ANSI ASTM E3010-2015 Standard Practice for Installation Commissioning Operation and Maintenance Process (ICOMP) of Photovoltaic Arrays.pdf
《ANSI ASTM E3010-2015 Standard Practice for Installation Commissioning Operation and Maintenance Process (ICOMP) of Photovoltaic Arrays.pdf》由会员分享,可在线阅读,更多相关《ANSI ASTM E3010-2015 Standard Practice for Installation Commissioning Operation and Maintenance Process (ICOMP) of Photovoltaic Arrays.pdf(11页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: E3010 15 An American National StandardStandard Practice forInstallation, Commissioning, Operation, and MaintenanceProcess (ICOMP) of Photovoltaic Arrays1This standard is issued under the fixed designation E3010; the number immediately following the designation indicates the year oforigi
2、nal adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice details the minimum requirements forinstallation,
3、commissioning, operations, and maintenance pro-cesses to ensure safe and reliable power generation for theexpected life of the photovoltaic system. Specifically dealingwith commercial photovoltaic installations, this practice coversa broad spectrum of designs and applications and is focused onthe pr
4、oper process to ensure quality.1.2 This practice does not cover the electrical aspects ofinstallation found in existing and national codes and does notreplace or supersede details of electrical installation covered bythe same. The practice does address the integration of bestpractices into design an
5、d construction.1.3 This practice shall not dictate specific design criteria orfavor any product or technology.1.4 This practice shall be focused on the proper, docu-mented process required to build and operate a quality PV plantas defined in Section 3.1.5 Integration of best practices shall be relev
6、ant to thisstandard and promote a mechanism for rapid evolution andreaction to changes or events. Conformity assessment for PVpower plants is being developed through the IEC System forCertification to Standards Relating to Equipment for Use inRenewable EnergyApplications (IECRE System). Sandia Labsh
7、as developed several model documents that may be adoptedas acceptable consensus standards through other standardsdevelopment organizations.1.6 The standard is divided into three key areas:1.6.1 Design, engineering, and construction of the PV plant.Systems should be designed with operation and mainte
8、nance(O monitor-ing of performance indicators, measures to track and maximizeanticipated performance, diagnostic measures, troubleshooting,and documentation.3.2.4.1 DiscussionThis includes controllable or modifi-able maintenance items that impact system yield, uptime,availability, and the ability to
9、 operate effectively under existinglocal environmental and climatological conditions, and site-related activities such as module washing and upkeep ofvegetation for both performance and safety reasons.4. Significance and Use4.1 With the rapid expansion of the commercial photovol-taic market and the
10、various standards and independent certifi-cation entities evolving, a consensus standard practice for theICOMP process is needed to bring consistency to the market.4.2 Investors and insurance companies need consistency ofproduct and standards to reduce costs of capital and underwrit-ing. Use of a co
11、nsensus standard practice is expected toimprove consistency and reduce risk for investors.4Available from American National Standards Institute (ANSI), 25 W. 43rd St.,4th Floor, New York, NY 10036, http:/www.ansi.org.5Available from Underwriters Laboratories (UL), 2600 N.W. Lake Rd., Camas,WA 98607-
12、8542, http:/.6Available from Institute of Electrical and Electronics Engineers, Inc. (IEEE),445 Hoes Ln., Piscataway, NJ 08854, http:/www.ieee.org.7Available from National Electrical Contractors Association (NECA), 3Bethesda Metro Center, Suite 1100, Bethesda, MA 20814, http:/www.necanet.org.8Availa
13、ble from National Fire Protection Association (NFPA), 1 BatterymarchPark, Quincy, MA 02169-7471, http:/www.nfpa.org.9PDF available from Solar America Board for Codes and Standards (SolarABCs), www.solarabcs.org/about/publications.10Available from National Renewable Energy Laboratory (NREL), 901 D,St
14、reet, S.W. Suite 930, Washington, DC 20024, http:/www.nrel.gov/docs/fy15osti/63235.pdf11Available from Sandia National Laboratories (SNL), energy.sandia.gov12Available from SunSpec Alliance, 4030 Moorpark Ave, Suite 109, San Jose,CA 95117.E3010 1524.3 Photovoltaic systems operate in harsh environmen
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ANSIASTME30102015STANDARDPRACTICEFORINSTALLATIONCOMMISSIONINGOPERATIONANDMAINTENANCEPROCESSICOMPOFPHOTOVOLTAICARRAYSPDF

链接地址:http://www.mydoc123.com/p-432686.html