ARMY MIL-C-45978 A-1992 CANNON 105MM HOWITZER M205《M205型火炮 105MM榴弹炮》.pdf
《ARMY MIL-C-45978 A-1992 CANNON 105MM HOWITZER M205《M205型火炮 105MM榴弹炮》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-C-45978 A-1992 CANNON 105MM HOWITZER M205《M205型火炮 105MM榴弹炮》.pdf(27页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-C-45978A LO 9999906 0502238 O = INCH-POUND 1 MIL-C-4 5978A (AR) 12 February 1992 SUPERSEDING MIL-C-45978 (AR) 3 SEPTEMBER 1986 MILITARY SPECIFICATION CANNON, 105MM HOWITZER: M205 This specification is approved for use by the Department of the Army and is available for use by all Departments and
2、Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification supports the acquisition of the Cannon, 105MM HOWITZER: M205 consisting of the tube and the breech mechanism assembly. This specification includes the minimum essential Engineering and Packaging Requirements and the necess
3、ary Quality Assurance Provisions to determine that these requirements have been met. 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specification, standards, and handbooks. The following specifications, standards, and handbooks form a part of this document to the extent specified herein. Un
4、less otherwise specified, the issues of these documents are those listed in the issue of the Department of Defense Index of Specifications and Standards (DODISS) and supplement thereto, cited in the solicitation (see 6.2). - Beneficial comments (recommendations, additions, deletions) and any pertine
5、nt data which may be of use in improving this document should be addressed to: Commander, Armament Research, Development and Engineering Center, US Army Armament, Munitions and Chemical Command, ATTN: SMCAR-CCB-SC, Watervliet, NY 12189-4050 by using the self-addressed Standardization Document Improv
6、ement Proposal (DD Form 1426) appearing at the end of this document or bv letter. AMSC N/A FSC 1015 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-4597A LO W 999
7、9906 0502219 2 W MIL-C-45978A SPECIFICATIONS MILITARY MIL-C-13931 - Cannon, General Specification for MIL-P-14232 - Parts, Equipment and Tools for Army Materiel, Packaging of Maintenance and Disposition of MIL-1-45607 - Inspection Equipment, Acquisition, MIL-H-63192 - Howitzer, Light, Towed, 105MM:
8、M204 STANDARDS MILITARY MIL-STD-129 - Marking for Shipment and Storage MIL-STD-1190 - Minimum Guidelines for Level C Preservation, Packing and Marking MIL-STD-1235 - Single and Multi-Level Continuous Sampling Procedures and Table for Inspection by Attributes MIL-STD-2073 - DOD Materiel Procedures fo
9、r Development For each of the cycles, the firing plunger shall be activated upon closing the breech to assure that the firing pin operates as required. 4.7.7.3 Test Methods. 4.7.7.3.1 Proof firins test. Proof firing shall be conducted at a Government specified test site. The procedure shall be as fo
10、llows: a. Each cannon or spare tube submitted shall be proof fired b. A facilities mount may be used if necessary. once at 55,000 however, if performance is only degraded, then some threshold must be established to define where reliability failures begin. Allowable degradation thresholds have been e
11、stablished for the various performance parameters. Performance beyond these thresholds constitutes a reliability failure. As long as performance remains above the threshold or is returned above the threshold within a five minute maintenance period, no reliability failure is charged. The allowable de
12、gradation thresholds are: 1. Rate of Fire - maximum 15 RPM (Rounds Per Minute) 2. Rate of Fire - sustained 3-5 RPM (Rounds Per Minute) 50.2 Failure scorins procedure. The following scheme provides the instructions for the use of the Failure Definition (see 60.1.3) for assessing reliability requireme
13、nts of the Cannon, 105MM Howitzer; M205 (see 50-1). These instructions assume that an incident or malfunction has occurred during test, and a record has been prepared against this action to the extent where it is necessary to determine the chargeability of the action. Incidents where the identificat
14、ion of a reliability failure is in doubt will be deferred to a user/developer/tester Scoring Conference. The step-by-step instructions for using the Failure Definition are as follows: Step 1. Record the incident information (i.e. rounds on test item and system, description of incident, nature of mai
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILC45978A1992CANNON105MMHOWITZERM205M205 火炮 105 MM 榴弹炮 PDF

链接地址:http://www.mydoc123.com/p-441471.html