ANSI CSA C22.2 NO.4248.19-15-2015 Fuseholders - Part 19 Photovoltaic fuseholders (First Edition).pdf
《ANSI CSA C22.2 NO.4248.19-15-2015 Fuseholders - Part 19 Photovoltaic fuseholders (First Edition).pdf》由会员分享,可在线阅读,更多相关《ANSI CSA C22.2 NO.4248.19-15-2015 Fuseholders - Part 19 Photovoltaic fuseholders (First Edition).pdf(15页珍藏版)》请在麦多课文档分享上搜索。
1、C22.2 No. 4248.19-15Fuseholders Part 19: Photovoltaic fuseholdersLegal Notice for StandardsCanadian Standards Association (operating as “CSA Group”) develops standards through a consensus standards development process approved by the Standards Council of Canada. This process brings together voluntee
2、rs representing varied viewpoints and interests to achieve consensus and develop a standard. Although CSA Group administers the process and establishes rules to promote fairness in achieving consensus, it does not independently test, evaluate, or verify the content of standards.Disclaimer and exclus
3、ion of liabilityThis document is provided without any representations, warranties, or conditions of any kind, express or implied, including, without limitation, implied warranties or conditions concerning this documents fitness for a particular purpose or use, its merchantability, or its non-infring
4、ement of any third partys intellectual property rights. CSA Group does not warrant the accuracy, completeness, or currency of any of the information published in this document. CSA Group makes no representations or warranties regarding this documents compliance with any applicable statute, rule, or
5、regulation.IN NO EVENT SHALL CSA GROUP, ITS VOLUNTEERS, MEMBERS, SUBSIDIARIES, OR AFFILIATED COMPANIES, OR THEIR EMPLOYEES, DIRECTORS, OR OFFICERS, BE LIABLE FOR ANY DIRECT, INDIRECT, OR INCIDENTAL DAMAGES, INJURY, LOSS, COSTS, OR EXPENSES, HOWSOEVER CAUSED, INCLUDING BUT NOT LIMITED TO SPECIAL OR C
6、ONSEQUENTIAL DAMAGES, LOST REVENUE, BUSINESS INTERRUPTION, LOST OR DAMAGED DATA, OR ANY OTHER COMMERCIAL OR ECONOMIC LOSS, WHETHER BASED IN CONTRACT, TORT (INCLUDING NEGLIGENCE), OR ANY OTHER THEORY OF LIABILITY, ARISING OUT OF OR RESULTING FROM ACCESS TO OR POSSESSION OR USE OF THIS DOCUMENT, EVEN
7、IF CSA GROUP HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES, INJURY, LOSS, COSTS, OR EXPENSES.In publishing and making this document available, CSA Group is not undertaking to render professional or other services for or on behalf of any person or entity or to perform any duty owed by any perso
8、n or entity to another person or entity. The information in this document is directed to those who have the appropriate degree of experience to use and apply its contents, and CSA Group accepts no responsibility whatsoever arising in any way from any and all use of or reliance on the information con
9、tained in this document.CSA Group is a private not-for-profit company that publishes voluntary standards and related documents. CSA Group has no power, nor does it undertake, to enforce compliance with the contents of the standards or other documents it publishes.Intellectual property rights and own
10、ershipAs between CSA Group and the users of this document (whether it be in printed or electronic form), CSA Group is the owner, or the authorized licensee, of all works contained herein that are protected by copyright, all trade-marks (except as otherwise noted to the contrary), and all inventions
11、and trade secrets that may be contained in this document, whether or not such inventions and trade secrets are protected by patents and applications for patents. Without limitation, the unauthorized use, modification, copying, or disclosure of this document may violate laws that protect CSA Groups a
12、nd/or others intellectual property and may give rise to a right in CSA Group and/or others to seek legal redress for such use, modification, copying, or disclosure. To the extent permitted by licence or by law, CSA Group reserves all intellectual property rights in this document.Patent rightsAttenti
13、on is drawn to the possibility that some of the elements of this standard may be the subject of patent rights. CSA Group shall not be held responsible for identifying any or all such patent rights. Users of this standard are expressly advised that determination of the validity of any such patent rig
14、hts is entirely their own responsibility.Authorized use of this documentThis document is being provided by CSA Group for informational and non-commercial use only. The user of this document is authorized to do only the following:If this document is in electronic form: load this document onto a compu
15、ter for the sole purpose of reviewing it; search and browse this document; and print this document if it is in PDF format.Limited copies of this document in print or paper form may be distributed only to persons who are authorized by CSA Group to have such copies, and only if this Legal Notice appea
16、rs on each such copy.In addition, users may not and may not permit others to alter this document in any way or remove this Legal Notice from the attached standard; sell this document without authorization from CSA Group; or make an electronic copy of this document.If you do not agree with any of the
17、 terms and conditions contained in this Legal Notice, you may not load or use this document or make any copies of the contents hereof, and if you do make such copies, you are required to destroy them immediately. Use of this document constitutes your acceptance of the terms and conditions of this Le
18、gal Notice.Standards Update ServiceC22.2 No. 4248.19-15November 2015Title: Fuseholders Part 19: Photovoltaic fuseholdersTo register for e-mail notification about any updates to this publication go to shop.csa.ca click on CSA Update ServiceThe List ID that you will need to register for updates to thi
19、s publication is 2423 255.If you require assistance, please e-mail techsupportcsagroup.org or call 416-747-2233.Visit CSA Groups policy on privacy at www.csagroup.org/legal to find out how we protect your personal information.Association of Standardization and CertificationNMX-J-009/4248/19-ANCEFirs
20、t EditionCSA GroupCSA C22.2 No. 4248.19First EditionUnderwriters Laboratories Inc.UL 4248-19First EditionFuseholders Part 19: Photovoltaic FuseholdersNovember 13, 2015ANSI/UL 4248-19-2015Commitment for AmendmentsThis standard is issued jointly by the Association of Standardization and Certification
21、(ANCE), theCanadian Standards Association (operating as “CSA Group”), and Underwriters Laboratories Inc. (UL).Comments or proposals for revisions on any part of the standard may be submitted to ANCE, CSAGroup, or UL at anytime. Revisions to this standard will be made only after processing according
22、to thestandards development procedures of ANCE, CSA Group, and UL. CSA Group and UL will issuerevisions to this standard by means of a new edition or revised or additional pages bearing their dateof issue. ANCE will incorporate the same revisions into a new edition of the standard bearing the sameda
23、te of issue as the CSA Group and UL pages.Copyright 2015Rights reserved in favor of ANCE.ISBN 978-1-77139-678-3 2015 CSA GroupAll rights reserved. No part of this publication may be reproduced in any form whatsoever without theprior permission of the publisher.This Standard is subject to periodic re
24、view, and suggestions for its improvement will be referred to theappropriate committee. To submit a proposal for change, please send the following information toinquirescsagroup.org and include Proposal for change in the subject line: Standard designation(number); relevant clause, table, and/or figu
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ANSICSAC222NO424819152015FUSEHOLDERSPART19PHOTOVOLTAICFUSEHOLDERSFIRSTEDITIONPDF

链接地址:http://www.mydoc123.com/p-434528.html