Development: : Comand;Attn: DRDAR-TSC-C, Aberdeen Proving Ground, MD 21010 by us-: : ing the self-
5、addressed Standardization Document Improvement Proposal : : (DD Form 1426) appearing at the end of this docu:ent or by Letter. THIS DOCUMENT CONTAINSILPAGES A .- - . Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-STANDARDS MILITARY MIL-STD-105 - Sam
6、pling Procedures and Tables for Inspection by Attributes MIL-STD-129 - Marking for Shipment and Storage. MTL-STD- - Ammunition Data Card. MIL-STD-1168 - Lot Numbering of Ammunition. DRAWINGS US ARMY ARMAMENT RESEARCH AND DEVELOPMENT COMMAND CHEMICAL SYSTEMS LABORATORY TDPL15-11-121 - Canister, Smoke
7、, HC, 155MM Shell, M1; Components TDPL15-11-122 - Canister, Smoke, HC, l55MM Shell, M2, Components For. For. (Copies of specifications, standards, drawings, and publications re- quired by contractors in connection with specific procurement functions should be obtained from the procuring activity or
8、as directed by the contracting officer ) . 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.1.1 Materials . All materials cited on TDPLlj-ll-l21(Ml) and TDPL15- 11-122 (M2mthe subsidiary drawings shall conform to the specifi- cations listed thereo
9、n or to the characteristics set forth on the drawings. 3.1.2 Components. A11 components of the canisters shall conform to the specifications and drawings listed on TDPL15-11-121 and TDPL15-11-122 and subsidiary drawings. 3.2 Assembl , The body and tube shall be in accordance with Drawings Ci-li-C1-1
10、1M), D15-1l-hO(Ml), and Di5-11-48 (M2) and shall be assembled in accordance with the body assembly Drawings D15-11-38(1) and C15-11-46(M2) . Surface treatment shall be in accordance with appli- cable drawings and specifications. 3.3 Welds, The body assembly shall not contain more than three ceDa- ra
11、ted projections when tested as specified in 4.4.4;i. 3.4 Salt spray. The body assemblies and closing disks shall meet the requirements of 141-P-16232 when tested as specified in 4.4.4.2. 3.5 Preproduction. production lot shall be produced in accordance.with this specification for examination and tes
12、t (see 4.3). Prior to the start of regular production, a pre- 3.6 Workmanship. The components shall be free from rust, contamination (foreign matter, oil, or grease),. and damage such as dents, cracks, or de- formation which could affect their intended uce. 4. QUALITY ASSURANCE PROVISIONS 4.1 Respon
13、sibility for inspection. 4.1.1 Contractors responsibility. Unless otherwise specified in the . contract or purchase order, the contractor is responsible for the perform- ance of all.inspection requirements as specified herein. Except as other- wise specified in the contract, the contractor may use h
14、is own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. reserves the right to perform any of the inspections.set forth in the spec- ifications where such inspections are deemed necessary to assure supplies and
15、 services conform to specified requirements. The Government 4.1.2 Additional contractors responsibility. Drawings for contractor designed inspection equipment (other than standard measuring equipment ) shall be forwarded to the design agency for approval prior to use for 3 CI-_.- Provided by IHSNot
16、for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-51358A 13 m 7977706 0333877 5 m. . MIL-C-51358A(EA) production (see 6.2) . ister metal components manufacturer shall be responsible for the minimum mechanical property tests required by drawing Ci?-11-39 and Ci5-11-
17、47. Tests shall be performed by a Government approved laboratory. Minimum mechanical property tests shall be found satisfactory prior to production, Provisions of MIL-A-2250 apply, Amnunition data cards prepared in ac- cordance with MIL-STD-i167 shall be forwarded with each lot of components, For pr
18、eproduction and regular production, the can- 4.1.3 Government responcibilxty. Unless .otherwise specified, the Goverment will be responsible for.preproduction inspection. duction samples (4.3.2) shall be forwarded to the design agency laboratory designated by the contracting officer (see 6.2) . Prep
19、ro- or 4.1.4 Objective evidence. The contractor shall provide ob3 ective evi- dence acceptable to the contracting officer that the requirements of 3.1 and section 5 of which specific inspection has not been provided in Specifically laboratory test data and tool control dimensional data shall be prov
20、ided to the contrac- ting officer as proof of compliance of the materza1 specified for the components, . 4.2 Ciassification of inspections. .this specification have been satisfied. (a) Preproduction inspection (see 4.3). (b) Quality conformance inspection ( see 4.4 . 4.3 Preproduction inspection. 4.
21、3.1 Lot, A preproduction lot of 500 sets of components of the type specified7ee 6.2) shall be manufactured using the same methods, materials, equipment, processes, and cycle time as will be used during regular pro- duction. Components consist of body, tube, body assembly, closure disk, zinc sleeve a
22、nd packing disk. warded to the design agency or Government designated laboratory for in- spection and evaluation prior to proceeding with regular production (see 6.2). . Samples as required by 4.3.2 shall be for- Provisions of MIL-A-2550 shall apply. 4.3.2 Sampling. 4.3.2.1 For examination, Componen
23、ts sufficient to assemble 50 canis- Five samples each of the specified body, formed tube ters of the type specified (see 6.2) shall be taken at random from the preproduction lot. . and tube flat development, shall be selected and checked against their respective drawings. ir -_ -_ -_ Provided by IHS
24、Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-WIL-C-51358A 13 m 9799906 0333878 7 m - 4.3.2.2 For destructive tests. (a) Body assembly and closing disk. Ten body assemblies of each type specified (see 6.2) and closing disks shall be taken at random from the prepr
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILC51358A1978CANISTERSMOKEHC155MMPROJECTILEM1ANDM2COMPONENTSFORM1 M2 155 MMHC 烟灰色 成分 PDF

链接地址:http://www.mydoc123.com/p-441804.html