ANSI ASTM F2019-2011 Standard Practice for Rehabilitation of Existing Pipelines and Conduits by the Pulled in Place Installation of Glass Reinforced Plastic (GRP) Cured-in-Place Th.pdf
《ANSI ASTM F2019-2011 Standard Practice for Rehabilitation of Existing Pipelines and Conduits by the Pulled in Place Installation of Glass Reinforced Plastic (GRP) Cured-in-Place Th.pdf》由会员分享,可在线阅读,更多相关《ANSI ASTM F2019-2011 Standard Practice for Rehabilitation of Existing Pipelines and Conduits by the Pulled in Place Installation of Glass Reinforced Plastic (GRP) Cured-in-Place Th.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: F2019 11Standard Practice forRehabilitation of Existing Pipelines and Conduits by thePulled in Place Installation of Glass Reinforced Plastic(GRP) Cured-in-Place Thermosetting Resin Pipe (CIPP)1This standard is issued under the fixed designation F2019; the number immediately following t
2、he designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope*1.1 This practice covers t
3、he procedures for the reconstruc-tion of pipelines and conduits (4 to 60 in. (100 to 1500 mm)diameter) by the pulled-in place installation of a resin-impregnated, flexible fabric tube into an existing conduitfollowed by inflation with compressed air (see Fig. 1). Theresin/fabric tube can be cured by
4、 either the flow through thefabric tube of mixed air and steam or hot water or by use ofultraviolet light. When cured, the finished cured-in-place pipewill be continuous and tight fitting. This reconstruction processcan be used in a variety of gravity flow applications such assanitary sewers, storm
5、sewers, process piping, electricalconduits, ventilation systems, and pressure applications.1.2 The values stated in inch-pound units are to be regardedas standard. The values given in parentheses are mathematicalconversions to SI units that are provided for information onlyand are not considered sta
6、ndard.1.3 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Refere
7、nced Documents2.1 ASTM Standards:2D543 Practices for Evaluating the Resistance of Plastics toChemical ReagentsD578 Specification for Glass Fiber StrandsD638 Test Method for Tensile Properties of PlasticsD790 Test Methods for Flexural Properties of Unreinforcedand Reinforced Plastics and Electrical I
8、nsulating Materi-alsD1600 Terminology forAbbreviated Terms Relating to Plas-ticsD3039/D3039M Test Method for Tensile Properties of Poly-mer Matrix Composite MaterialsD3567 Practice for Determining Dimensions of “Fiberglass”(Glass-Fiber-Reinforced Thermosetting Resin) Pipe andFittingsD5813 Specificat
9、ion for Cured-In-Place ThermosettingResin Sewer Piping SystemsF412 Terminology Relating to Plastic Piping SystemsF1216 Practice for Rehabilitation of Existing Pipelines andConduits by the Inversion and Curing of a Resin-Impregnated TubeF1417 Practice for Installation Acceptance of Plastic Non-pressu
10、re Sewer Lines Using Low-Pressure Air2.2 AWWA Standard:Manual on Cleaning and Lining Water Mains, M2832.3 NASSCO Standard:Recommended Specifications for Sewer Collection SystemRehabilitation43. Terminology3.1 General:3.1.1 Definitions are in accordance with Terminology F412.Abbreviations are in acco
11、rdance with Abbreviations D1600,unless otherwise indicated.3.2 Definitions of Terms Specific to This Standard:3.2.1 calibration hosean impermeable bladder installedinside the fabric tube, and inflated with air or steam, or both topress the tube firmly against the wall of the existing pipe untilthe r
12、esin is cured with air and steam or ultraviolet light. Thecalibration hose shall be removed when the installation isfinished.1This practice is under the jurisdiction of ASTM Committee F17 on PlasticPiping Systems and is the direct responsibility of Subcommittee F17.67 onTrenchless Plastic Pipeline T
13、echnology.Current edition approved Sept. 1, 2011. Published September 2011. Originallyapproved in 2000. Last previous edition approved in 2009 as F2019 03R09. DOI:10.1520/F2019-11.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org
14、. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3Available from American Water Works Association (AWWA), 6666 W. QuincyAve., Denver, CO 80235, http:/www.awwa.org.4Available from NationalAssociation of Sewer Service Companies, 423
15、 W. KingStreet, Suite 3000, Chambersburg, PA 17201.*A Summary of Changes section appears at the end of this standardCopyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United StatesThis international standard was developed in accordance with internatio
16、nally recognized principles on standardization established in the Decision on Principles for theDevelopment of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.13.2.2 cured-in-place pipe (CIPP)a hollow cylinder con
17、-sisting of a glass reinforced plastic (GRP) fabric tube withcured thermosetting resin. External foils are included. TheCIPP is formed within an existing pipe and takes the shape ofthe pipe.3.2.3 delaminationseparation of the layers in the sand-wich constructed CIPP3.2.4 dry spotan area of the fabri
18、c tube, where the finishedCIPP is deficient or devoid of resin.3.2.5 fiberglass compositea material that is resistant tonormal sewer effluents as tested in accordance with 6.4.1 and6.4.2 of Specification D5813.3.2.6 fabric tubeflexible fiberglass materials formed into atubular shape which is saturat
19、ed with resin prior to installationand holds the resin in place as a permanent part of the installedcured-in-place pipe as further described in 5.2.1.3.2.7 lifta portion of the CIPP that is a departure from theexisting conduit wall forming a section of reverse curvature inthe CIPP.3.2.8 sliding foil
20、a plastic foil installed prior to the fabrictube covering the lower of the circumference of the existingpipe to reduce friction and to protect the soft fabric tube whilebeing drawn into the host pipe.FIG. 1 Cured-In-Place Pipe Installation Method (Air/Steam)F2019 1124. Significance and Use4.1 This p
21、ractice is for use by designers and specifiers,regulatory agencies, owners and inspection organizations whoare involved in the rehabilitation of conduits through the use ofa resin-impregnated fabric tube, pulled in place through anexisting conduit and subsequently inflated and cured. As forany stand
22、ard practice, modifications may be required forspecific job conditions.5. Recommended Materials and Manufacture5.1 GeneralThe fabric tube, resin and external prelinersshall produce a CIPP that meets the requirements of thesespecifications.5.2 CIPP Wall CompositionThe wall shall consist of acorrosion
23、 resistant fiberglass fabric tube (Fig. 2) saturated witha thermosetting (cross-linked) resin, and if used a fillermaterial.5.2.1 Fabric TubeThe fabric tube shall consist of at leasttwo separate tubes made of corrosion resistant (E-CR orequivalent) glass fibers in accordance with Specification D578.
24、Where a removable calibration hose is used, the internalsurface shall consist of a resin rich layer for high chemical andabrasion resistance. The fabric tube shall further be constructedwith longitudinal unidirectional glass roving of sufficientstrength to negotiate a pulling force at least equal to
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ANSIASTMF20192011STANDARDPRACTICEFORREHABILITATIONOFEXISTINGPIPELINESANDCONDUITSBYTHEPULLEDINPLACEINSTALLATIONOFGLASSREINFORCEDPLASTICGRPCUREDINPLACETHPDF

链接地址:http://www.mydoc123.com/p-432994.html