ANSI AWWA C620-2007 Spray-Applied In-Place Epoxy Lining of Water Pipelines 3 In (75 mm) and Larger.pdf
《ANSI AWWA C620-2007 Spray-Applied In-Place Epoxy Lining of Water Pipelines 3 In (75 mm) and Larger.pdf》由会员分享,可在线阅读,更多相关《ANSI AWWA C620-2007 Spray-Applied In-Place Epoxy Lining of Water Pipelines 3 In (75 mm) and Larger.pdf(32页珍藏版)》请在麦多课文档分享上搜索。
1、The Authoritative Resource for Safe WaterANSI/AWWA C620-07(First Edition)AWWA StandardEffective date: Oct. 1, 2008.This first edition approved by AWWA Board of Directors June 24, 2007.Approved by American National Standards Institute July 29, 2008.Spray-Applied In-Place Epoxy Lining of Water Pipelin
2、es, 3 In. (75 mm) and Larger6666 West Quincy AvenueDenver, CO 80235-3098T 800.926.7337www.awwa.orgAdvocacyCommunicationsConferencesEducation and TrainingScience and TechnologySectionsiiAWWA StandardThis document is an American Water Works Association (AWWA) standard. It is not a specification. AWWA
3、standardsdescribe minimum requirements and do not contain all of the engineering and administrative information normallycontained in specifications. The AWWA standards usually contain options that must be evaluated by the user of thestandard. Until each optional feature is specified by the user, the
4、 product or service is not fully defined. AWWApublication of a standard does not constitute endorsement of any product or product type, nor does AWWA test, certify,or approve any product. The use of AWWA standards is entirely voluntary. This standard does not supersede or takeprecedence over or disp
5、lace any applicable law, regulation, or codes of any governmental authority. AWWA standardsare intended to represent a consensus of the water supply industry that the product described will provide satisfactoryservice. When AWWA revises or withdraws this standard, an official notice of action will b
6、e placed on the first page ofthe classified advertising section of Journal AWWA. The action becomes effective on the first day of the month followingthe month of Journal AWWA publication of the official notice.American National StandardAn American National Standard implies a consensus of those subst
7、antially concerned with its scope and provisions. AnAmerican National Standard is intended as a guide to aid the manufacturer, the consumer, and the general public. Theexistence of an American National Standard does not in any respect preclude anyone, whether that person hasapproved the standard or
8、not, from manufacturing, marketing, purchasing, or using products, processes, or proceduresnot conforming to the standard. American National Standards are subject to periodic review, and users are cautionedto obtain the latest editions. Producers of goods made in conformity with an American National
9、 Standard areencouraged to state on their own responsibility in advertising and promotional materials or on tags or labels that thegoods are produced in conformity with particular American National Standards.CAUTION NOTICE: The American National Standards Institute (ANSI) approval date on the front
10、cover of this standardindicates completion of the ANSI approval process. This American National Standard may be revised or withdrawn atany time. ANSI procedures require that action be taken to reaffirm, revise, or withdraw this standard no later than fiveyears from the date of publication. Purchaser
11、s of American National Standards may receive current information on allstandards by calling or writing the American National Standards Institute, 25 West 43rd Street, Fourth Floor, New York,NY 10036; (212) 642-4900.All rights reserved. No part of this publication may be reproduced or transmitted in
12、any form or by any means, electronicor mechanical, including photocopy, recording, or any information or retrieval system, except in the form of briefexcerpts or quotations for review purposes, without the written permission of the publisher. Copyright 2008 by American Water Works AssociationPrinted
13、 in USAiiiCommittee PersonnelThe AWWA Standards Committee on Pipe Rehabilitation, which developed and approvedthis standard, had the following personnel at the time of approval:Edward O. Norris, ChairDarin H. Thomas, Vice-ChairGeneral Interest MembersD.T. Bradley,*Standards Council Liaison, Oak Lodg
14、e Water District, Milwaukie, Ore. (AWWA)R.W. Bonds, Ductile Iron Pipe Research Assoc., Birmingham, Ala. (AWWA)P. Glus, Malcolm Pirnie Inc., Jackson Heights, N.Y. (AWWA)T.J. Hodnik, Nies Engineering Inc., Hammond, Ind. (AWWA)T.D. Humphrey, Winzler limits of pipeline shutdowns, if servicerequirements
15、make limits necessary; location of access manholes, location, type, andxsize of valves; location of interconnecting pipelines, hydrant branches, and servicepipes; location of fittings and restrictions that could interfere with cleaning and liningoperations; location, diameter, and connections of tem
16、porary bypass, if required; andother details of the pipe within the scope of the contract between the purchaser andthe contractor.3. Characteristics of epoxy lining. Nominal dry film thickness (DFT) ofepoxy lining requiredgenerally 40 mil (1 mm) and minimum cure time of epoxybetween epoxy applicatio
17、n and reintroduction of water into the pipe.4. Services furnished by purchaser. Description of services or field operationsto be performed by the purchaser, such as locating the main to be cleaned and lined,removal and replacement of line valves, operation of valves, tagging valves that sepa-rate th
18、e main to be cleaned and lined from the water system to prevent accidentalopening, shutting off inflow of water from connecting pipelines, locating and operat-ing blowoffs, connecting and disconnecting temporary bypasses to customer services,obtaining permits required for the work, handling customer
19、 contacts, disinfection,and conducting flow tests.5. Additional work to be performed by constructor. Description of work,including repairs to deteriorated pipe, excavation, backfill, and resurfacing work ataccess excavations; method of opening and closing access openings in the pipeline;flushing, la
20、ying, and removing temporary bypass pipe; and operation of main line orblowoff valves.NOTE: When it is necessary to repair deteriorated pipe before lining, the pipe willbe repaired by the purchaser or under provisions of the contract between thepurchaser and the constructor.6. Water for cleaning and
21、 lining operations. Location of water sources,method of providing, quantity available, and pressure information.7. Disposal of cleaning water and debris. Requirements for the disposal ofcleaning water, old lining, and other debris; instructions regarding permits from theresponsible authorities.8. Pu
22、rchaser options. Options that may be specified by the purchaser:a. Affidavit of compliance.b. Access openings and pavement repairs.c. Traffic control.d. Cleaning of valves, installing new bolts and gaskets.e. Temporary bypass.xif. Disinfection of temporary bypass.g. Replacing/repairing faulty/leakin
23、g valves.h. Cathodic protection.i. Service box repairs.j. Meter upgrades.k. Hydrant replacement.9. Rejection of work. The purchaser should specify a procedure for reportingthe rejection of work not performed in accordance with this standard. The purchasershould also outline the responsibility of the
24、 purchaser and the constructor in cases ofnonstandard work.10. Warranty period. The purchaser should specify the duration of the war-ranty period and warranty inspection protocols and outline the responsibility of thepurchaser and the constructor in cases of nonconforming work discovered during thew
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ANSIAWWAC6202007SPRAYAPPLIEDINPLACEEPOXYLININGOFWATERPIPELINES3IN75MMANDLARGERPDF

链接地址:http://www.mydoc123.com/p-434082.html