1、AN AMERICAN NATIONAL STANDARD ASME POM 101-2013Performance-Related Outage InspectionsASME POM 101-2013Performance-Related OutageInspectionsAN AMERICAN NATIONAL STANDARDTwo Park Avenue New York, NY 10016 USADate of Issuance: January 17, 2014The next edition of this Standard is scheduled for publicati
2、on in 2019. There will be no writteninterpretations of the requirements of this Standard issued to this edition.Errata to codes and standards may be posted on the ASME Web site under the Committee Pages toprovide corrections to incorrectly published items, or to correct typographical or grammatical
3、errorsin codes and standards. Such errata shall be used on the date posted.The Committee Pages can be found at http:/cstools.asme.org/. There is an option available toautomatically receive an e-mail notification when errata are posted to a particular code or standard.This option can be found on the
4、appropriate Committee Page after selecting “Errata” in the “PublicationInformation” section.ASME is the registered trademark of The American Society of Mechanical Engineers.This code or standard was developed under procedures accredited as meeting the criteria for American NationalStandards. The Sta
5、ndards Committee that approved the code or standard was balanced to assure that individuals fromcompetent and concerned interests have had an opportunity to participate. The proposed code or standard was madeavailable for public review and comment that provides an opportunity for additional public i
6、nput from industry, academia,regulatory agencies, and the public-at-large.ASME does not “approve,” “rate,” or “endorse” any item, construction, proprietary device, or activity.ASME does not take any position with respect to the validity of any patent rights asserted in connection with anyitems menti
7、oned in this document, and does not undertake to insure anyone utilizing a standard against liability forinfringement of any applicable letters patent, nor assumes any such liability. Users of a code or standard are expresslyadvised that determination of the validity of any such patent rights, and t
8、he risk of infringement of such rights, isentirely their own responsibility.Participation by federal agency representative(s) or person(s) affiliated with industry is not to be interpreted asgovernment or industry endorsement of this code or standard.No part of this document may be reproduced in any
9、 form,in an electronic retrieval system or otherwise,without the prior written permission of the publisher.The American Society of Mechanical EngineersTwo Park Avenue, New York, NY 10016-5990Copyright 2014 byTHE AMERICAN SOCIETY OF MECHANICAL ENGINEERSAll rights reservedPrinted in U.S.A.CONTENTSFore
10、word ivCommittee Roster . vCorrespondence With the PTC Committee viIntroduction . vii1 Object and Scope . 12 Acronyms . 13 Guiding Principles. 14 Specific Equipment Considerations . 25 Instruments and Methods of Measurement 26 Report of Results 2Nonmandatory AppendicesA Air Heater (Tubular) . 3B Blo
11、wdown Tank . 6C Condenser Steam Side . 8D Condenser Water Box and Tube-Side Inspection Guidelines . 11E Cooling Tower Outage Inspection Guidelines . 14F Electrostatic Precipitator 19G Feedwater Heaters and Deaerators . 21H Heat Recovery Steam Generators . 24I Boiler Setting Air In-Leakage and Regene
12、rative (Rotary) Air HeaterInspection Guidelines 39J Boiler Steam- and Water-Side Outage Inspection Guidelines . 44K Safety Considerations 48iiiFOREWORDPOM 101, Performance Related Outage Inspections, is the first standard in a planned series ofpower plant performance operation and maintenance standa
13、rds. Related to and initially sponsoredand staffed by the Performance Test Code Standards Committee, these standards do not prescribetesting activities, but if followed will assist in the improvement of power plant performance andreliability.In June 2007, the Performance Test Code Standards Committe
14、e approved the charter for theseries of standards on operation and maintenance activities related to power plant performance.The ASME Board on Standardization and Testing approved this Standard on October 7, 2013. Itwas approved as an American National Standard by the ANSI Board of Standards Review
15、onDecember 4, 2013.ivASME PTC COMMITTEEPerformance Test CodesSTANDARDS COMMITTEE OFFICERSP. G. Albert, ChairJ. W. Milton, Vice ChairJ. H. Karian, SecretarySTANDARDS COMMITTEE PERSONNELP. G. Albert, General Electric Co.R. P. Allen, ConsultantJ. M. Burns, Burns Engineering ServicesW. C. Campbell, True
16、 North Consulting, LLCM. J. Dooley, Alstom PowerG. J. Gerber, ConsultantP. M. Gerhart, University of EvansvilleR. E. Henry, Sargent it is the second standard in the plannedseries of POM standards and will be published soon.viiINTENTIONALLY LEFT BLANKviiiASME POM 101-2013PERFORMANCE-RELATED OUTAGE IN
17、SPECTIONS1 OBJECT AND SCOPE1.1 ObjectThis Standard provides guidelines for equipmentinspections that are designed to ultimately improve thethermal performance or efficiency of the power plant.By following these guidelines, many issues identifiedduring an inspection, upon resolution, will also improv
18、ethe reliability of the plant.1.2 ScopeThis Standard provides guidelines for equipmentinspections of power plants using fossil fuels duringshutdown or outage periods. Some portions of this docu-ment may be applicable to other types of power plants.2 ACRONYMSThe following acronyms are used in this St
19、andard:AH: Air HeaterESP: ElectroStatic PrecipitatorFD: Forced DraftGT: Gas TurbineHP: High PressureHRSG: Heat Recovery Steam GeneratorIP: Intermediate PressureLOI: Loss On IgnitionLOTO: LockOut/TagOutLP: Low PressureNDT: NonDestructive TestingOEM: Original Equipment ManufacturerP do not relyon ment
20、al notes. This is critical to ensure all findingswill be included in the inspection report.(c) Obey all site safety rules.3.5 Postinspection ActivitiesThe following items should be completed immedi-ately following the inspection:(a) Report the significant findings from the inspec-tions to the respon
21、sible plant contacts.(b) Report any safety issues found to correct andremove the hazards.(c) Ensure all tools and materials taken on the inspec-tion are returned to their proper storage locations andthat nothing was left out in the field.(d) Sign out on the appropriate forms, as needed (suchas LOTO
22、or confined space permits).(e) Document all findings in a report that is retrievablein the future.(f) Summarize all recommended actions and alertappropriate personnel as needed for implementation.2(g) Plan for a reinspection if recommended actionsrequire it.4 SPECIFIC EQUIPMENT CONSIDERATIONSAdditio
23、nal documentation on specific equipment con-siderations is provided in the appendices.5 INSTRUMENTS AND METHODS OFMEASUREMENTThe following is a list of some of the instrumentationavailable to support equipment inspections:(a) digital/photographic cameraNOTE: Be sure to take notes with each picture i
24、nstrument ID,location, time, etc.(b) ultrasonic depth meters for determining wallthickness of metal pieces(c) rulers and tape measures(d) magnifying glasses6 REPORT OF RESULTSWhen reporting the results of an outage inspection,the following information should be included:(a) site information(b) date
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ANSIASMEPOM1012013PERFORMANCERELATEDOUTAGEINSPECTIONSPDF

链接地址:http://www.mydoc123.com/p-432031.html