ARMY MIL-B-51092-1962 BORON AMORPHOUS POWDER《无定形硼粉末》.pdf
《ARMY MIL-B-51092-1962 BORON AMORPHOUS POWDER《无定形硼粉末》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-B-51092-1962 BORON AMORPHOUS POWDER《无定形硼粉末》.pdf(10页珍藏版)》请在麦多课文档分享上搜索。
1、i 1. SCOPE 1.1 This specification covers amorphous boron powder for use in the manufacture of pyrotechnics. 2. PIJIcm llOCuIrnES I f 2.1 The following documents of the issue in effect on date of invi- tation for bids form a part of this specification to the extent specified herein 4 SPEC DICAT IONS
2、PR-D-723 - Drums, Fiber JAR-P-112 - Packaging and Packing for Overseas Shipment Drums, Plywood (for drums whose weight of contents does not exceed 200 pounds) . 14se-105 - Sapling Procedures and Tables for Inspection lvI.IILSTD-109 - Inspection Terns and Cefinitions. MIL-STD- - Ifhrking of Shipmmts.
3、 by Attributes. PUBLICAT IOI?S ORD-X608-11 - Procedures and Tables for Continuous Sampling . by Attributes. (Copies of specifications, standards, drawings and publications required by contractors in connection with specific procurement r%nctions should be obtaiaed from the procuring activity or as d
4、irected by the contracting officer). FSC: 6810 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- . I . . . f L.-. * ._ m-B-51 . . r.- “ .i. .-: - 3. RZQU-ITS 3.1 Composition.- The composition of the emorphous boron powder shall . i . T. , be as follow
5、s, when determined as specified in 4.3. Amorphous boron Insoluble in Hydrogen Feroxide -Total magnesium Percent 84.0, minimum (min. ) 1.5; maximum (m. 8.2, max. 3.2 Moisture content.- The moisture content shall be 0.5 percent m. 3.3 Average particle diameter.- The average particle diameter shall be
6、1.0 microns, W., when determined as specified in 4.3.5. 4.1 General auality assurance provisions.- The supplier is responsible for thc.perfomnce of all inspection requirements as specified herein. Ex- cept as otherwise specified the supplier may utilize his own or any other . inspection facilities a
7、nd services acceptable to the Government. Inspection records of the examinations and tests shall be kept complete and available to the Government as specified in the contract .or order. The Government re- serves the right to perform any of the inspections set forth in the speci- fication where such
8、inspections are deemed necessby to assure supplies and services conform to prescribed requirements. Reference shall be made to Standard NJLSTD-lO9 in order to define the terms used herein. Inspection shall be performed in accordance with this specification and other specifi- cations referenced in an
9、y of the cor,tractual documents. 4.Ll Contractor auality assurance system.- If the contractor desires to.t;ilizo a quality-assurance system, which is at variance with the quality asswance provisions of 4.2 and 4.3 and other documents referenced herein, he shall submit a written description of the sy
10、stem to the contracting officer for approval prior to initiation of production. It shall include a description covering controJs for lot formation and identification, inspections to be performed, inspection stations, sampling procedures, rneehods ofinspection (measuring and testing equipment), and p
11、rovisions for control and. disposition of non-conforming material. The written description till be considered accep table when, as a minimum, it provides the quality assursnce provisions required by the provisions of 4.2 and 4.3 and the other documents referenced herein. The contractor shall not be
12、restricted to the inspection station or the method of inspection listed in this specification provided that an equivalent control is included in the approved quality assurance procedure. In cases of dispute as to whether certain procedures of the contractort s system- provide equal assurance, the co
13、mparable procedure of this specification shall apply. The contractor shall notify the Government of, and obtain approval for, any changes to the written procedure that effects the degree of assur- ance re- quired by this specification or other documents referenced herein. 2 Provided by IHSNot for Re
14、saleNo reproduction or networking permitted without license from IHS-,-,-I x 4.1.2 Submission of moduct.- At the time the completed lot of product is .submitted to the Government for acceptance, the contractor shall supply the -following information accompanied by a certificate which attests that th
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 1人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILB510921962BORONAMORPHOUSPOWDER 无定形 粉末 PDF

链接地址:http://www.mydoc123.com/p-440955.html