ARMY MIL-C-48045-1972 CARTRIDGE 40MM PROOF XM387E4 BODY ASSEMBLY AND OGIVE FOR METAL PARTS《XM387E4型40MM防御炮弹 一般金属零件的主体组件和保护帽》.pdf
《ARMY MIL-C-48045-1972 CARTRIDGE 40MM PROOF XM387E4 BODY ASSEMBLY AND OGIVE FOR METAL PARTS《XM387E4型40MM防御炮弹 一般金属零件的主体组件和保护帽》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-C-48045-1972 CARTRIDGE 40MM PROOF XM387E4 BODY ASSEMBLY AND OGIVE FOR METAL PARTS《XM387E4型40MM防御炮弹 一般金属零件的主体组件和保护帽》.pdf(16页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-C-48045 33 9999906 0335637 5 MIL-C-4 8 04 5 (MU) 28 January 1972 SUPERSEDING (See 6.5) MILITARY SPECIFICATION CARTRIDGE, 40MM, PROOF, XM387E4; BODY ASSEMBLY AND OGIVE FOR- ME.TAL PARTS 1. SCOPE 1.1 This specification covers the metal parts for one type of body assembly and ogive. 2. APPLICABLE D
2、OCUMENTS 2.1 The following documents of the issue in effect on date of invitation for bids or request for proposal, form a part of this specification to the extent specified herein. SPECIFXCATIONS MILITARY MIL-A-2550 - Ammunition and Special Weapons, General Specification for Maintenance and Disposi
3、tion of MIL-1-45607 - Inspection Equipment, Acquisition, STANDARDS FEDERAL FED-STD-151 - Metals; Test Methods FSC: 1310 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-98095 33 = 9977906 0335638 7 M MIL-C-4 8 04 5 (MU) MILITARY MIL-STD-105 -
4、Sampling Procedures and Tables for Inspection by Attributes (ABC-STD-105) MIL-STD-109 - Quality Assurance Terms and Definitions MIL-STD-U68 - Lot -Numbering of Ammunition MIL-STD-1169 - Packaging, Packing and Marking for Shipment of Inert Ammuni- tion Components ous Sampling Procedures and Tables fo
5、r Inspection by Attributes MIL-STD-1235 - Single and Multilevel Continu- DRAWINGS U.S. ARMY MUNITIONS COMMAND 8889313 r Body Assembly 8840508 c Ogive 9224169 c Ogive PUBLICATTONS ARMY EX-8889313 - Equipment Tabulation (Copies of specifications, standards, drawings and publications re- quired by supp
6、liers in connection with specific procurement func- tions should be obtained from the procuring activity or as directed by the Contracting Officer). 3. MQUIREMENTS 3.1 Material.-Materials shall be in accordance with the applicable drawings and specifications. 2 Provided by IHSNot for ResaleNo reprod
7、uction or networking permitted without license from IHS-,-,-MIL-C-LIOLI5 13 = 7777706 0315b37 7 I MIL-(2-48045 (MU) 3.2 Parts.-The parts shall comply with all requirements specified on Drawings (Dwgs) 8889313, 8840508, 9224169, all associated drawings, and with all requirements specified in applicab
8、le specifications. 3.3 Skirt hardness and compression. 3.3.1 Hardness.-The hardness shall be 68 + 10 on the Rockwell E. Scale when tested as specified in 474.2. This requirement is not applicable when skirt is made from tubing or bar stock. 3.3.2 Compression.-The skirt when compressed to 3/4 inch in
9、 a plane normal to its longitudinal axis, shall show no evidence of cracks when tested as specified in 4.4.3. requirement is not applicable when skirt is made from tubing or bar stock. This 3.4 Workmanship.-All parts and assemblies shall be fab- ricated and finished in a thorough, workmanlike manner
10、. They shall be free of burrs, chips, sharp edges, cracks, unblended radii, surface defects, dirt, grease, rust, corrosion products, and other foreign matter. The cleaning method used shall not be injurious to any parts, nor shall the parts be contaminated by the cleaning agents. neat and sharply de
11、fined. tions and tests.-The contractor shall forward copies of the results of any of his examinations or tests to the designated address as required by the contract. (see 6.4). All marking and stamping shall be 3.5 Submission of results of contractor-conducted examina- 3.6 First article testing.-Thi
12、s specification makes provisions for first article testing. Submission of first article quantity by the contractor shall be as specified in the contract. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection.-Unless otherwise specified in the contract or purchase order, the supplier is r
13、esponsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract or order, the supplier may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Gove
14、rnment. the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to The Government reserves 3 I Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-48045 33 7779706 03356110 5 El MIL-C-4
15、 8 04 5 (MU) assure supplies and services conform to prescribed requirements. Reference shall be made to MIL-STD-109 to define terms used herein. The provisions of MIL-A-2550 shall apply. Submission of product.-At the time the completed lot of items deliverable under the contract is submitted to the
16、 Government for acceptance, the contractor shall supply the following information accompanied by a certificate which attests that the information provided is correct and applicable to the product being submitted: A statement that the lot complies with all the quality assurance provisions specified i
17、n this specification. Drawing and specification number and date, together with identification and date of changes thereto. A statement that all material purchased by the contractor meets requirements, when such material is controlled by Government or commercial specifications references in any of th
18、e contractual documents, and that certificates of conformance are on file and available for review. d. Number of items in the lot. e. Date submitted. The certificate shall be signed by a responsible agent of the certifying organization. be substantiated by evidence of the agents authority to bind hi
19、s principal. be required with subsequent certificates unless, during the course of the contract, this authority is vested in another agent of the certifying organization. 4.1.1 a. b. C. The initial certificate submitted shall Substantiation of the agents authority will not 4.2 First article inspecti
20、on. 4.2.1 Submission.-The contractor shall submit a first article quantity as desLgnated by the Contracting Officer Sor evaluation in accordance with the provisions of 4.2.2. (See 6.1) following: The first article sample shall consist of the a. Fifty (50) body assemblies. b. Twenty-five (25) bodies.
21、 c. Twenty-f ive (25) skirts . d. Twenty-five (25) ogives (as applicable) . 4 O Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-48045 13 = 7777706 0315b4L 7 I! MIL-C-4 8 04 5 (MU) All parts and completed assemblies submitted shall have been pro
22、duced by the contractor (or furnished by a supplier) using the same production processes, procedures and equipment as will be used in fulfilling the contract. materials, including packaging and packing, shall be obtained from the same sources of supply as will be used in regular production. of confo
23、rmance. A first article quantity, or portion thereof, as directed by the Contracting Cfficer, shall also be submitted whenever there is a lapse in production for a period in excess of 90 days, or whenever a change occurs in manufactur- ing process (including heat treatment procedures and equipment),
24、 material used, drawing, specification or source of supply as to significantly affect product uniformity as determined by the Government. Prior to submission, the contractor shall inspect the sample to the degree necessary to assure that if conforms to the requirements of the contract and submit a r
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILC480451972CARTRIDGE40MMPROOFXM387E4BODYASSEMBLYANDOGIVEFORMETALPARTSXM387E4 40 MM 防御 炮弹 一般 金属

链接地址:http://www.mydoc123.com/p-441556.html