ARMY MIL-C-50779 A-1982 CASING BURSTER M158《M158套管起爆》.pdf
《ARMY MIL-C-50779 A-1982 CASING BURSTER M158《M158套管起爆》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-C-50779 A-1982 CASING BURSTER M158《M158套管起爆》.pdf(10页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-C- 50 779A (AR 1 MILITARY SPECIFICATION 9 NOW 1.983. SUPERSEDING MIL-C-50779 (MU) 15 April 1972 CASING, BURSTER M158 This specification is approved for use by the U.S. Army Armament Research and Development Command, and is available for use by all Departments and Agencies of the Department of De
2、fense. 1. SCOPE 1.1 This specification covers the requirements, quality assurance provisions, and packaging for the M158 Burster Casing for the 81MM Mortar WP round. 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications and standards. Unless otherwise mecified (see 6.21, the followi
3、ng specifications and standards oi the issue listed in that issue-of-the Department of Defense Index of Specifications and Standards (DoDISS) specified in the solicitation, form a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY MIL-A-48078 STANDARDS MILITARY MIL-ST
4、D-105 - Ammunition, Standard Quality Assur- ance Provisions, General Specifica- tions for - Sampling Procedures and Tables for Inspection by Attributes FSC 1310 Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be
5、 addressed to: Commander, US Arm Armament Research and Development Center, Attn. DRSMC-QA, Dover, New Lrsey 07801 by using the self-addressed Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. THIS DOCUMENT CONTAINS /o PAGES. , -_ Provide
6、d by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-50777A 13 W 7777906 0330884 9 m MIL-C-50779A (AR) MIL-STD- 1169 - Packaging, Packing and Marking for Shipment of Inert Ammunition Compo- nents 2.1.2 Other Government documents, drawings, and publica- tio
7、ns. The following other Government documents, drawings, and publications form a part of this specification to the extent specified herein. DRAWINGS U.S. ARMY ARMAMENT RESEARCH AND DEVELOPMENT COMMAND (ARRADCOM) PRODUCT AND PACKAGING DRAWINGS 10521905 - Casing, Burster, M158 (Copies of specifications
8、, standards, handbooks, drawings, and publications required by manufacturers in connection with specific acquisition functions should be obtained from the contracting activity or as directed by the contracting officer.) PUBLICATIONS American National Standards Institute (ANSI) ASA-B46.1 - Surface Te
9、xture (Application for copies should be addressed to the American National Standards Institute, 1430 Broadway, New York, NY 10018) American Society of Testing Materials (ASTM) ASTM Method E-8 - Tension Testing of Metallic Materials (Applications for copies of ASTM publications should be addressed to
10、 the American Society for Testing and Materials, 1916 Race Street, Philadelphia, PA 19103). 2.1.3 Order of precedence. In the event of a conflict between the text of this specification and the reference cited herein, the text of this specification shall take precedence. 2 Provided by IHSNot for Resa
11、leNo reproduction or networking permitted without license from IHS-,-,-MIL-C- 50 779A (AR) r 3. REQUIREMENTS 3.1 Material. Material shall be in accordance with appli- 3.2 Parts. The parts shall comply with all requirements cable drawings and specifications. specified on drawing (dwg.) 10521905 as ap
12、plicable, and with all requirements specified in applicable specifications and standards. 3.3 Mechanical properties. Mechanical properties specified on the applicable drawing shall. be uniform throughout each burster casing. 3.3.1 Metal defects. The bursting casing shall be free from cracks, splits,
13、 folds, cold shuts, inclusions, porosity or similar defects. 3.4 First article inspection. This specification contains technical provisions for first article inspection. Requirements for the submission of first article samples by the contractor shall be as specified in the contract. 3.5 Workmanship.
14、 All parts shall be fabricated and finished in a thorough workmanlike manner. They shall be free of burrs, sharp edges, chips, dirt, grease, corrosion or other foreign matter. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection and standard quality assurance provisions. Unless otherwis
15、e specified herein or in the contract, the provisions of MIL-A-48078 shall apply and are hereby made a part of this detail specification. 4.2 Classification of inspection. The following types of inspection shall be conducted on this item: a. First article inspection b. Quality conformance inspection
16、s 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-5077A 13 W 7777706 0330886 2 m- MIL-C- 50 779A (AR) b 4.3 First article inspection. 4.3.1 Submission. The contractor shall submit a first article sample as designated by the Contracting Office
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILC50779A1982CASINGBURSTERM158M158 套管 起爆 PDF

链接地址:http://www.mydoc123.com/p-441760.html