ARMY MIL-B-48265-1973 BAND OBTURATING FOR 175MM PROJECTILE《用于175MM弹丸的密封箍带》.pdf
《ARMY MIL-B-48265-1973 BAND OBTURATING FOR 175MM PROJECTILE《用于175MM弹丸的密封箍带》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-B-48265-1973 BAND OBTURATING FOR 175MM PROJECTILE《用于175MM弹丸的密封箍带》.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、i i 6- 6V-W MIL-B-48265 (PA) 7 December 1973 MILITARY SPECIFICATION BAND, OBTURATING, FOR 175MM, PROJECTILE This specification is approved for use by all Department and Agencies of the Department of Defense. 1. Scope 1.1 This specification covers one type of obturating 2. -Applicable documents 2.1 T
2、he following documents of the issue in effect on date band for use on the 175MM artillery projectile. of invitation for bids form a part of this specification to the extent specified herein: SPECIFICATIONS MILITARY MIL-A-2550 - STANDARDS MILITARY MIL-STD-105 - MIL-STD-109 - MIL-STD-1168- MIL-STD-116
3、9- MIL-STD-1235- DRAWINGS Ammunition and Special Weapons, General Specification for Sampling Procedures and Tables for inspection by Attributes (ABC-STD-105) Quality Assurance Terms and Definitions Lot Numbering of Ammunition Packaging, Packing and Marking for Ship- ment of Inert Ammunition Componen
4、ts Single and Multilevel Continuous Sampling Procedures and Tables for Inspection by Attributes. Band, Obturating FSC: 1320 .f THIS DOCUMENT CONTAINS 7 PAGES. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-B-4 82w (PA) (Copies of specifications,
5、standards, drawings and publication required by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the- contracting officer. ) _. -. 3. REQUIREMENTS -1 .* I -.- 1 - 3.1 Material. The material shall be in accordance with applic
6、able drawings and specifications. - 3.2 Obturating band. - The obtirating bands shall comply The with all requirements specified on Drawing (dwg.) 9211857. demensions of the finished bands shall apply after moisture conditioning, and after the bands have cooled to room temperature. to examination te
7、st shall be moisture conditioned until 2.0 to 3.0 percent, by weight,. moisture content is attained (see 6.4). shall be as specified in 4.4.1. 3.3- Tensile strength. The obturating bands shall have a tensile strength of 6,000 pounds per square inch (psi), minimum (min.) when tested as specified in 4
8、.4.2. The tensile strength shall apply to bands which have been moisture conditioned. and finished in a thorough, workmanlike manner and all manufacturing and processing operations shall be correctly performed. shall be clean and free of flash, air bubbles, holes, blisters, cracks, dirt, grease and
9、other foreign matter. visions for first article inspection. Requirements for the submission of first article samples by the contractor shall be as specified in the contract 3.2.1 Moisture content. The obturating bands to be subjected Testing 3.4 Workmanship. All obturating bands shall be fabricated
10、The bands 3.5 First Article Inspection. This specification makes pro- 4. .QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for Inspection.-Unless otherwise specified in the contract or-purchase order, the supplier is responsible for the performance of all inspection requinements as specified herein.
11、Except as otherwise specified in the contract or.order, the supplier may use his own or any other facilities suitable for the performance of the inspection re- quirements specified herein, unless disapproved by the Govern- 2 , - - Provided by IHSNot for ResaleNo reproduction or networking permitted
12、without license from IHS-,-,-: ., MIL-9-48265 13 U 7799906 0318073 b U t MIL-B-48265 (PA) ment. The overnment reserves the right to perform any of the Inspections set forth In the specification where such Inspections are deemed necessary to assure supplies and ser- vices conform to prescribed requir
13、ements. Reference shall be made to MIL-STD-109 to define terms used herein. The provl- slons of MIE-A-2550 shall apply. Submission of Product,- At the time each completed lot of Items deliverable under the contract Is submitted to the Government for acceptance, the contractor shall supply the fol- l
14、owing Information accompanied by a certificate which attests that the Information provided Is correct and applicable to the product being submitted. a. A statement that the lot complies with all of the quality assurance provisions specified in this specification. b. Drawing and specification number
15、and date, together with identification and date of changes thereto. C. A statement that all material purchased by the con- tractor meets requirements, when such material is controlled by Government or commercial specifications referenced in any of the contractual documents, and that certificates of
16、conformance are on file and available for review. ?I - 4.1.1 -_ 84 d. Number of items in the lot. e. Date submitted. The certificate shall be signed by a responsible agent of the . certifying organization. The initial certificate submitted shall be substantiated by evidence of the agent?s authority
17、to bind his principal, Substantiation of the agent?s authority will not be required with subsequent certificates unless, during the course of the contract, this authority is vested in another agent of the certifying organization. 4.2 First Article Inspection 4.2.1 Submission. The contractor shall su
18、bmit a first article sample as designated by the contracting officer for evalua- tion in accordance with the provisions of 4.2.2. The first article sample shall consist of twenty-five bands which have been produced by the contractor or furnished by a supplier and which have been manufactured using t
19、he same production processes, procedures and equipment which will be used in fulfilling the contract, All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used in regular production. Prior to submission, the contractor shall inspect th
20、e sample to the ?degree necessary to assure that it conforms to .- _ - .- . . 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-B-48265 (PA) the requirements ofthe contract and submit a record of this inspec- tion with the sample, Including state
21、ments of findings for materials, processes and tests. A sample containing known defects will not be submitted unless specifically authorized by the . Contracting Officer. A first article sample, or portion thereof, as directed by the contracting officer, shall also be submitted whenever there Is a l
22、apse in production for a period In excess of 90 days or whenever a change occurs in manufacturing process, 1 material used, drawing or specification such as to significantly . affect product uniformity as determined by the Government 0- I I 4.2.2 Inspection to be performed. Assemblies and components
23、 will be subjected by the Government to any or all the examinations or tests specified in 4.3.2 and 4.3.3 of this specification and any or all requirements of the applicable drawings. 4.2.3 Rejection. If any assembly or components fails to comply with any of the applicable requirements, the first ar
24、ticle sample shall be rejected. The Government reserves the right to teiminate its Inspection upon any failure of an assembly to com- ponent to comply with any of the stated requirements. 4.3 Inspection Provisions 4.3.1 Lot formation.-The term “inspection lot“ as used in this specification is define
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILB482651973BANDOBTURATINGFOR175MMPROJECTILE 用于 175 MM 弹丸 密封 PDF

链接地址:http://www.mydoc123.com/p-440905.html